Loading...
HomeMy WebLinkAboutNC0038300_Authorization to Construct_20001116State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director November 16, 2000 Mr, James R. Edwards S. S. Construction Co. P.O. Box 810 Siler City, North Carolina 27344 ern NCDENR Subject: Authorization to Construct ATC No. 038300ACA NPDES Permit No. NCO038300 Dunn's Mobile Home Park WWTP Chatham County Dear Mr. Edwards: The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct at the Dunn's Mobile Home Park WWTP. The request consists of design documents received May 241h and revisions received October 3rd and 161h. The Division finds the proposed improvements and design to be satisfactory and hereby grants authorization for the following: • construction and installation of: • a 3,560 gallon circular steel equalization tank; • a 5,500 gallon circular steel aeration basin; and • all related structures, equipment, piping, controls, and other appurtenances, as described in the proposed design documents; and • decommissioning of the existing polishing sand filter. Upon completion of these improvements and submittal of the Engineer's Certification (see below), the approved design capacity of the treatment facilities shall remain at 0.010 MGD. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO038300 issued November 19, 1996, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in that permit. Special Provisions This Authorization is conditioned upon your meeting the following requirements: 1. Relocate the feed line or the overflow fine or both at the new aeration basin, in order to minitnize short-circuiting of raw wastewater through the basin. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 FAX (919) 733-0719 An Equal Opportunity Affirmative Action Employer Internet: http://h2o.enr.state.nc.us/ Z Dunn's Mobile Home Park WWTP NPDES Permit No. NC0038300 ATC No. 038300ACA Page 2 2. Modify the new aeration basin feed line, as necessary, to eliminate the possibility of its siphoning water from the aeration basin back to the equalization basin. Options include but are not limited to adding a check valve to the line or positioning the end of the feed line above the top elevation of the basin. 3. Adjust the level switches in the equalization tank to provide a full 2,500 gallons capacity (25% of average design flow) in the tank. 4. Evaluate the performance of the equalization system and, if necessary, modify the design or operation to achieve the desired performance. The average design flow to the plant is 7 gpm, and the actual flow has been averaging only 2-3 gpm. However, the proposed feed pump is rated at 14 gpm and has the potential to increase rather than decrease peak flows through the plant. These actions do not necessarily require prior approval of new design documents by the Division; simply identify any substantial changes in the current design in the engineer's certification (see below). However, any major revisions should be submitted for review. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Notification Requirements The Permittee shall notify the Raleigh Regional Office, telephone number (919) 571-4700, at least forty-eight (48) hours in advance of operation of the installed facilities, so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours of 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Engineer's Certification Upon completion of construction and prior to operation of the modified facility, the Pernnittee shall provide the Division with a certification from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. If the completed improvements differ substantially from the approved design, the differences shall be noted in the Certification and documented appropriately. Mail the Certification to the NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Certified Operator The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the Nastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0200. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays; and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8G, .0200. Dunn's Mobile Home Park WWTP NPDES Permit No. NC0038300 ATC No. 038300ACA Page 3 Additional Provisions The Operational Agreement between the Pertrtittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. One (1) copy of the approved design documents is enclosed for your records. If you have any questions about this Authorization to Construct, please contact Mike Templeton, at (919) 733-5083, extension 541. Sincerely, err T. Stevens Director Enclosures: Project Design Documents Engineer's Certification Form cc: Raleigh Regional Office, Water Quality Technical Assistance and Certification Unit Central Files NPDES'Unit Files# Mr. Gary S. \]acConnell, P.E. (w/ certification form) MacConnell & Associates, P.C. P.O. Box 3096 Cary, NC 27519 AAA �_ NCDENR TO: Mr. James R. Edwards P.O. Box 810 LETTER OF TRANSMITTAL Siler City, North Carolina 27344 SUBJECT: Authorization to Construct S.S. Mobile Home Park FROM We are sending you ® Attached ❑ Under separate cover via DATE: December 12, 2000 Mike Templeton DWQ/ NPDES Raleigh the following items: COPIES DATE DESCRIPTION 1 11/17/00 ATC letter, K.T. Stevens to J.R. Edwards, and attached engineering certification form X X X These are transmitted: ❑ For Action ❑ For Signature ❑ For Approval Remarks: If enclosures are not as listed, please notify us at once. ❑ For Review and Comment ❑ Read and Return ❑ Read and Route to Files ® For Your Information ❑ Per Your Request ❑ Per Our Conversation ❑ In Return, After Loan to Us ❑ With Comments Noted 11 Mr. Edwards - Ted Cashon mentioned that you have not received the Authorization to Construct we issued November 17 for improvements at your treatment plant. We mailed both Ted's and your copies at the same time, so I'm not cure why only one was delivered. In any event, I apologize for the inconvenience and am enclosing a copy of the ATC for your use. Ted also mentioned that (1) ATC did not show the correct facility name and (2) your permit does not list the tablet dechlorinator and waste storage tank as parts of the treatment system. I will look into these and get back to you within the next two weeks. Feel free to dive me a call if you have COPYTO: NPDES Files - 38300 SIGNED PHONE (919) 733-5053 Ext. Division of Water Quality - 1617 Mail service Center - Raleigh, NC 27699-1617 (919) 7335083 - FAX (919) 733-0719 SOC PRIORITY PROJECT: No AUTHORIZATION TO CONSTRUCT NPDES PERMIT REPORT AND RECOMMENDATIONS FOR S. S. CONSTRUCTION COMPANY (DUNN'S MOBILE HOME PARK November 16, 2000 � Project No.: 038300ACA e To: Mike Templeton, Water Quality NPDES Permitting From: Randy Jones, Raleigh Regional Office County: Chatham . Permit No: NC0038300 PART I - GENERAL INFORMATION L Facility Name and Current Address: Mr. James Edwards S. S. Construction & Rental, Inc. PO Box 810 Siler City, N. C. 27344 Dunn's MHP Chatham County 2. Date of most recent NPDES Staff Report (attach copy): A staff report was not available in the RRO files. 3. Changes since previous action on NPDES Permit: On 2/27/98, an A to C was issued for the modification of the existing sandfilter to accomodate a tablet chlorinator and contact chamber, dual distribution laterals, four collection lines, new filter sand, and the installation of a tablet dechlorinator. 4. Verify Discharge Point(s) on plans with current NPDES Permit. List for all discharge points: Discharge point is not specified on plans. Latitude and longitude expressed below are from 9/8/97, A to C staff report. Latitude: 350 44' 18" Longitude: 790 32' 08" Attach a USGS map extract and indicate treatment facility site and discharge point on map: Map attached. U.S.G.S. Quad No.: E20NW U.S.G.S. Quad Name: Coleridge 5. Treatment plant classification (attach completed ratings sheet): Grade II Biological; Ratings Sheet Attached PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Existing treatment facility a. What is the current permitted capacity of the facility? 0.01 MGD b. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two (2) years:On 2/27/98, an A to C was issued for the modification of the existing sandfilter to accomodate a tablet chlorinator and contact chamber, dual distribution laterals, four collection lines, new filter sand, and the installation of a tablet dechlorinator. C. What is the actual treatment capacity of the current facility (design volume)? 0.01 MGD d. Please provide a description of existing or substantially constructed wastewater treatment facilities: Existing facilities consist of a small activated sludge plant, clarification, chlorine disinfection, a polishing sandfilter, and dechlorination. 2. Please provide a description of proposed wastewater treatment facilities: The proposed facilities consist of an additional aeration and flow equalization chamber and the elimination of the existing sandfilter. 3. Residuals handling and utilization/disposal scheme: Septage hauler. 2 a. If residuals are being land applied, please specify DEM permit no.: Residual Contractor: b. Residuals stabilization: C. Landfill: d. Other disposal/utilization scheme (Specify): 4. Important SOC, JOC or Compliance Schedule dates: 5. Wastewater Code: 08 6. MTU:450-7 7. SIC Code: 4952 III. EVALUATION AND RECOMMENDATIONS I have reviewed the submittal information for this project. The submittal indicates that tanks will be added for aeration and flow equalization and that the existing sandfilter will be eliminated. I am aware that the NPDES Unit has had several conversations with the consultant regarding the proposed design. I have received a copy of some revisions to the original proposal, but have not received any information nor heard of the resolution of a question regarding the capacity of the pump to be used for equalization. It appeared that the pump was much too large to function satisfactorily for flow equalization. Please provide the RRO with a copy of any additional information received, etc. Upon resolution of the issue regarding the flow equalization pump and upon satisfactory review of the project by the WQ NPDES Unit, the WQ RRO does not object to the issuance of this A to C: Signature 0 Rep t Preparer (038300ACA) Date t I /Z-O /0)(!� Water Quality Regional Supervisor (038300ACA) D file: h:latc138300aca.sr 3