Loading...
HomeMy WebLinkAboutSW5100602_Design Calculations_20100510Site Calculation Manual for ABB Power T & D Company Inc. f/k/a ABB Transmission Holdings, Inc. Project: P090185 3022 NC 43 North, Pinetops, Number 10 Township, Edgecombe County, North Carolina Prepared by: Steven L. Buie, PLS steven@niackgaypa.com Approved by: Mark A. Russell, PE Mack Gay Associates, P.A. 1667 Woodruff Road Rocky Mount, NC 27804 252-446-3017 - 252-446-7715 fax it Narrative Project Description: The purpose of this project is for an expansion of an industrial facility in both the front and rear of the site as shown on the construction plans. A new parking area will also be added on the west side of the site. There is an existing ditch running along the east side of the project that collects storm runoff from the existing facility and will be rrsiouted around the new expansion. A new water quality pond is to be constructed in ;.,Ie rear of the site to remove 90%TSS and control the runoff from the first 1.5-inch of storm water per the Phase-2 regulations. The pond was oversized to use the excavated material as fill for the new expansion in the rear of the site and therefore exceeds the required size called for by the phase-2 regulations. The storm runoff from the rear plant expansion will be conveyed to the bypass swale and the runoff from the 90-day building will be allowed to drain directly to the pond instead of through the pond forebay. The reasoning behind this is the fact that the storm runoff from the existing parking lot and building was originally being conveyed offsite via an existing swale as shown on the existing conditions plan and is now being treated through the water quality pond. Since this impervious area is greater than the new expansion and 90-day building we are actually treating more storm runoff than is actually necessary to comply with the storm -water rules. The owner is ABB Power T & D Company Inc., of Cary, North Carolina. Approximately 9.5 acres will be disturbed during construction. Site Description: This tract of land consists of approximately 26.2 acres and is located northwest of the Town of Pinetops on the north side of NC Highway 43, North Carolina. This property is located in Pinetops ETJ. Please refer to the vicinity map on the plan cover sheet for a more particular description. NC Hwy 43 serves as the southern property line. The property to the west and north of the site is residential. The property to the east is a developed commercial tract. There is an existing industrial plant occupying the site at the current time with planned expansion occurring in the near future. Soils Description: The Edgecombe County Soils manual indicated two types of soils exist at this site: 1. GoA — Goldsboro 2. NoA — Norfolk Sandy Loam Descriptions follow: Goldsboro Fine Sandy Loam (GoA) The Goldsboro Fine Sandy Loam is a moderately well drained soil. Typically, the surface layer is dark grayish brown fine sandy loam 7 inches thick. The subsurface layer is light yellowish brown fine sandy loam, 5 inches thick. The subsoil, to a depth of 82 inches, is brownish yellow fine sandy loam in the upper part, brownish yellow, Jones, Jennifer From: Steven Buie (seven@mackgaypa.com] Sent: Friday, June 25, 2010 8:22 AM To: Jones, Jennifer Subject: P090185 ABB-PINETOPS narrative sedimentation and erosion control Attachments: P090185 ABB-PINETOPS narrative sedimentation and erosion control.docx Jennifer, Per our conversation on Thursday, June 24, 2010 attached is the revised narrative. Best Regards, Steven L. Buie, PLS Mack Gay Associates, P.A. 1667 Woodruff Road Rocky Mount, NC 27804 (252)446-3017 stevenPmackgaypa.com Narrative Project Dessri The purpose of thisp and rear of the site added on the west sic of the project that coil v 0 f is for an expansion of an industrial facility in both the front ,n on the construction plans. A new parking area will also be ie site. There is an existing ditch running along the east side around the new expansiori\A ri the site to remove_K%TTSS and per the Phase-2 regulations. Tt fill for the new expansion in the called for by the phase-2_ regul< runoff from the existing facility and will be rerouted vv water quality pond is to be constructed in the rear of �pntrol the runoff from the first 1-inch_of_storm water dppnd was ov6sized,to use the excavated material as ear\of the site and tKerefore exceeds.the required size ons\The storm runoff from the rear plant expansion will be conveyed to the bypass swale and th to drain directly to the pond instead of t�l this is the fact that the storm runoff from originally being conveyed offsite via an,( conditions plan and is now being treatec impervious area is greater than the new, treating more storm runoff than is actual rules. The owner is ABB Power T & DEC Approximately 9.5 acres will be disturbe Site Description: runoff/from the 90-day building will be allowed )ugh,& pond forebay. The reasoning behind ie existing parking lot and building was isting, swale as shown on the existing I�t0ugh,the water quality pond. Since this z ansion and 90-day building we are actually n essary to comply with the storm water np`";(�y Inc., of Cary, North Carolina. durMo construction. This tract of land consists of approximately 26.2 adrE Town of Pinetops on the north'side of NC Highway,4 located in Pinetops ETJ. Please refer to the vicinity'�s more particular description°NC Hwy 43 serves as till property to the west and north of the site is residentit developed commercial tract! There is an existing ind the current time with planned expansion occurring in Soils Descriptio and is located northwest of the iJprth Carolina. This property is p on the plan cover sheet for a Southern property line. The The property to the east is a trial plant occupying the site at ie near future. The Edgecombe'County Soils manual indicated two types