HomeMy WebLinkAboutNC0062413_Compliance Evaluation Inspection_20230525
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED.
May 25, 2023
T Stephen Sheets
Linville Ridge Development Company
Email: steve@linvilleridge.com
SUBJECT: Compliance Inspection Report
Linville Ridge Country Club WWTP
NPDES WW Permit No. NC0062413
Avery County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Linville Ridge Country
Club WWTP on 4/27/2023. This inspection was conducted to verify that the facility is operating in
compliance with the conditions and limitations specified in NPDES WW Permit No. NC0062413. The
findings and comments noted during this inspection are provided in the enclosed copy of the inspection
report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Mara Chamlee with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4657 or via email at
mara.chamlee@ncdenr.gov.
Sincerely,
Daniel Boss, Assistant Regional Manager
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Water Quality Labs
DocuSign Envelope ID: 537A065B-9260-424C-83C2-E1DBEFE0BD79
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0062413 23/04/27 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Linville Ridge Country Club WWTP
NC Hwy 105
Linville NC 28646
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 23/04/27 20/03/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Glenn Burleson/ORC/423-957-9123/
Other Facility Data
12:00PM 23/04/27 25/01/31
Name, Address of Responsible Official/Title/Phone and Fax Number
T Stephen Sheets,PO Box 704 Linville NC 286460704//828-898-5533/8288989573 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Lauren E Armeni DWR/ARO WQ/828-296-4500/
Mara G Chamlee DWR/ARO WQ/828-296-4500/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 537A065B-9260-424C-83C2-E1DBEFE0BD79
5/25/2023
5/25/2023
5/31/2023
NPDES yr/mo/day
23/04/27
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Mara Chamlee and Lauren Armeni, with the Asheville Regional Office, conducted a Compliance
Evaluation Inspection of the Linville Ridge Country Club WWTP on April 27, 2023. This inspection
was conducted to determine whether the facility is being operated and maintained in compliance with
NPDES Permit No. NC0062413. Mr. Glenn Burleson (Water Quality Labs, ORC) was present and
assisted in the inspection.
The collection system is gravity fed and the clubhouse is the only building connected to the WWTP.
The clubhouse is closed from October 28th through May 1st each year.
The following items were noted during the inspection:
1. Aeration Basin: Settleability was 987 mL out of 1000mL after thirty minutes. Poor settleability was
due to excess grease in the system, which has been an ongoing issue.
2. Disinfection - UV: The intensity meter is still not operational, however the indicator lights on the UV
system show if the bulbs are functioning. The previous inspection report noted that the UV system
was in a confined space, however the current ORC took some covers off to open the space up.
3. Flow Measurement - Effluent: At the time of the inspection, the flow meter was not operational and
the flow was being estimated. Water Quality Labs has confirmed that they have ordered a new control
box for the facility.
The following compliance issue was noted during the inspection:
1. Operations & Maintenance: The restaurant on site is continually causing significant issues with
grease throughout the plant. Although Water Quality Labs has provided documentation of Triple T
Pumping Inc. pumping the grease traps monthly, there is still an excessive level of grease visible
throughout the plant. The grease is creating significant difficulty in settleability. I have spoken with the
owner of the facility to address the grease issues at this facility. I will continue to try to reach the
restaurant managers of the country club in order to convey actions needed to address the grease
concerns.
NC0062413 17 (Cont.)
Page#2
DocuSign Envelope ID: 537A065B-9260-424C-83C2-E1DBEFE0BD79
Permit:NC0062413
Inspection Date:04/27/2023
Owner - Facility:
Inspection Type:
Linville Ridge Country Club WWTP
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Page#3
DocuSign Envelope ID: 537A065B-9260-424C-83C2-E1DBEFE0BD79
Permit:NC0062413
Inspection Date:04/27/2023
Owner - Facility:
Inspection Type:
Linville Ridge Country Club WWTP
Compliance Evaluation
Operations & Maintenance Yes No NA NE
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Process controls analyzed include dissolved oxygen, pH, temperature, and settleability.
Mr Burleson indicated that the restaurant on site at the clubhouse causes issues with
excessive grease throughout the plant. Water Quality Labs has provided
documentation from Triple T Pumping, Inc. of having the grease traps pumped monthly
during the restaurant's operational season. See summary for details.
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Mr. Burleson indicated that the screenings are dried out and then disposed of in a
dumpster on site. He also indicated that this facility has never had issues with clogging
or overflows from the bar screen. The bar screen was rusted and it would be beneficial
to paint it.
Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
The plant consists of three, 5,000-gallon aeration basins. Mr. Burleson indicated that
he sets the air lower in the third basin to allow for settling before the flow proceeds to
the clarifier. There are high levels of grease throughout the plant due to the clubhouse
restaurant. The grease is floating and visible throughout all three aeration basins. The
settleometer read 970 mL out of 1000 mL after thirty minutes. The presense of
excessive grease is causing the lack of settling. The DO was 3.91. See summary for
details.
Comment:
Page#4
DocuSign Envelope ID: 537A065B-9260-424C-83C2-E1DBEFE0BD79
Permit:NC0062413
Inspection Date:04/27/2023
Owner - Facility:
Inspection Type:
Linville Ridge Country Club WWTP
Compliance Evaluation
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
The sludge judge showed a 1' blanket of sludge out of 8.25', however above the
sludge blanket was approximately 7' of fluffy solids due to the excessive grease.
Comment:
Aerobic Digester Yes No NA NE
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
Water Quality Labs contracts pumping of the digester to Triple T Pumping, Inc. Mr.
Burleson indicated that it is usually pumped every two to three months. He also stated
that it was last pumped approximately three weeks prior to the inspection. Mr. Burleson
indicated that during the off season they will empty the digester around the date that
the clubhouse closes for the season so that they can waste into the digester.
Comment:
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
Page#5
DocuSign Envelope ID: 537A065B-9260-424C-83C2-E1DBEFE0BD79
Permit:NC0062413
Inspection Date:04/27/2023
Owner - Facility:
Inspection Type:
Linville Ridge Country Club WWTP
Compliance Evaluation
Disinfection - UV Yes No NA NE
Mr. Burleson indicated that there are extra UV bulbs available at the Water Quality
Labs office in Banner Elk. He also indicated that he cleans the bulbs approximately
once per week. The backup system on site is chlorination and dechlorination tablets.
The UV intensity meter is not operational. See summary for details.
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
At the time of the inspection, the flow meter was not operational due to an issue with
the control box. Mr. Burleson indicated that they believed it may have been struck by
lightening. The flow meter had not recorded since March 2023. Due to this, Mr.
Burleson indicated that they are currently estimating flow. See summary for details.
Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
The effluent pipe is accessible and is located over a small hill behind the plant. The
effluent pipe was discharging at the time of the inspection.
Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
The permit requires grab samples. Mr. Burleson indicated that samples are collected
down in the UV contact chamber. He also indicated that he transports the samples to
Water Quality Labs for analysis on ice.
Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Page#6
DocuSign Envelope ID: 537A065B-9260-424C-83C2-E1DBEFE0BD79
Permit:NC0062413
Inspection Date:04/27/2023
Owner - Facility:
Inspection Type:
Linville Ridge Country Club WWTP
Compliance Evaluation
Standby Power Yes No NA NE
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
There is no generator located on site at the facility, but Water Quality Labs has a few
portable generators at their office in Banner Elk. The clubhouse is on well water, so
there is no flow to the WWTP when the power is down.
Comment:
Page#7
DocuSign Envelope ID: 537A065B-9260-424C-83C2-E1DBEFE0BD79