HomeMy WebLinkAboutSAW-2022-01646--NWP 39 Verification.pdfU.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2022-01646 County: Wake U.S.G.S. Quad: NC -Raleigh East GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Wake Stone Property Company Bose Bratton Address: 6721 Knightdale Boulevard Knightdale, North Carolina 27545 Size (acres) —49 acres Nearest Town Kniahtdale Nearest Waterway UT to Neuse River River Basin Neuse USGS HUC 03020201 Coordinates Latitude: 35.811254 Longitude:-78.512389 Location description: The project site is located east of Interstate 540 and north of the terminus of Hinton Oaks Boulevard in Knightdale, in Wake County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material within 0.031 acre of potentially iurisdictional wetlands. the temporary discharge of fill material within 0.007 acre of potentially iurisdictional wetlands, and the temporary discharge of fill material within 139 linear feet of potentially jurisdictional non -wetland waters. Previous Nationwide Permit (NWP) verifications authorized the discharge of fill material resulting in the loss of 0.469 acre of otentially jurisdictional waters. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 39. Commercial and Institutional Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 3/3/2023, and the enclosed plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact George Lyle Phillips III at (919) 588-9200 or George.L.Phillips(&usace.armv.mil. Corps Regulatory Official: �e-arye- LY6&- 7>hd4k /it Expiration Date of Verification: 3/14/2026 Date: 06/O1/2023 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.artny.mil/cm_apex/f?p=13 6:4:0 Copy furnished: Zach Thomas / NCDEQ-DWR / 3800 Barrett Drive, Raleigh, NC 27609 Amy Staley / RES, LLC / 3600 Glenwood Avenue, Suite 100, Raleigh, NC 27612 SAW-2022-01646 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. b. The permittee shall conduct a pre -construction meeting whereby the permanent loss impact limits would be staked by a licensed surveyor and reviewed in the field, including measuring the impact footprint. If the footprint of loss exceeded 0.031 acre, we would then rescind the use of NWP 39, and the applicant would then have the option to either proceed via the Individual Permit process, or resubmit a request to use NWP 39 providing additional avoidance and mitigation of impacts (below the impact limit threshold). c. The permittee shall provide an as -built survey of the fill showing the footprint of permanent loss impacts overlaid on the delineation. If the footprint of wetland loss impacts exceeds 0.031 acre, we would then rescind the use of NWP 39, and the applicant would then have the option to either proceed via the Individual Permit process, or re -construct the crossings such that they fit NWP 39 impact limit thresholds. d. The permittee shall inform the U.S. Army Corps of Engineers Wilmington District Raleigh Field Office Project Manager of the date work within potentially jurisdictional waters commenced. The discharge of dredged or fill material, as proposed for a temporary haul road depicted as Impact Area 2 on the attached exhibits, may not be located within potentially jurisdictional waters of the United States after 03/01/2026 without specific written permission from the Corps. Action ID Number: SAW-2022-01646 County: Wake Permittee: Wake Stone Property Company, Bose Bratton Project Name: Hinton Oaks Industrial Park (North Date Verification Issued: 06/01/2023 Project Manager: George Lyle Phillips III Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: George Lyle Phillips III Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or George.L.Phillips@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Compensatory Mitigation Responsibility Transfer Form Permittee: Wake Stone Property Company, Bose Bratton Action ID: SAW-2022-01646 Project Name: Hinton Oaks Industrial Park (North) County: Wake Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.031 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 0.062 Mitigation Site Debited: Neu -Con Wetland & Stream UMB / Blackbird Site (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor N Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within potentially jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within potentially jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case -by -case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from RES, LLC, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 3/3/2023 was included with the preconstruction notification. This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army. mil). Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: George Lyle Phillips III USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: George.L.Phillips@usace.army.mil pltiw'(� k ((( USACE Project Manager Signature 06/01/2023 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mi1. M N 0 12 a 0 ------------- -`-" � ::� .---::':-.-.'.'.'.-- � �-.'.-.':-:-.'.-:':-: •.'.-:':-:-.'. -.'.♦ p+T)� .tea'.-. `.''1f'.-.--.'.-.':-..W,. . IMPACT AREA 3 0- II�I�I f j SEE SHEET IM 4 \ \ \�\� �'�'Z� :::LL::•I� ` II %LAST SURVEYED POINT OF USACE WETLAND BOUNDARY, ALL POINTS TO THE EAST OF THIS POINT ARE\ APPROXIMATED (SEE NOTE THIS SHEET) L m 1 of o ilo LOT \ DEVELOPMENT) (FUTURE 1 \ �\ LOT 9 o NEW BUILDING 180,000 SF IMPACT AREA 2 SEE SHEET IM 3 IMPACT AREA I SEE SHEET IM 3 DRIVEWAY & RETAINING WALL TEMPORARY II`` 1� HAUL ROAD & STORM PIPE O , = Y Shc r °�/1ll,li�,��/1� CORPORATION D.B. 02943, PG. 00920 J ■ / PIN 1744892208 USE: ROCK QUARRY .DUSTING/ /JD it SITE VICINITY MAP NTS / =Al=AI Al/ =- NOw WETLANDS, STREAM AND BUFFERS IN THE FAR NORTHEAST CORNER OF THE PROJECT AREA HAVE BEEN APPROXIMATED FROM AVAILABLE MAPPING AND MAY NOT ACCURATELY REFLECT THE ACTUAL BOUNDARIES OF THESE WATERS AND BUFFERS, HOWEVER NO IMPACTS ARE PROPOSED IN THIS AREA." SUMMARY OF IMPACTS IMPACT # SHEET NAME PERMANENT BUFFER IMPACTS PERMANENT WETLAND IMPACTS TEPORARY WETLAND IMPACTS TEMPORARY BUFFER IMPACTS TEMPORARY INTERMITTENT STREAM IMPACTS DEEEMED ALLOWABLE BUFFER IMPACTS ZONE1 ZONE2 ZONE1 ZONE2 ZONE1 ZONE2 1 IM.3 997 SF (0.0229 AC) 2,474 SF (0.0568 AC) 1,350 SF (0.0310 AC) 307 SF (0.0070 AC) 2 IM.3 5,470 SF (0.1256 AC) 2,696 SF (0.0619 AC) 139 LF (0.010 AC) 3 IM.4 305 SF (0.0070 AC) 202 SF (0.0046 AC) TOTALS 1 997 SF (0.0229 AC) 2,474 SF (0.0568 AC) 1,350 SF (0.0310 AC)l 307 SF (0.0070 AC) 5,470 SF (0.1256 AC) 2,696 SF (0.0619 AC) 139 LF (0.010 AC) 305 SF (0.0070 AC) 1 202 SF (0.0046 AC) n7l5I . o , Salt''; � c'r;�'.::• �Ml•• O J Y LL cl) Q CL a Q J 2 Q� Z a J jxO U ) >Q D a ZQ JU O oc �Z� �z a w n aw OZ-i oQ Z OOCa 0 J o� H > W Z0 ZZ> =Z =WO oY PROJECT: WSHOIPN DATE: 1 FEB 2023 SCALE: 1 "=200' DWG. # I M 1 LEGEND -IMPACT AREAS IMPACT AREA 1 PERMANENT BUFFER ZONE 1 IMPACT 997 SF (0.0229 AC) IMPACT AREA 2 TEMPORARY BUFFER ZONE 1 IMPACT 5,470 SF (0.1256 AC) BUFFER TEMPORARY BUFFER ®PERMANENT ZONE 2 IMPACT ® ZONE 2 IMPACT 2,474 SF (0.0568 AC) 2,696 SF (0.0619 AC) PERMANENT WETLAND IMPACT— DRIVEWAY, TEMPORARY INTERMITTENT STREAM IMPACT — RIPRAP, WALL 1,350 SF (0.0310 AC) HAUL ROAD, RIPRAP, PIPE 139 LF — 0.010 AC TEMPORARY WETLAND IMPACT— DRIVEWAY, WALL 307 SF (0.0070 AC) R/PgRq/V &u IVER FER i 20' ZONE 2 20' ZONE 2 30, ZONE 1 WAKESTONE 30' ZONE 1 HINTON OAKS INDUSTRIAL w 60, PARK PROPERTY /- LOT 9 e� �, R WAKESTONE SEGMENTAL HINTON OAKS INDUSTRIAL RETAINING i WALL v PARK PROPERTY - LOT 10 WETLANDS i RIP —RAP PAD IMPACTS WILL NOT EXTEND INTO STREAM CHANNEL F ENTRANCE, \\� DIRVEWAY - ` TOP OF INTERMITTENT I/ STREAM BANK DWR STREAM( ORIGIN FLAG LOCATION SEGMENTAL RETAINING 24" RCP WALL /� ��/ WAKESTONE / \\ HINTON OAKS INDUSTRIAL PARK / PROPERTY WAKESTONE HINTON OAKS INDUSTRIAL / PARK PROPERTY - LOT 10 I 20 ZONE 2 / 30' ZONE 1 1 sp. RiAq NFU � � / 20' ZONE 2 FR Rs0, N / 30' ZONE 1 A'�Ri N SF e��FR I. RIP —RAP PAD TEMPORARY � � � / HAUL ROAD 48" CPP I I BLOCK UP STREAM FLOW — PROVIDE PUMP TO PUMP FLOW / DOWNSTREAM OF / CONSTRUCTION AREA I l � TEMPORARY HAUL ROAD I� WAKESTONE J HINTON OAKS INDUSTRIAL PARK PROPERTY e�lJt'' f :• Ml•• �l.c�sZi117lilC 0 J Y � a Q Q Q U r^� Q VJ a J Z Q Y W a O Z 0 0 Q Z z a Fc w G CC PROJECT: WSHOIPN DATE: 1 FEB 2023 SCALE: 1 "=50' Z J Q JU m � cl) Z aw oa 0E- z(D =Z oY IMPACT AREA 1 IMPACT AREA 2 DWG. # I 3 WAKESTONE HINTON OAKS INDUSTRIAL PARK PROPERTY - LOT 9 LEGEND -IMPACT AREAS IMPACT AREA 3 ®BUFFER ZONE 1 IMPACT DEEMED ALLOWABLE RIP -RAP CHANNEL 305 SF (0.0070 AC) BUFFER ZONE 2 IMPACT ®DEEMED ALLOWABLE RIP -RAP CHANNEL 202 SF (0.0046 AC) RIP -RAP CHANNEL STOPS AT STREAM CHANNEL TOB j J 20' ZONE 2 30' ZONE 1 l W WLIf ETLANDS w w w I I 50' NE SE RIVER RIPARIAN BUFFER / io WAKESTONE HINTON OAKS INDUSTRIAL PARK PROPERTY - LOT 10 y i O J 1 Y cl) OC a Q Q C J G Q H � U H Q U) a =) 2 0 J Z Q C_wj � I Y W a O Z O H 0 Z > a I w PROJECT: WSHOIPN DATE: 1 FEB 2023 SCALE: 1 "=50' Q Z_ 0 J wU w J = m� _I z Q - w O O0 Z (7 =Z oY IMPACT AREA 3 DWG. # I M 4