of soils exist at this site: 1. GoA — Goldsboro 2. NoA —//Norfolk Sandy Loam Descriotionfi follow: Goldsboro Fine Sandy Loam (GoA) The Goldsboro Fine Sandy Loam is a moderately well drained soil. Typically, the surface layer is dark grayish brown fine sandy loam 7 inches thick. The subsurface layer is light yellowish brown fine sandy loam, 5 inches thick. The subsoil, to a depth of 82 inches, is brownish yellow fine sandy loam in the upper part, brownish yellow, mottled sandy clay loam and mottled gray, brownish yellow, strong brown, and yellowish red sandy clay loam in the middle part, and gray, mottled sandy clay loam in the lower part. The organic matter content in the surface layer is low, the permeability is moderate, available water capacity is medium, and the shrink -swell potential is low. The seasonal high water table is 2 to 3 feet below the surface. Goldsboro Fine Sandy Loam (GoA) This map unit consists of the nearly level Grantham soils and Urban land in areas too intricately mixed to be mapped separately at the scale used. The complex is about 30 percent Grantham soils and 30 to 35 percent Urban land. The poorly drained Grantham soils are on broad flats and in shallow depressions in uplands. Typically, the surface layer is dark gray very fine sandy loam 6 inches thick. The subsurface layer is light brownish gray very fine sandy loam 5 inches thick. The subsoil is 84 inches thick. It is grey loam in the upper part and gray clay loam in the lower part. The underlying material to a depth of 99 inches is light gray loam. The Urban land part of this unit consists of impervious areas covered by streets, parking lots, buildings, and other manmade structures. Slope is generally modified to fit the needs. The extent of site modification varies greatly; many areas have been disturbed little, while many areas have been cut down or filled over. Norfolk Sandy Loam (NoA) The Norfolk Sandy Loam is a well -drained soil. Typically, the surface layer is brown loamy sand, 7 inches thick. The subsurface layer is light yellowish brown loamy sand, 5 inches thick. The subsoil which is 67 inches thick, is yellowish brown, mottled sandy clay loam in the upper part and brownish yellow mottled sandy clay loam in the lower part. The underlying material, to a depth of 90 inches, is yellow, mottled sandy cay loam and coarse sandy loam. The organic matter content is low. The permeability is moderate, available water capacity is medium and the shrink -swell potential is low. The soil is strongly to very stronger acid and the depth of bedrock is more than 60 inches. The seasonal high water table is 3.5 to 6 feet below the surface. Planned Sedimentation & Erosion Control Practices 1. Temporary Gravel Construction Entrance: (Three) Temporary gravel construction entrances are to be constructed at the proposed locations shown on the plan. 2. Water Quality Pond with a Temporary Skimmer: (One) Two temporary sediment traps previously constructed in the clear and grub stage will be replaced by the water quality pond at the location and size shown on the plan. 3. Sediment Fence (Silt Fence): Sediment fence will be utilized behind the temporary diversions as shown on the plan. 4. Temporary Diversion Ditches: Construct temporary diversion swales at the locations specified on the plan to divert sediment laden water to the temporary skimmer sediment traps. The diversion on the west side of project will be converted to a permanent swale. The diversion on the east side of the project will be converted to a permanent swale. 5. Construction Sequence: See detail sheet for construction sequence, seeding, and maintenance details. Page 1 of 1 f l Tc Greet, S � a � c " C 1 J 6tt, 11,.,..,wl ,mriarcvc rnm/crrinte/t(,,stndv/Iisiwel)i-nt2.dll/Usi?foilills=❑eIvzooI) &MotiseX=... 4/28/20i0 s -11 �= 9000 / \1 2500 120 9000 CO;MT... Town Creck Ch IDDD—' 0,1 ,jf. o 1 12694000 195 -- l�\ _ AOD IUD .`� -.. nklm 500 00 Sewage DispoSayl�• 1000 - _ 3U0 200 i \1 Fact Males j, �1 2 .6096 V 47'30" d 12192 6 1.62A0 J, •i / , / // /I // ,. 6 18288 2.1336 / 0 2.9301 9 2lE3P A• ID 3.OAB0 57 •�/ / �• �/ ( /- Gem /\�•I I it //' u to co en I1ie1c�s / l ilply 6r .M30/6 IPme4opS, la mnvetl eeleu to letl ( / nmllNly M 3.2A00 J CoA Noe 43 J Lu ' OP G LY / Noe ll\ Lu ry Pa Kea - KeB `NaD WaB NOB (Joins sheei 22) �d6"� Jo � Gy --Ra Fya GOP ..pY6 "U3 r �o Jo ti \ BB �O Pa Nob '..Wiggins 9 Kee \I J C'YD-Cross o ds ee L' F Tab z / 1 A y � Lu . de DPB Kee `TaH Ra Pam sAP r s y yC o`e 2'ON COO -C:T Lu PROJECT PHASE= Drainage Basin Name= Soil Type= Basin Area: Impervious= Grass= Woods= Total= C Factors: Impervious= Grass= Woods= Composite C= Hydrolic Length= Grade Difference= Tc= POST -DEVELOPMENT Da-1 GoA, NoA 3.61 Acres 3.35 Acres 1.31 Acres 8.27 Acres 0.95 TR-55 0.15 TR-55 0.1 TR-55 0.49 1240 feet 18 feet 11 min. PROJECT PHASE= Drainage Basin Name= Soil Type= Basin Area: Impervious= Grass= Woods= Total= C Factors: Impervious= Grass= Woods= Composite C= Hydrolic Length= Grade Difference= Tc= POST -DEVELOPMENT Da-2 GoA, N oA 1.59 Acres 0.69 Acres 0 Acres 2.28 Acres 0.95 Table 8.03a 0.15 Table 8.03a 0.1 Table 8.03a 0.71 880 feet 10 feet 8 min. PROJECT PHASE= POST -DEVELOPMENT Drainage Basin Name= Da-4 Roof Drainage Soil Type= GoA,NoA Basin Area Impervious= 0.09 Acres Grass= 0 Acres Woods= 0 Acres Total= 0.09 Acres C Factors: Impervious= 0.95 Table 8.03a Grass= 0.15 Table 8.03a Woods= 0.1 Table 8.03a Composite C= 0.95 Hydrolic Length= n/a feet Grade Difference= n/a feet Tc= 5 min. (Chart SD-2) PROJECT PHASE= POST -DEVELOPMENT Drainage Basin Name= Da-5 Soil Type= GoA,NoA Basin Area Impervious= 0.84 Acres Grass= 0.12 Acres Woods= 0 Acres Total= 0.96 Acres C Factors: Impervious= 0.95 Table 8.03a Grass= 0.15 Table 8.03a Woods= 0.1 Table 8.03a Composite C= 0.85 Hydrolic Length= 204 feet Grade Difference= 2 feet Tc= 5 min. (Chart SD-2) PROJECT