Loading...
HomeMy WebLinkAboutNC0064734_Permit Issuance_20000204-` 'State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director February 4. 2000 Mr. Randol Tilgham Centex Homes 5550 77 Center Road # 100 Charlotte, North Carolina 28217 1t •: NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCE5 Subject: NPDES Permit Issuance Permit :Number NCO064734 Bradfield Farms \VWTP Cab R1'I-LIS County Dear Mr. Tilgham: In accordance with the application for discharge permit received on March �. 1999, the Division is forwarding herewith the subject state - NPDES permit. This permit is issued pursuant to the requirements of .North Carolina General Statute 145-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency dated December 6. 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you. you have the right to an adjudicator% hearing upon written request within shirt% (50) days following receipt of this letter. This request must be in the form of a written petition. conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center. Raleigh. North Carolina 27699-6714. Unless such a demand is made. this permit shall be final and binding. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources. Coastal area Management act. or any other Federal or Local governmental permits which may be required. If you have any questions regarding the attached draft permit, please do not hesitate to contact me at telephone number (919) 758-5083, extension 553. Sincerely. Original Signed By David A. Goodrich Kerr T. Stevens Cc: Cenual Files VPDES Permit File Mooresville Regional Office Point Source Compliance/Enforcement Unit 1617 MAIL SLR\ICE CENTER, RALEIGH. NORTH CAROLINA 27699-1617 - TELEPHONE 919-733-5083/FAX 919-733-0719 AN EQUAL OPPORI UNITY Art IRM1IAI rvE ACTION EMPLOYER - 50% RECYCLE U/ 10% PSI -CONSUMER PAPER V1511 us ON I HE WEB AT http://h2o.enr.Sta[C.nc-uVNPDES Permit No. NCO064754 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY PERMIT TO DISCHARGE WASTEWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 145-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal \k%ater Pollution Control act, as amended, Bradfield Farms Water Co./Centex Homes is hereby authorized to discharge waste%vater from a facility located at Bradfield Farms WWTP Off of NCSR 2951 Southeast of Pine Ridge Cabarrus County to receiving waters designated as �IMcKee Creek in the Yadkin Pee -Dee River Basin in accordance \with effluent limitations, monitoring requirements; and other conditions set forth in Parts I, I1, I11 and Rhereof. This permit shall become effective 1\March 1, 2000. This permit and authorization to discharge shall expire at midnight on November 50, 2005. Signed this day February 4, 2000. Original Signed By David A. Goodrich Kerr T. Stevens, Director Division of Water Quality By Authority of the Environmental !Management Commission r Permit No. NCO064734 SUPPLEMENT TO PERMIT COVER SHEET Bradfield Farms Water Co./Centex Homes is hereby authorized to: 1. Continue operation of an existing 0.46 NIGD wastewater treatment facility consisting of an influent lift station, bar screen Q flow splitter box, dual surge tanks, aeration basins. secondary clarifiers, sludge holding tanks, chlorine contact tanks with gas chlorination, traveling bridge tertiary filters, and post aeration tanks, located at Bradfield Farms Subdivision off of NCSR 2951. southeast of line Ridge. Cabarrus County: 9. After receiving an Authorization to Construct from the Division of Water Quality, construct and operate additional wastewater treatment facilities making the build -out treatment capacity 0.7 MGD. and 5. Discharge from said treatment works at the location specified on the attached map into N1cKee Creek, a class C water in the Yadkin Pee -Dee River Basin. A- L �v I Liz) D M 672 t ZZil OWWO EA aw Facility Information Facility Latitude: 35015'32" Sub -Basin: 03-07-11 cation Lo % Longitude: 80"38'45" Ouad #: Harrisburg, F16SW Stream Class: C T Bradridd Famis Watcr Co./Ccntcx Hoincs Receivine Streant: McKee Creek NCOM4734 Permit -tied Flow: 0.46 & 0.70 1%,IGD IL Cabamis Countv A (1). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS - FINAL Permit No. NCO064734 _ During the period beginning on the effective date of the Kermit and lasting until expiration or expansion above 0.46 NIGU, the Permittee is authorized to discharge from outfall(s) serial number 001- Wastewater Treatment Plant Effluent. Such discharges shall be limited and monitored by the Permittee as specified below: EFFLUENT CHARACTERISTICS DISCHARGE LIMITATIONS MONITORING REQUIREMENTS Nlonthly Average Daily Maximum Measurement Frequency Sample Type Sample Location t Flow (N1GD) 0.46 Continuous Recording I or E BUD. , 20'C (April 1 - October 51) 9.0 mg/l. 15. i ntg/L Weeltly Composite l: B011-, 200C (November 1 - Nlarch 51) 18.0 111g/1. 27.0 ing/L \Veekly Composite Total Suspended Solids 50.0 mg/1_ 45.0 mg/1_ \Veehly Composite 1: NHj-N (April 1 - October J 1) 2.0 nig/L Weekly Composite E NH;,-N (November 1 - Nlarch 31) 4.0 mg/L \Veelcly Composite E Dissolved Oxygen Weekly Grab E. U. l) Fecal Coliform (geometric mean) 200/100 ml 400/100 ml \Veekly Grab E Total Residual Chlorine 2/\Veelt Grab 1: Temperature Daily Grab E Temperature Weekly Grab Lf, 1) 'Dotal Nitrogen (NO. +N0 j+T1\N) 01.1arterly Composite E "Dotal Phosphorus (quarterly Composite E PH' Grab 11 THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS. NOTES: t Sample Locations: l — Influent, E — Effluent. U — Upstream at Ieas( 100 feet above the outfall. 1) — Downstream at WSR 1169. 2 'l'he daily average dissolved oxygen concentration in the effluent shall not be less than 5.0 nig/1_. '' "fhe pl I shall not be Iem than 6.0 standard units not- treater than 9.0 standard units. A (2). EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS — FINAL Permit No. NCO064734 During the period beginning upon expansion to 0.70 N1GD and lasting until expiration, the I'ermittee is authorized to discharge from outfall(s) serial number 001- Wastewater Treatment Plant Effluent. Such discharges shall be limited and monitored by the I'ermittee as specified below: EFFLUENT CHARACTERISTICS DISCHARGE LIMITATIONS MONITORING 12EQUIREMENTS Monthly Average Daily Nlaximum Nleasurement Frequency Sample Type Sample Locations Flow (N1GD) 0.70 Continuous Recording I or E I OD,-, 200C (April 1 — October 51) 9.0 mg/1- 15.5 mg/L WeeItly Composite E 13OD. , 20°C (November 1 — March 51) 15.0 mg/L 27.0 mg/1. Weekly Composite E "Total Suspended Solids 50.0 mg/1- 45.0 mg/L \Veekly Composite L• NH--N (April 1 — October 31) 2.0 mg/l. Weekly Composite E NH,-,-N (November 1 — March 31) 4.0 mg/1. Weekly Composite E Dissolved Oxygen \Veeltly Grab E. Lf. 1) Fecal Coliform (geometric mean) 200/100 nil 400/100 ml Weekly Grab E Total Residual Chlorine 20 g/L 2AVeek Grab E Temperature Daily Grab E Temperature Weekly Grab U. D Total Nitrogen (NO,+NO;,+TKN) (quarterly Composite E Total Phosphorus (quarterly Composite E p1-1-, Weekly Grab E THERE SHALL BE NO DISCHARGE OF FLOATING SOLIDS OR VISIBLE FOAM IN OTHER THAN TRACE AMOUNTS. NOTES: t Sample Locations: I — Influent, E— Effluent, U — Upstream at least 100 feet above the outfall. 1) — Downstream at NUM 1169. 2 The daily average dissolved oxygen concentration in the effluent shall not be less than 5.0 mg/L. '5 The 1)11 shall not be less than 6.0 standard units nor greater than fi.0 stand,u•d units. DENR/DWQ FACT SHEET FOR NPDES PERMIT DEVELOPMENT NPDES No. NCO064754 Facility Information Applicant/Facility Name: Bradfield Farms Water Co. / Centex Homes Applicant Address: 5350 77 Center Road #100. Charlotte, NC 28217 Facility Address: Off of NCSR 2951, southeast of Pine Ridge Permitted Flow 0.23, 0.46 0 0.7 MGD Type of Waste: 100% Domestic Facility/Permit Status: Renewal County: Cabarrus Miscellaneous Receiving Stream: McKee Creek Regional Office: Mooresville Stream Classification: C USGS Topo Quad: Harrisburg, F165W 505(d) Listed?: No Permit Writer: Mark McIntire Subbasin: 03-07-11 Date: December 7, 1999 Drainage Area (mi2): 5.97 Summer7Q10(cfs) 0.17 Winter 7Q10 (cis): 0.54 Average Flow (cis): 16.3 SUMMARY OF FACILITY AND WASTELOAD ALLOCATION This permit is for a subdivision intended to be phased. The original permit was written with phased limits for flows of 0.23, 0.46, and 0.7 MGD. According to the Mooresville Regional Office. the existing facility has a treatment capacity of 0.46 MGD. 