Loading...
HomeMy WebLinkAboutSW6221006_Design Calculations_20230531Stormwater Narrative and Calculations for the NCDEMLR Post Construction Stormwater Management Permit for the +/- 20,000-SF Distribution Facility Expansion for CCBCC -Fayetteville in Cumberland County, North Carolina Prepared For: CCBCC Operations, LLC C"V-, re , � 9— CONSOLIDATED Prepared By: Fitts and Goodwin, Inc. 120 Corporate Blvd. West Columbia, SC 29169 NC License 051479 Initial Submittal: 09/09/2022 Resubmittal: 02/14/2023 Resubmittal: 05/25/2023 A p-/j�''% \�� �Q�oF•Es •ioti!y �� 051479 •FNGINEER . F '11A ti n i OO��� Narrative These calculations have been prepared to address NCDEMLR's post -construction stormwater management requirements for the +/- 20,000-SF Distribution Facility Expansion for CCBCC-Fayetteville. The site is located at 800 Tom Starling Rd. Fayetteville, NC (34°57'8.21 "N, 78°53'37.76"W) which is an unincorporated area of Cumberland County. The current site totals +/- 13.7-acres and includes +/- 6.75-acres of existing built -upon area (BUA). The existing BUA consists of a +/- 45,000-sf warehouse and a +/- 6,500-sf maintenance facility with the remainder being parking and truck court space. Stormwater runoff from this existing BUA is conveyed through a pipe network to an existing wet detention pond located in the northwest quadrant of the site. The remaining areas of the site are grassed, landscaped, and wooded and runoff from these areas bypasses the existing detention pond. The proposed development of the site will include a +/- 20,000-sf expansion to the existing warehouse and expansion of the existing truck court which will result in a net increase of +/- 0.73-ac of impervious area. The total proposed drainage area will be +/- 8.07-ac consisting of +/- 6.75-ac of existing BUA, +/- 0.73-ac of new BUA, and +/- 0.59- ac of grassed area. The proposed drainage pattern will remain consistent with the existing pattern and runoff from the new impervious area will be conveyed to the existing wet detention pond through the existing pipe network. To meet water quality requirements, two (2) Filterra units will be installed adjacent to the +/-1.04-ac existing employee parking lot off of Tom Starling Rd. The units will treat +/- 0.49-ac of existing BUA each, totaling +/- 0.98-ac of existing BUA, which exceeds the area of new BUA. The USGS Soil Survey indicates the site consists of Torhunta (HSG A/D) and Kalmia (HSG B) soils. FEMA Flood Panel 3720043300J indicates the site is located in Zone X — Area of Minimal Flood Hazard. CCBCC Fayetteville 2 September 2022 r ti-U ff„ 2 May2023 Drainage Area and Runoff Calculations CCBCC Fayetteville 15 SepteFnber 2022 r br-UGry 2 May2023 Drainage Area and Runoff Calculations for +/-20,000-SF Distribution Facility Expansion for CCBCC-Fayetteville Drainage Area: Drainage Area to Filterra Unit 1 Runoff Calculation Method: Discrete Drainage Area Characteristics: CN Total Drainage Area = 0.52 ac Directly Connected Impervious Area = 0.49 ac 98 Other Area = 0.03 ac 61 Design Storm Depth = 1.0 in Drainage Area: Drainage Area to Filterra Unit 2 Runoff Calculation Method: Discrete Drainage Area Characteristics: CN Total Drainage Area = 0.52 ac Directly Connected Impervious Area = 0.49 ac 98 Other Area = 0.03 ac 61 Design Storm Depth = 1.0 in NRCS Curve Number Method for Runoff Volume: 5 = 1000 - 10 CN Where: S = Maximum retention after rainfall begins (in) CN = Curve number (unitiess) Q* (P + 0 8s) Where: Q' = Runoff depth (in) P - Rainfall depth (in) Drainage Area 1 CN = S = P= Q* = DA 1 Total Q* (ft3) = Directly Connected Imp. Area Other Area 98.0 61 0.20 0 1 0 0.7909 0 1407 Drainage Area CN = S = P= Q* = DA 2 Total Q* (ft3) = 2 Directly Connected Imp. Area Other Area 98.0 61 0.20 0 1 0 0.7909 0 1407 Minimum Treatment Volume Required = 2,814 cu ft Minimum Treatment Volume Provided = (See Contech-Filterra Calculations Attached) Project No.: 22000-0600 Date: September 2022 Revised May 2023