PHASE= POST -DEVELOPMENT Drainage Basin Name= Da-6 Soil Type= GoA,NoA Basin Area Impervious= 2.96 Acres Grass= 3.87 Acres Woods= 0 Acres Total= 6.83 Acres C Factors: Impervious= 0.95 Table 8.03a Grass= 0.15 Table 8.03a Woods= 0.1 Table 8.03a Composite C= 0.50 Hydrolic Length= 720 feet Grade Difference= 8 feet Tc= 5 min. (Chart SD-2) PROJECT PHASE= POST -DEVELOPMENT Drainage Basin Name= Da-7 Soil Type= GoA,NoA Basin Area Impervious= 0 Acres Grass= 0.51 Acres Woods= 0 Acres Total= 0.51 Acres C Factors: Impervious= 0.95 Table 8.03a Grass= 0.15 Table 8.03a Woods= 0,1 Table 8.03a Composite C= 0.15 Hydrolic Length= 200 feet Grade Difference= 15 feet Tc= 5 min. (Chart SD-2) IMPERVIOUS AREA for TOTAL SITE Existing Plant= 97846 sf Front Ex ansion= 6738 sf 90-Day Buildin = 4000 sf Rear Ex ansion= 43200 sf On -Site Sidewalks= 3920 sf Existing Parking= 119909 sf New West Parkin = 33827 sf Rear Parking Area= 32977 sf Ex. Gravel Drive= 6635 sf New Gravel Drive= 3736 sf Concrete Pads= 3584 sf Total Im ervious= 356372 sf Project Area= 1078546 sf Percent Im ervious= 33.04% DRAINAGE AREA 1 Total Drainage Area= 442572 sf On Site Drainage Area= 442572 sf Off Site Drainage Area= 0 sf Proposed Impervious Area= 250795 sf % Impervious Area= 56.7% On -Site Buildin s= 25600 sf On -Site Parkin = 32981 sf On -Site Sidewalks= 0 sf Other on -site= 900 sf Future= 0 sf Off -Site= 0 sf Existing BUA 191314 sf Total= 250795 sf WATER QUALITY POND SUMMARY SPREADSHEET Known Quantities: Areas (Pre-Dev): Grass= 6.21 Acres Woods= 0.00 Acres Impervious 3.95 Acres Total= 10.16 Acres Areas (Post-Dev): Grass= 4.40 Acres Woods= 0.00 Acres Impervious 5.76 Acres Total= 10.16 Acres Soil Types: GOA, NoA Hydraulic Length = 1621.00 feet Watershed Slope = 1.30 % Curve Numbers: Impervious= 0.95 Grass= 0.15 Woods= 0.1 PREDEVELOPMENT C= 0.46 POSTDEVELOPMENT C= 0.60 Stormwater Runoff Summary (from Hydrflow) - 24-Hour Return Period Stage 1-Year 2-Year 10-Year 25-Year 100-Year; (cfs) (cfs) (cfs) (cfs) (cfs) Pre 0.47 0.56 0.99 1.34 2.18 Post 0.61 0.74 1.30 1.75 2.84 Routed 0.18 0.20 0.27 1.08 2.65 post Development Runoff is Less Than Pre -Development Hydraflow Table of Contents P090185-ABB-WQ POND DESIGN.gpw Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 1 -Year SummaryReport .................................................................................................................. 1 HydrographReports............................................................................................................ 2 Hydrograph No. 1, Rational, PRE-DEVELOPMENT.......................................................... 2 Hydrograph No. 2, Rational, POST-DEV........................................................................... 3 Hydrograph No. 3, Reservoir, <no description>................................................................. 4 PondReport - <New Pond>.......................................................................................... 5 2 - Year SummaryReport .................................................................................................................. 6 HydrographReports............................................................................................................ 7 Hydrograph No. 1, Rational, PRE-DEVELOPMENT.......................................................... 7 Hydrograph No. 2, Rational, POST-DEV........................................................................... 8 Hydrograph No. 3, Reservoir, <no description>................................................................. 9 10 -Year SummaryReport ................................................................................................................ 10 HydrographReports.......................................................................................................... 11 Hydrograph No. 1, Rational, PRE-DEVELOPMENT........................................................ 11 Hydrograph No. 2, Rational, POST-DEV......................................................................... 12 Hydrograph No. 3, Reservoir, <no description>............................................................... 13 25 - Year SummaryReport ................................................................................................................ 14 HydrographReports.......................................................................................................... 15 Hydrograph No. 1, Rational, PRE-DEVELOPMENT........................................................ 15 Hydrograph No. 2, Rational, POST-DEV......................................................................... 16 Hydrograph No. 3, Reservoir, <no description>............................................................... 17 100 - Year SummaryReport ................................................................................................................ 18 HydrographReports.......................................................................................................... 19 Hydrograph No. 1, Rational, PRE-DEVELOPMENT........................................................ 19 Hydrograph No. 2, Rational, POST-DEV......................................................................... 20 Hydrograph No. 3, Reservoir, <no description>............................................................... 21 Hydrograph Summary Report HydraFlow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 0.471 1 1440 40,727 — PRE -DEVELOPMENT 2 Rational 0.615 1 1440 53,122 — — POST-DEV 3 Reservoir 0.177 1 2465 16,635 2 91.69 38,650 <no description> P090185-ABB-WQ POND DESIGN.gpw Return Period: 1 Year Friday, May 21, 2010 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = Rational Peak discharge = 0.471 cfs Storm frequency = 1 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 40,727 cuft Drainage area = 10.160 ac Runoff coeff. = 0.46" Intensity = 0.101 in/hr. Tc by User = 1440.00 min IDF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 Composite (ArealC) = [(7.150 x 0.15) + (3.510 x 0.95)] / 10.160 PRE -DEVELOPMENT Q (Cfs) Hyd. No. 1 -- 1 Year Q (Cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0,10 0.05 0.05 0.00 000 0 300 Hyd No. 1 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) I Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 Hyd. No. 2 POST-DEV Hydrograph type = Rational Peak discharge = 0.615 cfs Storm frequency = 1 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 53,122 cuft Drainage area = 10.160 ac Runoff coeff. = 0.6 Intensity = 0.101 in/hr Tc by User = 1440.00 min OF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 Q (cfs) POST-DEV Hyd. No. 2 -- 1 Year Q (cfs) v vV 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 V V V Hyd No. 2 Time (min) Cl Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 Hyd. No. 3 <no description> Hydrograph type = Reservoir Peak discharge = 0.177 cfs Storm frequency = 1 yrs Time to peak = 2465 min Time interval = 1 min Hyd. volume = 16,635 cuft Inflow hyd. No. = 2 - POST-DEV Max. Elevation = 91.69 ft Reservoir name = <New Pond> Max. Storage = 38,650 cuft Storage Indication method used. Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 <no description> Hyd. No. 3 -- 1 Year 0 300 600 900 1200 1500 1800 2100 2400 2700 Hyd No. 3 — Hyd No. 2 ® Total storage used = 38,650 cult Q (cfs) 1.00 0.90 0.80 0.70 0,60 0.50 0.40 0.30 0.20 0.10 0.00 3000 Time (min) Pond Report s Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 Pond No. 1 - <New Pond> Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 91.00 ft Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 91.00 52,732 0 0 0.50 91.50 57,894 27,644 27,644 1.00 92.00 59,473 29,338 56,982 2.00 93.00 78,244 68,637 125,619 3.00 94.00 82,158 80,185 205,804 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrtRsr] [A] [B] [C] [D] Rise (in) = 15.00 3.00 0.00 0.00 Crest Len (ft) = 10.00 10.00 0.00 0.00 Span (in) = 15.00 3.00 0.00 0.00 Crest El. (ft) = 92.50 93.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 89.00 91.00 0.00 0.00 Weir Type = Riser Broad - - Length (ft) = 50.00 1.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 0.10 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Mufti -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 3.00 2.00 1.00 000 Note: CulvertlOnfice outfiova are analyzed under Inlet fa) and outlet (w) control. Weir risen checked for orifice wnditions (ic) and submergence (a). Stage I Discharge Elev (ft) 94.00 93.00 92.00 91 00 0.00 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 40.00 Total 0 Discharge (cfs) 0 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 0.565 1 1440 48,804 — PRE -DEVELOPMENT 2 Rational 0.737 1 1440 63,657 — POST-DEV 3 Reservoir 0.198 1 2493 19,164 2 91.83 46,751 <no description> P090185-ABB-WQ POND DESIGN.gpw Return Period: 2 Year Friday, May 21, 2010 VA Hydrograph Report Hydraflow Hydrographs by Intelisolve Al Friday, May 21, 2010 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = Rational Peak discharge = 0.565 cfs Storm frequency = 2 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 48,804 cuft Drainage area = 10.160 ac Runoff coeff. = 0.46* Intensity = 0.121 in/hr Tc by User = 1440.00 min IDF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) _ [(7.150 z 0.15) + (3.510 z 0.95)] / 10.160 PRE -DEVELOPMENT Q (Cfs) Hyd. No. 1 -- 2 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 Z� 0.00 000 0 300 Hyd No. 1 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hydrograph Report E3 Hydraflow Hydrographs by Intelisolve AI Friday, May 21, 2010 Hyd. No. 2 POST-DEV Hydrograph type = Rational Peak discharge = 0.737 cfs Storm frequency = 2 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 63,657 cuft Drainage area = 10.160 ac Runoff coeff. = 0.6 Intensity = 0.121 in/hr Tc by User = 1440.00 min OF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 POST-DEV Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 000 0 300 Hyd No. 2 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) 9 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 Hyd. No. 3 <no description> Hydrograph type = Reservoir Peak discharge = 0.198 cfs Storm frequency = 2 yrs Time to peak = 2493 min Time interval = 1 min Hyd. volume = 19,164 cult Inflow hyd. No. = 2 - POST-DEV Max. Elevation = 91.83 ft Reservoir name = <New Pond> Max. Storage = 46,751 cuft Storage Indication method used <no description> Q (cfs) Q (cfs) Hyd. No. 3 -- 2 Year 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 000 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 3 —Hyd No. 2 ®Total storage used = 46,751 cult IF Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 0.994 1 1440 85,855 — PRE -DEVELOPMENT 2 Rational 1.296 1 1440 111,985 — — POST-DEV 3 Reservoir 0.270 1 2580 28,091 2 92.43 86,304 <no description> P090185-ABB-WQ POND DESIGN.gpw Return Period: 10 Year Friday, May 21, 2010 11 Hydrograph Report Hydraflow Hydrographs by Intelisolve Al Friday, May 21, 2010 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = Rational Peak discharge = 0.994 cfs Storm frequency = 10 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 85,855 cuft Drainage area = 10.160 ac Runoff coeff. = 0.46' Intensity = 0.213 in/hr Tc by User = 1440.00 min IDF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(7.150 x 0.15) + (3.510 x 0.95)] / 10.160 PRE -DEVELOPMENT Q (Cfs) Hyd. No. 1 -- 10 Year Q (Gfs) 1.00 1.00 A." 