Loading...
HomeMy WebLinkAboutNCC217053_NOT Closeout Documents_20230526 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Wake Project: West Village South Feeder Main River basin: Cape Fear Person financially responsible:Public Service Co of NC,Inc-Andrew Moore Project#: WAKE-2022-040 Address: PO Box 1398,800 Gaston Rd,Building A,Gastonia, 1. Project Location: Old US 1 Highway,Apex Pictures: No 2. Weather and soil conditions: sunny,dry,workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): no one Title: Inspection report: Sent Report Date given/sent: May 23,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: May 23,2023 Time arriving on site: 1:20 PM Time leaving site: 1:30 PM CC: