HomeMy WebLinkAbout20150574 Ver 1_401 Application_20150622Strickland, Bev
From: Mac Harmon <mac @ncdeng.com>
Sent: Monday, June 22, 2015 12:12 PM
To: Strickland, Bev
Cc: Kirk Rightmyer
Subject: DWR# 150574 - Jake's Ridge
Attachments: 2015 05 -07 -15 NCDENR Jake Ridge Application.pdf, Drawings and Maps.pdf
Beverly,
Here's an electronic pdf copy of the above application including the large maps and drawings.
If you need anything else, just e -mail or call.
This one has the attachments.
Thanks
Mac Harmon
Designer
NC Development Engineers, PA
238 W. Millbrook Road
Raleigh, NC 27609
(Office) 919.803.8704
(Fax) 866.519.1284 (Toll Free)
o'�'NAa
q� Office Use Only:
�? Y Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the Corps:
1 b. Specify Nationwide Permit (NWP) number: 29
1c. Has the NWP or GP number been verified by the Corps?
❑X Section 404 Permit ❑ Section 10 Permit
or General Permit (GP) number:
❑ Yes ❑X No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ
because written approval is not required? 401 Certification:
❑ Yes X❑ No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
2. Project Information
2a.
Name of project:
Jake's Ridge
2b.
County:
Granville
2c.
Nearest municipality / town:
Town of Oxford
2d.
Subdivision name:
Jake's Ridge
2e.
NCDOT only, T.I.P. or state project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
Jakes Ridge, LLC
3b.
Deed Book and Page No.
DB 1534 PG 354
3c.
Responsible Party (for LLC if
Bruce Whitten
applicable):
3d.
Street address:
5019 Tall Pines Court
3e.
City, state, zip:
Raleigh, NC 27609
3f.
Telephone no.:
919.390.4240
3g.
Fax no.:
919.781.3986
3h.
Email address:
bmwnstarnc @bellsouth.net
For the record only for Corps Permit:
❑ Yes ❑X No
❑ Yes ❑X No
❑ Yes ❑- No
❑ Yes ❑X No
Page 1 of 10
PCN Form - Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a.
Applicant is:
❑X Agent ❑ Other, specify:
4b.
Name:
Kirk W. Rightmyer, PE
4c.
Business name
NC Development Engineers, PA
(if applicable):
4d.
Street address:
238 W. Millbrook Road
4e.
City, state, zip:
Raleigh, NC 27609
4f.
Telephone no.:
919.803.8704
4g.
Fax no.:
866.519.1284
4h.
Email address:
kirk @ncdeng.com
5.
Agent /Consultant Information (if applicable)
5a.
Name:
Kirk W. Rightmyer, PE
5b.
Business name
NC Development Engineers, PA
(if applicable):
5c.
Street address:
238 W. Millbrook Road
5d.
City, state, zip:
Raleigh, NC 27609
5e.
Telephone no.:
919.803.8704
5f.
Fax no.:
866.519.1284
5g.
Email address:
kirk @ncdeng.com
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
1 b. Site coordinates (in decimal degrees): Latitude: 36.29614
1c. Property size:
2. Surface Waters
2a. Name of nearest body of water to proposed project:
2b. Water Quality Classification of nearest receiving water
2c. River basin:
3. Project Description
192209070303
Longitude: - 78.592022
9 acres
Fishing Creek Tributary 1A
C;NSW
Tar - Pamlico
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing Mixed Deciduous - Coniferous Forest Land constitutes 100% coverage. The subject tract is undeveloped with residential apartments located to
the east, East Industry drive bounds the southern line, and undeveloped land to the north and west.
3b. List the total estimated acreage of all existing wetlands on the property: 0.54
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 655
3d. Explain the purpose of the proposed project:
Jake's Ridge is a proposed affordable 64 -unit apartment project.
3e. Describe the overall project in detail, including the type of equipment to be used:
Jake's Ridge is a proposed 64 -unit apartment project consisting of 7 apartment buildings and one Community /Office building parking and utilities.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the ❑ Yes ❑X No ❑ Unknown
Corps or State been requested or obtained for this property /
ro ect (including all prior phases) in the past?
Comments: A private consultant has evaluated the property.
P 1 (� 9 P� P )� p �
4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Landis, PLLC /Barrett Kays PH.D.
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for ❑ Yes ❑X No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project?
6b. If yes, explain.
❑ Yes ❑X No
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑X Wetlands
❑X Streams
—tributaries ❑ Buffers
❑ Open Waters
❑ Pond Construction
2. Wetland Impacts
Stream name Perennial (PER) or Type of Average
Impact
number
intermittent (INT)? jurisdiction stream
If there are wetland impacts proposed on
the site, then complete this question for each wetland
area impacted.
width
2a. 2b.
Temporary (T)
2c.