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0,10 0.00 000 0 300 Hyd No. 1 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) 12 Hydrograph Report Hydraflow Hydrographs by Intelisolve Al Friday, May 21, 2010 Hyd. No. 2 POST-DEV Hydrograph type = Rational Peak discharge = 1.296 cfs Storm frequency = 10 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 111,985 cuft Drainage area = 10.160 ac Runoff coeff. = 0.6 Intensity = 0.213 in/hr Tc by User = 1440.00 min OF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 POST-DEV Q (Cfs) Hyd. No. 2 -- 10 Year 2.00 1.00 F 1� Q (cfs) 2.00 1.00 EwFi 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 ® Hyd No. 2 Time (min) 13 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 Hyd. No. 3 <no description> Hydrograph type = Reservoir Peak discharge = 0.270 cfs Storm frequency = 10 yrs Time to peak = 2580 min Time interval = 1 min Hyd. volume = 28,091 cuft Inflow hyd. No. = 2 - POST-DEV Max. Elevation = 92.43 ft Reservoir name = <New Pond> Max. Storage = 86,304 cuft Storage Indication method used. <no description> Q (cfs) Hyd. No. 3 -- 10 Year 2.00 1.00 A Q (cfs) 2.00 1.00 fflvp� 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) ® Hyd No. 3 — Hyd No. 2 d® Total storage used = 86,304 cuff 14 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 1.338 1 1440 115,637 — -- PRE -DEVELOPMENT 2 Rational 1.746 1 1440 150,831 — — POST-DEV 3 Reservoir 1.082 1 1987 61,010 2 92.58 96,498 <no description> P090185-ABB-WQ POND DESIGN.gpw Return Period: 25 Year Friday, May 21, 2010 15 Hydrograph Report HydraFlow Hydrographs by Intelisolve Al Friday, May 21, 2010 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = Rational Peak discharge = 1.338 cfs Storm frequency = 25 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 115,637 cuft Drainage area = 10.160 ac Runoff coeff. = 0.46" Intensity = 0.286 in/hr Tc by User = 1440.00 min IDF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 Composite (Area/C) = [(7.150 x 0.15) + (3.510 x 0.95)] / 10.160 Q (cfs) 2,00 1.00 wi PRE -DEVELOPMENT Hyd. No. 1 -- 25 Year Q (Cfs) 2.00 1.00 W II 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 ® Hyd No. 1 Time (min) 16 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 Hyd. No. 2 POST-DEV Hydrograph type = Rational Peak discharge = 1.746 cfs Storm frequency = 25 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 150,831 cuft Drainage area = 10.160 ac Runoff coeff. = 0.6 Intensity = 0.286 in/hr Tc by User = 1440.00 min OF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 Q (cfs) 2.00 1.00 POST-DEV Hyd. No. 2 -- 25 Year Q (cfs) 2.00 1.00 0.00 ke I I I I I I I I I N 1 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 — Hyd No. 2 Time (min) Hydrograph Report 17 Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 3 <no description> Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 2 - POST-DEV Reservoir name = <New Pond> Storage Indication method used. Q (cfs) 2.00 1.00 0.00 0 300 Hyd No. 3 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage <no description> Hyd. No. 3 -- 25 Year Friday, May 21, 2010 = 1.082 cfs = 1987 min = 61,010 cult = 92.58 ft = 96,498 cuft Jf i �'f yKif }ReFEp' i �yy`� ;;yyf .A �ry� e F� 5.. 600 900 1200 — Hyd No. 2 1500 1800 2100 2400 2700 ® Total storage used = 96,498 tuft Q (cfs) 2.00 1.00 0.00 3000 Time (min) 18 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 Rational 2.179 1 1440 188,269 — — PRE -DEVELOPMENT 2 Rational 2.842 1 1440 245,555 — POST-DEV 3 Reservoir 2,653 1 1536 154,747 2 92.67 102,823 <no description 2 P090185-ABB-WQ POND DESIGN.gpw Return Period: 100 Year Friday, May 21, 2010 19 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Fdday, May 21, 2010 Hyd. No. 1 PRE -DEVELOPMENT Hydrograph type = Rational Peak discharge = 2.179 cfs Storm frequency = 100 yrs Time to peak = 1440 min Time interval = 1 min Hyd. volume = 188,259 cuft Drainage area = 10.160 ac Runoff coeff. = 0.46' Intensity = 0.466 in/hr Tc by User = 1440.00 min IDF Curve = CRM - Updated 12-10-08.IDF Asc/Rec limb fact = 1/1 ' ComposRe (Area/C) = ((7.150 x 0.15) + (3.510 x 0.95)) / 10.160 Q (Cfs) 3.00 2.00 1.00 r1iffil PRE -DEVELOPMENT Hyd. No. 1 -- 100 Year Q (Cfs) 3.00 RT 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. No. 2 POST-DEV Hydrograph type = Rational Storm frequency = 100 yrs Time interval = 1 min Drainage area = 10.160 ac Intensity = 0.466 in/hr OF Curve = CRM - Updated 12-10-08.IDF POST-DEV Q (Gfs) Hyd. No. 2 — 100 Year 3.00 2.00 1.00 Q 20 Friday, May 21, 2010 Peak discharge = 2.842 cfs Time to peak = 1440 min Hyd. volume = 245,555 cult Runoff coeff. = 0.6 Tc by User = 1440.00 min Asc/Rec limb fact = 1/1 Q (cfs) 3.00 2.00 1.00 EWPb 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Hyd No. 2 Time (min) 21 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.1 Friday, May 21, 2010 Hyd. No. 3 <no description> Hydrograph type = Reservoir Peak discharge = 2.653 cfs Storm frequency = 100 yrs Time to peak = 1536 min Time interval = 1 min Hyd. volume = 154,747 cuft Inflow hyd. No. = 2 - POST-DEV Max. Elevation = 92.67 ft Reservoir name = <New Pond> Max. Storage = 102,823 cuft Storage Indication method used. Q (cfs) 3.00 2.00 1.00 CTd�b� <no description> Hyd. No. 3 -- 100 Year t { `r Q (cfs) 3.00 2.00 1.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) Hyd No. 3 —Hyd No. 2 ®Total storage used = 102,823 tuft Permit rfo be Wv dby DING) ®gin HCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name ABB Power T 8 D Company Inc Contact person Mark Russell Phone number (252) 446-3017 Date 21-May-10 Drainage area number 1 I1 DESIGN INFORMATION e Site Characteristics Drainage area 442,572 IF Impervious arse, post -development 250,795 ff' %impervious 56.67 % Design rainfall depth Storage Volume: Non-SAWaters Minimum volume required Volumeprovided Storage Volume: SAWaters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the tyr 24hr storm peek flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, postdevelopment Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow PrelPost 1-yr. 