Loading...
HomeMy WebLinkAbout20150574 Ver 1_401 Application_20150622Strickland, Bev From: Mac Harmon <mac @ncdeng.com> Sent: Monday, June 22, 2015 12:12 PM To: Strickland, Bev Cc: Kirk Rightmyer Subject: DWR# 150574 - Jake's Ridge Attachments: 2015 05 -07 -15 NCDENR Jake Ridge Application.pdf, Drawings and Maps.pdf Beverly, Here's an electronic pdf copy of the above application including the large maps and drawings. If you need anything else, just e -mail or call. This one has the attachments. Thanks Mac Harmon Designer NC Development Engineers, PA 238 W. Millbrook Road Raleigh, NC 27609 (Office) 919.803.8704 (Fax) 866.519.1284 (Toll Free) o'�'NAa q� Office Use Only: �? Y Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: 1 b. Specify Nationwide Permit (NWP) number: 29 1c. Has the NWP or GP number been verified by the Corps? ❑X Section 404 Permit ❑ Section 10 Permit or General Permit (GP) number: ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ because written approval is not required? 401 Certification: ❑ Yes X❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? 2. Project Information 2a. Name of project: Jake's Ridge 2b. County: Granville 2c. Nearest municipality / town: Town of Oxford 2d. Subdivision name: Jake's Ridge 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Jakes Ridge, LLC 3b. Deed Book and Page No. DB 1534 PG 354 3c. Responsible Party (for LLC if Bruce Whitten applicable): 3d. Street address: 5019 Tall Pines Court 3e. City, state, zip: Raleigh, NC 27609 3f. Telephone no.: 919.390.4240 3g. Fax no.: 919.781.3986 3h. Email address: bmwnstarnc @bellsouth.net For the record only for Corps Permit: ❑ Yes ❑X No ❑ Yes ❑X No ❑ Yes ❑- No ❑ Yes ❑X No Page 1 of 10 PCN Form - Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑X Agent ❑ Other, specify: 4b. Name: Kirk W. Rightmyer, PE 4c. Business name NC Development Engineers, PA (if applicable): 4d. Street address: 238 W. Millbrook Road 4e. City, state, zip: Raleigh, NC 27609 4f. Telephone no.: 919.803.8704 4g. Fax no.: 866.519.1284 4h. Email address: kirk @ncdeng.com 5. Agent /Consultant Information (if applicable) 5a. Name: Kirk W. Rightmyer, PE 5b. Business name NC Development Engineers, PA (if applicable): 5c. Street address: 238 W. Millbrook Road 5d. City, state, zip: Raleigh, NC 27609 5e. Telephone no.: 919.803.8704 5f. Fax no.: 866.519.1284 5g. Email address: kirk @ncdeng.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): Latitude: 36.29614 1c. Property size: 2. Surface Waters 2a. Name of nearest body of water to proposed project: 2b. Water Quality Classification of nearest receiving water 2c. River basin: 3. Project Description 192209070303 Longitude: - 78.592022 9 acres Fishing Creek Tributary 1A C;NSW Tar - Pamlico 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing Mixed Deciduous - Coniferous Forest Land constitutes 100% coverage. The subject tract is undeveloped with residential apartments located to the east, East Industry drive bounds the southern line, and undeveloped land to the north and west. 3b. List the total estimated acreage of all existing wetlands on the property: 0.54 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 655 3d. Explain the purpose of the proposed project: Jake's Ridge is a proposed affordable 64 -unit apartment project. 3e. Describe the overall project in detail, including the type of equipment to be used: Jake's Ridge is a proposed 64 -unit apartment project consisting of 7 apartment buildings and one Community /Office building parking and utilities. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ❑ Yes ❑X No ❑ Unknown Corps or State been requested or obtained for this property / ro ect (including all prior phases) in the past? Comments: A private consultant has evaluated the property. P 1 (� 9 P� P )� p � 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Landis, PLLC /Barrett Kays PH.D. Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ❑X No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? 6b. If yes, explain. ❑ Yes ❑X No Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. width 2a. 2b. Temporary (T) 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number S3 - Choose one Corps (404,10) or impact Permanent (P) or S5 - DWQ (401, other) (acres) Temporary (T) S6 - Choose one W1 P Fill Small -Basin Wetland Yes Corps 0.019 W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No W4 - Choose one Choose one Yes /No W5 - Choose one Choose one Yes /No W6 - Choose one Choose one Yes /No 2g. Total Wetland Impacts: 0.019 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Culvert Fishing Creek Tributary PER DWQ 6 28.5 S2 Choose one S3 - Choose one S4 - Choose one S5 - Choose one - S6 - Choose one 3i. Comments: 3h. Total stream and tributary impacts 28.5 Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody B3 Yes /No impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or B6 - type Temporary (T) 6h. Total Buffer Impacts: 61. Comments: See attached report from Landis (Barrett L. Kays, Ph.D.) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose O4 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Stormwater P2 Stormwater 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑X Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — mitigation impact impact Permanent (P) or required? (square (square Temporary (T) feet) feet) B1 Yes /No B2 Yes /No B3 Yes /No B4 - Yes /No B5 Yes /No B6 - Yes /No 6h. Total Buffer Impacts: 61. Comments: See attached report from Landis (Barrett L. Kays, Ph.D.) Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The site layout for Jake's Ridge was designed to eliminate additional creek crossings and to minimize the impact on the existing wetlands by positioning buildings and proposed grading away from the existing wetlands and perennial stream. The existing pipe culvert under Industry Drive has to be extended for a proposed widening of Industry Drive. A headwall is being utilized to minimize the stream impact. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. n/a 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ❑X No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: Type: Choose one Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 27.2% 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Two permanent stormwater detention ponds will be constructed to mitigate the Pre to Post Construction Stormwater runoff. 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 3b. Which of the following locally - implemented stormwater management programs apply (check all that apply): 3c. Has the approved Stormwater Management Plan with proof of approval been attached? 4. DWQ Stormwater Program Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): 4b. Has the approved Stormwater Management Plan with proof of approval been attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? 5b. Have all of the 401 Unit submittal requirements been met? NCDENR Granville County / Town of Oxford ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: ❑ Yes ❑ No ❑Coastal counties ❑HQW ❑ORW F-1 Session Law 2006 -246 ❑ Other: ❑ Yes 0 No ❑X Yes ❑ No 0 Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑X No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in E] Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The Town of Oxford has allocated Sanitary Sewage Capacity and will receive the wastewater from Jake's Ridge. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes Q No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑x Yes ❑ No impacts? 5c. if yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? See the attached copy of the EDR NEPA Report that was commissioned for this project. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? See the attached copy of the EDR NEPA Report that was commissioned for this project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation E] Yes Q No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? See the attached copy of the EDR NEPA Report that was commissioned for this project. NC Listings in the National Register (thr`ough the State Historic Preservation Office). 6. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes Q No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NFIP FIRM 3720192200J, 3720191200J Kirk W. Rightmyer, PE / 6 J 04 -07 -1 5 Applicant/Agent's Printed Name Applicant/Age igature Date (Agents signature is v y rization letter from the applicant is provided.) Page 10 of 10