2d.
2e.
2f.
Wetland impact
Type of impact
Type of wetland
Forested
Type of jurisdiction
Area of
number
S3 -
Choose one
Corps (404,10) or
impact
Permanent (P) or
S5 -
DWQ (401, other)
(acres)
Temporary (T)
S6 -
Choose one
W1 P
Fill
Small -Basin Wetland
Yes
Corps
0.019
W2
Choose one
Choose one
Yes /No
W3
Choose one
Choose one
Yes /No
W4 -
Choose one
Choose one
Yes /No
W5 -
Choose one
Choose one
Yes /No
W6 -
Choose one
Choose one
Yes /No
2g. Total
Wetland Impacts:
0.019
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c. 3d. 3e. 3f.
3g.
Stream impact
Type of impact
Stream name Perennial (PER) or Type of Average
Impact
number
intermittent (INT)? jurisdiction stream
length
Permanent (P) or
width
(linear
Temporary (T)
(feet)
feet)
S1 P
Culvert
Fishing Creek Tributary PER DWQ 6
28.5
S2
Choose one
S3 -
Choose one
S4 -
Choose one
S5 -
Choose one
-
S6 -
Choose one
3i. Comments:
3h. Total stream and tributary impacts 28.5
Page 4 of 10
PCN Form — Version 1.4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b.
4c.
4d. 4e.
Open water Name of waterbody
B3
Yes /No
impact number (if applicable)
Type of impact
Waterbody Area of impact (acres)
Permanent (P) or
B6 -
type
Temporary (T)
6h. Total Buffer Impacts:
61. Comments: See attached report from Landis (Barrett L. Kays, Ph.D.)
01
Choose one
Choose
02
Choose one
Choose
03
Choose one
Choose
O4 -
Choose one
Choose
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland
purpose of pond (acres)
Flooded Filled Excavated Flooded Filled Excavated
P1 Stormwater
P2 Stormwater
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a. Project is in which protected basin? ❑ Neuse ❑X Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other:
6b. 6c. 6d. 6e. 6f. 6g.
Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2
number — mitigation impact impact
Permanent (P) or required? (square (square
Temporary (T) feet) feet)
B1
Yes /No
B2
Yes /No
B3
Yes /No
B4 -
Yes /No
B5
Yes /No
B6 -
Yes /No
6h. Total Buffer Impacts:
61. Comments: See attached report from Landis (Barrett L. Kays, Ph.D.)
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The site layout for Jake's Ridge was designed to eliminate additional creek crossings and to minimize the impact on the existing wetlands by
positioning buildings and proposed grading away from the existing wetlands and perennial stream. The existing pipe culvert under Industry Drive has
to be extended for a proposed widening of Industry Drive. A headwall is being utilized to minimize the stream impact.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
n/a
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes ❑X No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
El Payment to in -lieu fee program
project?
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
Type: Choose one Quantity:
3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity:
Type: Choose one Quantity:
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: Choose one
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non - riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1
3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑ No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 27.2%
2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
Two permanent stormwater detention ponds will be constructed to mitigate the Pre to Post Construction Stormwater runoff.
2e. Who will be responsible for the review of the Stormwater Management Plan?
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
3b. Which of the following locally - implemented stormwater management programs
apply (check all that apply):
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
4. DWQ Stormwater Program Review
4a. Which of the following state - implemented stormwater management programs apply
(check all that apply):
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
5b. Have all of the 401 Unit submittal requirements been met?
NCDENR
Granville County / Town of Oxford
❑ Phase II
❑ NSW
❑ USMP
❑ Water Supply Watershed
❑ Other:
❑ Yes ❑ No
❑Coastal counties
❑HQW
❑ORW
F-1 Session Law 2006 -246
❑ Other:
❑ Yes 0 No
❑X Yes ❑ No
0 Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑X No
use of public (federal /state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after - the -fact permit application? ❑Yes ❑X No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in E] Yes ❑X No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
The Town of Oxford has allocated Sanitary Sewage Capacity and will receive the wastewater from Jake's Ridge.
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ❑ Yes Q No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ❑x Yes ❑ No
impacts?
5c. if yes, indicate the USFWS Field Office you have contacted. Raleigh
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
See the attached copy of the EDR NEPA Report that was commissioned for this project.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
See the attached copy of the EDR NEPA Report that was commissioned for this project.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation E] Yes Q No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
See the attached copy of the EDR NEPA Report that was commissioned for this project.
NC Listings in the National Register (thr`ough the State Historic Preservation Office).
6. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes Q No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
NFIP FIRM 3720192200J, 3720191200J
Kirk W. Rightmyer, PE / 6 J
04 -07 -1
5
Applicant/Agent's Printed Name Applicant/Age igature Date
(Agents signature is v y rization
letter from the applicant is provided.)
Page 10 of 10