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the pen. pool elevation) Top of 1 Oft vegetated sheff elevation Bottom of 10111 vegetated shell elevation Sediment deanout, top elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume b�OV� W ATF'q 1.5 in \./ 30,982. it' OK 33,462 fl' OK, volume provided is equal to or in excess of volume required. to fe #' 0 ft' ft' y (Y or N) 2.8 in 0.46 junitless) 0.60 (unidess) 0.12 inthr OK 0.57- ff'/sec 0.73 ft'/sac 0.16 he/sec 91.60.fmsl 91.00 fmsl 91.00 fmsl 91.50 fmsl 90.50 finsil Data not needed for calculation option #1, but OK ff provided. 83.00`fmsl / 82.00 fmsl Date not needed for calculation option #1, but OK if provided. 1.00 ft Y ' (YorN)1. 91.6 tmsl OK Form SW401-Wet Detention BaslnRwA-2/20/09 Parts I. a u. DWgn Summary, Page 1 of 2 Permit (to be provided by DWO) IL DESIGN INFORMATION' -+ Surface Areas Arm, temporary pool Area REQUIRED, permanent pool SAIDA redo Area PROVIDED, permanent pool, A�en,,_pw Area, bottom of 10ft vegetated shah, Abs_� Area, sediment deanout, top elevation (bottom of pond), A p,,,, Volumes Volume, temporary pool Volume, permanent pool, V,„„y,d Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? MountaindPiedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-21g) Volume, permanent pool, V,,,,r,-,,,i Area provided, permanent pod, Ape,n_,, Average depth calculated Average depth used in SAIDA, d.., (Round to nearest 0.5fl) Calculation option 2 used? (Sea Figure 10-2b) Area provided, permanent pool, Ae,, w Area, bottom of 10fl vegetated shelf, AboL,,,,,, Area, sediment deanout, top elevation (bottom of pond), AbM., "Depth' (distance b/w bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d„, (Round to nearest 0.5fl) Drawdown Calculations Drewdown through orfce? Diameter of orifice (if circular) Arm of orifice (H-non- arcular) Coefficient of discharge (CD) Driving head (H,) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pretdevelopment 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown lime Additional Information Vegetated side slopes Vegetated shell slope Vegetated shelf width Length of flowpath to width redo Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies 58,209f1' i 6,107 fe ' 1.38 (unitless) 64,367.fl OK 47,727 fl 27,147 fl' 33,462113 OK 413,49540 80,855'fe 19.6% % OK 90 % n (Y or N) y (Y or N) 1.38 limitless) y _ (Y or N) 413,495rf' OK 64,367, fl' OK 6.42,It OK 6.5fl OK n (Y or N) fl' ft' fl1 y (Y or N) 3.00'in • in' 0.60,(unitless) 0.41'fl N (Y or N) (unitless) (unitless) It It 0.57 ft3lsec OK 0.73 elsec OK 0.18-fl /sec 3.00 days OK, draws down in 25 days. Drawdown time varying from expected value by more than a half day. 3:1 OK 10 :1• OK 10.0 fl OK 7:1 OK 5.0 :1 OK y (Y or N) OK 2.6 It OK N (Y or N) OK y . (Y a N) OK y (Y or N) OK Portable Pump Form SW401-Wet Detention Basin-Rev.62=109 Parts I. a II. Design Summary, Page 2 of 2 Precipitation frequency Data Server Page l of 3 POINT PRECIPITATION FREQUENCY ESTIMATES FROM NOAA ATLAS 14 ROCK\' MOUNT ENP FARM, NORTH CAROLLNA (31-7400) 35.8936 N 77.6806 R' 49 feet from "Precipimien-Frtqueney Aaas oftbe [iNmd Stav�s' D`OA.4 Allae 1J, Volume 1, l'ersion 3 CNOAAr n r, onal Wenbu Sen cc Sislo<br S ni T Man,land, 2 W r ` Confidence Limits Other Info. GIS data Maps I Docs ` Re ARI" 0 Precipitation 61 Intensity ❑6hr 1_ hr Estimates J hr (in/hr) 48 0 la 4n O iEtImn (peen) a.91 mn 3.92 m 3.27 min 2.24 =❑�d 1.40 m0v 0.81 0.57 0.34 0.04 d�ar 0.03 der 0.02 0.01 0.01 0.01 0.01 020 O.12 0.07 5.65 6.36 4.52 5.09 3.78 4.30 4.92 5.52 2.61 3.05 3_i6 4.09 1.64 1.96 2.32 2.72 3.08 3.43 0.96 1.16 1.40 Ib8 1.94 2.20 0.68 0.82 1.00 1.2] 1.41 LGl 0.41 OA9 0.60 0.72 0.85 0. 88 0.24 0.29 0.35 0.43 0.51 0.59 0.14 0.19 0.22 028 0.33 0.38 0.08 0.11 0.13 0.16 0.18 0.21 0.05 0.06 0.07 0.09 0.10 0.11 0.03 0.04 0.05 O.U6 0.06 0.07 0.02 0.03 0.04 0.04 0.05 OF167 0.02 0.02 0.02 0.03 0.03 0.03 0.01 0.02 0.02 0.02 0.02 0.03 0.01 0.01 0-02 0.02 0.02 002 0.01 0.01 0.01 0.02 002 Q(12 111 7.30 5.83 6.53 25 8.20 50 11111 9.00 9.71 7.16 7.72 6.05 650 4S5 4.98 21111 10.40 8.24 6.93 5.40 5.91 3.78 4.2q 2A7 2.84 1,84 2.14 1.12 1.31 0.67 0.80 0.45 OSS 0.25 030 0.13 O.15 008 0.10 0.06 0.07 0.04 094 0.03 0.03 OA2 0.03 0.02 0.02 SOU I1.18 8.84 7.42 1110U 11.98 9.43 7H9 699 4.66 3.20 2.44 1.50 0.92 063 0.34 O.I8 0.11 0.08 005 0.04 0.03 0.02 •These precipitation frequency estimates are based no aw oNM1�nmm�.=�=a-••------"-- Please bete to IJOAA Alfas Id Oocunen:Iw mwe inlamafiw. NOTE: Fontana, laws estimates near zero toappcer as zao. turn to State Map • Upper bound of the 90% confidence interval 10 Precipitation Intensity Estimates 1 (in/hr) 4Z da 'd48 d y 31 d" 45 day 61 dayARI" (perm) n 5.42 minmnm 4.34 3 61 2.48 1.54 0.90 0.64 0.38 022 0.13 0.07 0.04 0.03 0.02 0.01 0.01 0.01 0.01 �� •' 17.00 6 22 4.97 5.60 4.16 4.72 2.88 3.36 1.80 2.15 2.55 2.99 1.06 12R 1.54 1.84 0.75 091 1.11 1.34 0.45 054 0.66 D.80 0.26 0.32 0.31 0.47 0.16 0.20 0.24 0.30 0.09 0.12 0.14 0.17 0.05 0.06 0.08 0.09 0.03 a-o4 0.05 0.06 0.03 0.03 (1.04 QOS 0.02 0.02 0.02 0.03 0.01 0.02 0.02 0.02 0.01 0.01 (102 0.02 0.01 0.01 0.(71 0.02 10 26 8.03 9A0 6.41 7.17 5.41 606 3 22 499 SII 9.88 7.87 6.64 5.00 3.39 3.76 2.13 2.41 L56 1.78 0.94 1.07 0.56 0.64 0.36 0.42 0.20 0.23 0.11 0.12 0.07 0.08 0.05 0.06 0.03 0.01 0.03 0.03 0.02 0.02 OA2 0.02 too 2110 10.66 l L42 8.4G 9 OS 7.13 7.61 A46 5.93 4.16 2.71 2.03 1.22 0.74 049 0.27 0.14 0.09 0.07 0.04 0.03 0.02 0.02 5110 12.31 9.73 8.17 8.70 6.50 7.05 4.66 5.14 3.12 3.52 2.36 2.70 lA4 1.65 0.87 101 0.60 0]O 093 -0381 0.17 Prflge�]FOO 0.11 0.08 ear005tre 0.05 0.04 0.04 0.03 0.03 0.02 0.02 IU/I0 13.21 10.40 ' The a,w obund ol the wNmenwimaaw ai wn u.w.a =.a �..-.�__ ...__. _. ' These pababoauon lrequemates rcy estimates-0 are based on a pamal duauw dales. ARI is the Maeda Raunenw laterval. Please rely to NOAR AOzs 1d Oewnnenl Ia mad inlamalim. NOTE: Fwmalling patients estimates near xaoto appear as zero. w Lower bound of the 90% confidence interval ARP" 10 ]5 30 Precipitation fill 120 �� Intensity 12 Estimates 24 48 hr dap �� dap 10 Aap 211 dny 30 dap 48 day 60 dn)' (pears) �4.45 mm mm 35S mm 2.96 min 2.03 "in 1.27 min 0.73 hr 0.52 hr 0.31 hr 0.18 Iv OJ 0.06 0.04 0.02 0.02 0.01 0.01 0.01 0.0] 0.02 0.03 0.02 0.02 0.01 0.02 [0 0 11 0.01 0.01 0.01 r�27S li 5.78 412 4.63 3.45 3.90 2.38 2.77 L49 1.78 0.87 1.05 0.61 0.74 0.37 0.4a 0.21 026 0.13 0.17 0.08 0.10 0.04 0.05 0.03 0.01 u tll 6.61 S 29 5.89 q.46 4.98 3.23 3.69 q.10 4.45 2.10 2.46 2.77 3.06 I:?6 L50 1.73 ].9S 0.90 1.08 1.26 IA3 OS4 0.65 0.76 0.86 0.32 0.39 0.45 0.52 0.20 0.25 030 03q 0.12 0.14 0.17 0.19 0.06 0.08 0.09 0.10 0.04 O.Oi 0.06 0.07 0.03 0.04 0.04 0.05 0.02 0.03 0.03 0.03 0.02 0.02 0.02 0.02 0.01 0.02 0.02 0.02 0.01 0.01 0.02 0.02 26 7.39 5(1 1011 8.09 8.68 6.44 6.89 5.94 S.SI 2U0 5(111 9.24 9,85 7.32 7.79 6.16 6.54 479 5.20 3.36 3.73 2.18 2 88 1.61 1.85 0.98 1.13 O.S9 0.69 0.39 0.47 0.22 0.26 0.12 113 0.07 008 0.06 0.06 0.(17 0.04 0.04 0.04 0.03 10.03 0.03 0.02 0.02 0.03 0.02 0.02 0.02 IIUII 1(1.45 8.23 6.88 557 4.07 _.76 _.09 ].�8 ... 0.78 ..,_._..._.___ 0.53 O^9 O.1S rr"^,,n^'�1Pnev 0,09 are less man. 'The lowerwuntldthe confidmceinterval at sou wnnwnw love >u e.mv=rv�.��� Aid the Aver _-...._.__. These preoptation VequerrY estimates are based one rM f I alw mtnmo series . Aid is the Averaage Recurrence nlerval. l Precipitation Frequency Data Server Page 1 of 3 ' POINT PRECIPITATION FREQUENCY ESTIMATES FROM NOAA ATLAS 14 ROCKY MOUNT EXP FARNL NORTH CAROLINA (31-7400) 358936 N 77.6806 R' 49 feet from "Precipitation -Frequency Atlas of the Unnod Slaes" NO.A.n .Atlas 14, Volume 2, Version 3 G \i. Domde, D. \lartin, B. Un, T. P repbok, \l.Yeku, and D. Riley NOAA, National Wulhcr Si Silver Spring, Maryland, 31H14 Confidence Limits IFSeasonality 11 Location Maps Other Info. JI GIS data II Maps I Docs II Return to State Map ARP f 1 Ia 3n rn Io 11 NO 11 30 11 a= II cu II - These pietie ation Iretnenry eshmeles are based on a 001e1 duration series. ARI Is the Average Reane be Inteval. Please rely to Nosh Atlas 14 Dsumenl for Mae information NOTE: Famalting laces estimates near zero toappear aszao. * Upper bound of the 90% confidence interval ARI �5 ]O IS 30 Precipitation 60 120 hr �[6 Frequency hr 32 hr Estimates 24 hr 48 hr (inches) Jay 7� Juy 10 d:q' 211 dap 311 Jay 45 dap 6U Juy curs = mat 0 45 min 0.72 min 0.90 min 1.24 min 1.54 min L81 1.93 2.30 2.67 3 07 356 4.02 4.69 5.33 7.17 8.R6 11.07 13.27 0.52 0.83 1.04 1.44 1.80 2.12 2.26 2.69 3.13 3.73 4.31 4.ffi 5.65 6.39 7.92 R.5 10.42 110.52 12.61 13.08 15.51 15.64 18.30 �0.58 0.93 1.18 1.68 2.15 2.56 2.75 316 3.82 4.82 553 6.14 7.09 70 0.67 1.07 1.35 1.96 2.55 3.09 3.33 3.96 4.66 5.73 6.53 8.18 724 8.87 8.29 10.05 9.17 11.02 1194 14.13 14.31 16.67 17.45 20.1G 2Q40 23.23 25 0.75 1.20 1.51 2.24 2.99 3.69 4.01 4.79 5.68 7.25 50 0.82 1.31 1.66 2.50 3.39 4.26 4.68 5.61 6.69 8.56 9.60 10.29 11.55 12.57 Fl T9-6]F18-581 22.35 25.47 7110 0.89 1.41 1.78 2.73 3.76 4.83 5.36 643 7.73 10.05 11.22 11.87 13.19 14.27 1Z92 20.58 24.61 27.74 2110 0.9$ L51 1.90 2.96 4.16 5.43 6.08 7.33 8.88 1 L75 13.06 13.66 15.00 16. 13 20.00 22.69 26.95 30.05 5110 1.03 1.62 2.04 3.25 4.66 6.25 Z09 8.59 iQ50 14.46 15 970 16.16 17.70 18.87 23.OS 25.62 30.22 33.15 10110 1.10 1.73 2.18 3.52 5.14 7.05 8.11 9.87 12.14 16.85 t8.43 18.81 19.99 21.i9 25.55 2Z97 32.81 35.55 The upperhoma Or the ormcenceinterval at 90%mnlidenw laud is Nevaluevnidl 5%ol Inaji atedquanwsvelues nor a given haquaney are greaternun. "These preoplation trequevey eadbutes are based on a Partial duration sales. ARI is the Average Rareurennt Interval. Please rate to NOAA Alias 14 Docnmenn In more information . NOTE: Fo'malling prevoi estimates nea, zen to appear as zero. * Lower bound of the 90% confidence interval Precipitation Frequency Estimates (inches) ARI•" 5 10 15 30 611 720 3 6 12 24 48 4 7 10 0 30 45 60 (years) min min min min min min hr hr hr hr hr Jay Jay rhry dap dap drp' day 1�0.37 0.59 0.74 LOl L27 1.47 1.55 1,85 2.17 2.64 3.04 3.46 497 4.67 6.11 9 99 9.94 12.03 0.43 0,69 0.86 1.19 1.49 1.74 1.84 2.20 2.59 3.20 4.12 3.68 47707 4.17 5.26 4.90 6.14 5.60 6.91 7.55 9.18 9.37 11.22 11.74 13.90 14.17 16.55 0.48 0.77 0.98 1.39 1.78 2.10 2 �3 2.66 3.li lU 0.55 0.88 l,ll 1.62 2.10 2.53 270 3.23 3.83 4.92 i57 6.19 Zib 8.00 110.49 12.69 15.61 18.41 25 0.62 0.98 125 1.84 2.46 3.00 3.24 3.90 4.65 SAS G10 7.12 6.87 7.96 791 8.62 8.61 9.80 953 )0.78 12.34 33.81 14.70 16.26 17.93 19.73 20.88 22.75 50 0.67 1.07 1.36 2.05 2.77 3A6 3.77 4.54 100 0.72 1.15 1.4i 2.23 3.06 3.90 428 4.83 5.17 5.85 6.24 7.09 8.23 9.47 9.16 10.46 9.81 11.09 1L04 12.37 12.09 13.45 U.34 16.90 17.84 19.43 2L52 23.33 24.57 26.36 200 0.77 1.22 154 240 3.36 436 500 0.82 1.30 1.64 2.60 3.73 4.96 S.S7 6.76 8.26 I1.28 12.37 12.94 ]4.24 1537 19.04 21.55 25.72 2jf:8.68 If100 0.87 1.37 1.72 2.79 4.07 SS3 6.27 7.64 939 12.84 13.9C ]45] 15.76 ]G.92 20.73 23.19 2753 30.39 ' The lower Wund d the Parliament larval at 9 confidence Iwel is the value vaictl 5% of the simulated crude values to a given tre'4ueray are lass than. These predPla on neauerty estimates are based on a Partial Wants, magma series ARI is lne Average Reannerce Interval, 61 //`h nnAr n,are nnaa rrnv/n<ri_hin/hAcclhnilrinnt nPrl91\,ne=of$u7titS=Lisc�-,series=Dcl&Stat... 11/12/2009 ranow dorm sewers real, Outfall Project File: P090185-ABB PIPED NETWORK.stm DI-1 Number of lines: 1 I Date: 12-15-2009 Hydraflow Storm Sowers 2008 v12.01 041,w. Q. %Affor DrMilc Proj. file: P090185-ABB PIPED NETWORK.sl J N OC Storm Sewer Summary Report Page 1 Line No. Line ID flow rate (ds) Line size (in) Line shape Line fength (ft) Invert EL Dn (ft) Invert EL Up (ft) Line slope N HGL down (ft) HGL up (ft) Minor loss (ft) HGL Junct (ft) Dns line No. Junction Type 1 6.16 24 Cir 246 90.59 93.05 1.000 91.47 93.93 0.33 93.93 End DropGrate Project File: P090185-ABB PIPED NETWORK.stm Number of lines: 1 Run Date: 05-21-2010 NOTES: Return period = 10 Yrs. Hydrail" Srorm Sewers 2008 02.01 Storm Sewer Inventory Report Page 1 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Dell Junc Known Dmg Runoff Inlet Invert Line Invert Line Line N J-loss Inlet/ line length angle type a area coeff time El Dn slope El Up size shape value coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) N (ft) (in) (n) (K) (ft) 1 End 246 0 DrGrt 0.00 0.96 0.89 5.0 90.59 1.00 93.05 24 Cir 0.013 1.00 97.05 Project File: P090185-ABB PIPED NETWORK.stm Number of lines: 1 Date: 05-21-2010 Hydlfio Storm Sewers 2008,12.01 P1-Pro. 24"RCP TO FOREBAY DESIGN Q FOR 10 YEAR STORM SPLIT FLOW Q(10)= 6.2 CFS Hydraflow CHECK ipe Size = 24 'RCP /W = N/A CHART SD-B (CRM) W = N/A MMI EROSION CONTROL V= 4.6 ZONE= 2 Figure *.06.b.1 Stone Class = B Figure *.06.b.2 Class A B 1 II Dmax 6 12 20 24 Depth 10 22 48 48 LENGTH OF APRON zone class Inlet Outlet 1 A 6 8 2 B 6 12 3 1 med. 8 16 4 1 heavy 8 16 5 2 heavy 10 20 6 21heavy 12 20 SWALE 1: V-Swale Q(10)= 26.30 CFS Q(2)= 20.02 CFS GRADE 0,016 FT/FT SIDE SLOPE(HN)= 3.00 SOILS: IGoA,NoA PROPOSED COVER: Tall fescue Retardance Class: C MAX VELOCITY= 4.50 FPS FINAL CONDITIONS (10 YEAR STORM) D A R VpR n V Q COMMENTS 1.6 7.68 0.76 3.42 0.045 3.48 26.74 Q > Q10; OK V < Vp; OK BARE EARTH, CONSTRUCTION CONDITIONS (2 YEAR STORM) MAX VELOCITY= 2 FPS D A R n V Q COMMENTS 1.06 3.37 0.50 0.02 5.95 20.04 Q > Q2; OK V > Vp; TEMPORARY LINER REQUIRED TRY STRAW WITH NET TEMP: LINER n = 0.033 TABLE 8.05e MAX. SHEAR STRESS (Td) = 1.45 PER TABLE 8.05g T=YDS Y= 62.40 LBS/CUFT D= 1.06 FLOW DEPTH, 2 YEAR STORM S= 0.016 SWALE GRADE, FT/FT T= 1.06 T < Td; OK SWALE 2 Q(10)= 10.50 CFS Da-2 Q(2)= 7.84 CFS Da-2 GRADE 0.010 FT/FT SIDE SLOPE(HN)= 3.00 SOILS: IGoA.NoA PROPOSED COVER: Tall fescue Retardance Class: C MAX VELOCITY= 4.50 FPS FINAL CONDITIONS (10 YEAR STORM) D A R VpR n V Q COMMENTS 1.27 4.84 0.60 2.71 0.048 2.21 10.70 Q > Q10; OK V < Vp; OK BARE EARTH, CONSTRUCTION CONDITIONS (2 YEAR STORM) MAX VELOCITY= 2 FPS D A R n V Q COMMENTS 0.82 2.02 0.39 0.02 3.96 7.98 Q > Q2; OK V < Vp; TEMPORARY LINER REQUIRED. TRY STRAW WITH NET TEMP. LINER n = 0.033 TABLE 8.05e MAX. SHEAR STRESS (Td),= 1.45 PER TABLE 8.05g, - T = YDS Y= 62.40 LBS/CUFT. D= 0.82 FLOW DEPTH, 2 YEAR STORM S= 0.010 SWALE GRADE, FT/FT T= 0.51 T < Td; OK SWALE 3 Q(10)= 0.57 CFS Da-7 Q(2)= 0.42 CFS Da-7 GRADE 0.005 FT/FT SIDE SLOPE(HN)= 3.00 SOILS: GoA,NoA PROPOSED COVER: Tall fescue Retardance Class: C MAX VELOCITY= 4.50 FPS FINAL CONDITIONS (10 YEAR STORM) D A R VpR n V Q COMMENTS 0.58 1.01 0.28 1.24 0.076 0.58 0.59 Q > Q10; OK V < Vp; OK . BARE EARTH, CONSTRUCTION CONDITIONS (2 YEAR STORM) MAX VELOCITY= 2 FPS D A R n V Q COMMENTS 0.31 0.29 0.15 0.02 1.46 0.42 Q > Q2; OK V<Vp; TEMPORARY LINER NOT REQUIRED. TRY STRAW WITH NET TEMP. LINER n = 0.033 TABLE 8.05e MAX. SHEAR STRESS (Td) = 1.45 PER TABLE 8.059 T=YDS Y= 62.40 LBS/CUFT D= 0.31 FLOW DEPTH, 2 YEAR STORM S= 0.005 SWALE GRADE, FT/FT' T= 0.10 ; T < Td'OK OUTLET STRUCTURE BOUYANCY CALCULATIONS I I STRUCTURE WEIGHT BOX DIMENSIONS SIDE (Ft) REAR (Ft) FRONT (Ft) BASE (Ft) FILL .TOTAL WIDTH 3.0 3.0 3.0'-, 4.0 5:. HEIGHT T5 7.5 7.5 2.0, 3.0 DEPTH 0.5 0.5 0.5 3.0 5.0 " # WALLS 2.0 1.0 1.0 1.0 CONCRETE (pcf) 150.0 150.0 150.0 150.0 T50.0 WEIGHT (LBS.)= 3375.0 1687 .5 1687.5 3600 0 11250.0 2160 0:0 (WXHXDXWLXC) WATER FORCES (LBS) WIDTH (Ft)= 4.0 DEPTH.(Ft)= 3.0. HEIGHT (Ft)= 5.5 WATER WGHT 62.4 LBS/CUFT FORCE= 41 18.4 LBS (WIDTH X DEPTH X HT X G) Ilonh:'.mc:ican i,reeo- Effa05 Veuiani"S r.•8/'_G70 5101 Afa'CUTAFUTcU Ol': SiE`JEI15UIE ',FF;OIECi IIb.f.lE:=.BBPIIIE iUPS ''rROlEC711U :. FG901 B5 iSLUFE GESCRiF'ilUll: Country �lJ vt dSI 12> S r al e/R.9ion Illollh LlfDSW SlOpe C iadierd=401 C.ily jGI eeovdrl Annuel R Factor 1 oral Slop. Length IIII I[47 I'uanctinn lyp; I1''eniranent __.__..... r Adlnslnd R Valua I_i0. 7 Slope G.'tdienl III: I I r0 ...-._- ------ SO lype �Vety Flne Salad ^� K Faclur i�-'-' Ifcuo:cdle Soil Luss Tol.ranco linj �GO>-------- ❑each Cum, Disl. Material Verlelation Type "'owlh liabil I Density ASL hate lint ASI. net lint SLT (in) SF Rnnmks iie9in fit? God IIII 1 li 147 jlC25tjRemi. Sod Fcemat 5075:: 003E 0 Wil I 003 93501) STABLE 2 3 G a7 composite nG�e awG Vegttalion Uencity'PacvO.g- .1 ;"1 pondcd by vegil:,licn L-=novel rct;leticl pa(aen nce hUm lFxl4,nW sorllxsW ur�pMeUedj ASLbme-Avtta9e Scul Lca 4utonlialW!vrymlvcted sill loodonn cached ASLmalcAvcc<9e Sod Loss pweelial w/rnalelial(uoJoor uxhesl L6Lhsre-Mm:itrnnn Sod Lose pca:ntial on unprolCued :oA lcuilwm usitea InSLrnal=Llmdoutm Sod Lc,.-paremi5l vx%rnalerielluti.lortn iucbetl SLT=Scd Lor-Tclnm¢v to,:I;pc :eumnn W,J.nindttd SF=S ale(y Facicl Ccr{m:deaAvemye :ed loi: hcat local slape L)r:nth Iw+iimm esl-.eel Pond Outlet Pipe - 15"PVC DESIGN Q FOR 25 YEAR STORM Q(25) 1.11 CFS 25yr storm discharge from pond routing ;HEADWATER. CHECK, ;Pipe Size = .15 "PVC H/W:= ; . ' O CHART SD-B (CRM)'.'.::- WW = 0.00 WAX ALLOWED = n1a EROSION CONTROL V= 4.0 ZONE= 1 Figure'.06.b.1 Stone Class = A Figure `.06.b.2 Class A B 1 II Dmax 6 12 20 24 Depth 10 22 48 48 LENGTH OF APRON zone class Inlet Outlet 1 A 3.75 5 2 B 3.75 7.5 3 1 med. 5 10 4 1 heavy 5 10 5 2 heavy 6.25 12.5 6 2heavy 7.5 12.5 POND OUTLET PIPE Worksheet for Circular Channel Project Description Project File c:\program files\haestad\fmw\p090185.fm2 Worksheet POND OUTLET PIPE Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.009 Channel Slope 0.005000ftffi Diameter 15.00 in Discharge 1.11 cfs Results Depth 0.35 ft Flow Area 0.28 ft2 Wetted Perimeter 1.39 ft Top Width 1.12 ft Critical Depth 0.41 ft Percent Full 27.75 Critical Slope 0.002505 ft/ft Velocity 4.00 f /s Velocity Head 0.25 ft Specific Energy 0.60 ft Froude Number 1.41 Maximum Discharge 7.10 cfs Full Flow Capacity 6.60 cfs Full Flow Slope 0.000142 fUft Flow is supercritical. FlowMaster v5.15 02/08/10 11:40:25 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1