'The permit will be written with phased limits for flows of 0.46 and 0.7 NIGD. Limits for BOD are intended to protect the DO standard while the facility chose ammonia limits over toxicity testing for protection against whole effluent toxicity. These limits will be maintained in the renewal. TOXICITY TESTING: None Required COMPLIANCE SUMMARY: A review of the facility's compliance history indicates that treatment has been consistent and excellent. Effluent levels of BOD, ammonia. TSS, and fecal coliform are all quite low. The monthly average flow is consistently much less than the permitted Plow. INSTREAM MONITORING: The facility is currently required to monitor Fecal coliform, temperature, conductivity. and dissolved oxygen at one upstream and one downstream location. The requirement to monitor conductivity will be deleted with this renewal as conductivity monitoring is typically required where a high concentration of inorganic waste is present. This is unlikely to be the case with a 100% domestic, discharge. The receiving stream is not 303(d) listed. This fact combined with the results of a review of instream data suggests no need to continue instream fecal coliform monitoring. As such the instream monitoring requirement for fecal coliform will be deleted. PROPOSED CHANGES: • Effluent limitations pages For summer and winter will be consolidated onto a single page; • Instream monitoring for conductivity and fecal coliform will be deleted: and • Effluent limitations pages For the 0.23 MGD Flow will be deleted as the as -built capacity is 0.46 MGD. I;r.tdiirld I i .. 'A,rI SOC PRIORITY PROJECT If Yes, SOC No. Yes —No x To: Permits and Engineering Unit Water Quality Section Attention: Charles Weaver Date: May 25, 1999 NPDES STAFF REPORT AND RECOMMENDATION D1 l County: Cabarrus Permit No. NC0064734 Mpy 21 �9y9 PART I - GENERAL INFORMATION �cNR' WAucE BRAN% 1. Facility and Address: Bradfield Farms WWTP V Centex Homes 5301 77 Center Road # 100 Charlotte, NC 28217 2. Date of Investigation: May 13, 1999 3. Report Prepared By: Samar Bou-Ghazale, Environmental Eng. I 4. Persons Contacted and Telephone Number: D.C. Coffee; 704/721-3833 5. Directions to Site: From the junction of Robinson Church Road (S.R. 1168) and peach Orchard Road (S.R. 1169) in southwestern Cabarrus County, travel southeast on S.R. 1169 approximately 1.5 miles and turn right on John Bostar lane (S.R. 2951). Travel approximately 0.4 mile on S.R. 2951 and turn right onto a gravel access road. The wastewater treatment plant is located at the end of this road. 6. Discharge Point(s). List for all discharge points: Latitude: 35°15'32" Longitude: 80°38'45" Attach a U.S.G.S. map extract and indicate treatment facility site and discharge point on map. U.S.G.S. Quad No.: F 16 SW U.S.G.S. Name: Harrisburg, N.C. 7. Site size and expansion are consistent with application? Yes x No If No, explain: 8. Topography (relationship to flood plain included): Rolling 3-12% slopes. The site is not located in a flood plain area. 9. Location of nearest dwelling: None within 500 feet. This office has recommended that no dwellings be located closer than 200 feet from the wastewater facility. 10. Receiving stream or affected surface waters: Mckee Creek a. Classification: C b. River Basin and Subbasin No.: Yadkin; 030711 C. Describe receiving stream features and pertinent downstream uses: The receiving stream was approximately 10 feet wide and 2 to 4 feet deep at the time of investigation. Stream channel was well defined and no detrimental effects were observed as a result of the discharge. General C classification uses downstream. PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. a. Volume of wastewater to be permitted: (phases) , 0.460 and 0.700 MGD (Ultimate Design Capacity) b. What is the current permitted capacity of the wastewater treatment facility? 0.460 MGD C. Actual treatment capacity of the current facility (current design capacity)? 0.460 MGD d. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two years: N/A e. Please provide a description of existing or substantially constructed wastewater treatment facilities: The existing wastewater treatment facilities consist of an influent lift station, influent bar screen/flow splitter box, and two identical WWTPs; each plant consists of a surge tank, Page 2 an aeration basin, a secondary clarifier, an aerated sludge holding tank, an effluent flow recorder and totalizer, a gas chlorinator and contact tank, a traveling bridge tertiary filter, and a post aeration tank. f. Please provide a description of proposed wastewater treatment facilities: N/A g. Possible toxic impacts to surface waters: None at this time. h. Pretreatment Program (POTWs only): N/A 2. Residuals handling and utilization/disposal scheme: N/A a. Other disposal/utilization scheme (specify): Sludge is pumped by Piedmont Septic Services and disposed at the City of Concord's Rocky River Wastewater Treatment Plant. 3. Treatment plant classification (attach completed rating sheet) : Class II 4. SIC Code (s) : 4952 Wastewater Code(s) of actual wastewater, not particular facilities, i.e., non -contact cooling water discharge from a metal plating company would be 14, not 56. Primary: 05 Secondary: Main Treatment Unit Code: PART III - OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grant Funds or are any public monies involved (municipals only)? N/A 2. Special monitoring or limitations (including toxicity) requests: None at this time. 3. Important SOC, JOC or Compliance Schedule dates: (please indicate) N/A Page 3 4. Alternative Analysis Evaluation: Has the facility evaluated all of the non -discharge options available? The applicant was not required to submit alternative analysis evaluation since the facility is not in substantial non-compliance with the terms and conditions of the NPDES permit. Please provide regional perspective for each option evaluated: N/A Spray Irrigation: N/A Subsurface: N/A Connection to Regional Sewer System: No regional sewer system is available in the vicinity. 5. Air Quality and/or Groundwater concerns or hazardous materials utilized at this facility that may impact water quality, air quality, or groundwater: No AQ or GW concerns nor are hazardous materials utilized at this facility with the exception of chlorine. 6. Other Special Items: N/A PART IV - EVALUATION AND RECOMMENDATIONS John Crosland Co., is applying for the renewal of its permit for the operation of a wastewater treatment facility at Bradfield Farms Subdivision. The phase II expansion of 0.23 MGD was completed in 1995. The total design capacity of the facility is 0.460 MGD. At the present time approximately 750 homes are connected to the wastewater treatment plant. It is recommended the subject permit be reissued. 'Signature of Resort Preparer S�2 Date Page 4 Wednesday, January 6, 1999 change of address Page: 1 Subject: change of address Date: Wed, 6 Jan 1999 10:25:36 -0400 From: "hove, Linda L." <L.inda Love@mrn.enr.state.nc.us> Organization: NC DENR - Mooresville To: "Robert Farmer" <robert famier@b2o.enr.state.nc.us> Robert, Happy New Year Mr Randol Tilghman, permittee for John Crosland Co., Brandfield Farms, Permit No. NC0064734, Cabarrus County has a new address. It is as follows: Centex Homes 5350 77 Center Road #100 Charlotte, NC 28217 Richard is out sick this week so I thought I'd go ahead and let you know so you can change it on SIPS. THANK GOODNESS THE DMRS are coming in finally for poplar trails and oak haven ! ! ! Linda Love a Re / -11f /Vo� AA Mail box://h2 o. enr.state.n c. us 7fetch> UID>/INBOX>1251 March 3, 1999 Mr. Charles H. Weaver, Jr. NC DENR / DWQ / NPDES P.O. Box 29535 Raleigh, North Carolina 27626-053 5 RE: Bradfield Farms Community WWTP NPDES NC0064734 Permit Renewal Application Dear Mr. Weaver: Please accept this letter as a request for permit renewal for the above referenced facility. The Phase II, .230 MGD expansion was completed in the spring of 1995. This expansion duplicated the existing .230 MGD facility. Sludge generated at this facility is collected by vacuum truck and is disposed of at the Rocky River Regional Wastewater Treatment Plant, Concord, N.C. Mr. Weaver, I trust this renewal package is sufficient, however, should you require any additional information please contact me at (704) 522-4528. Sincerely I C)l Tilghman Centex Homes w NORTH CAROLINA CABARRUSCOUNTY PUBLIC NOTICE STATE OF NORTH CAROLINA ENVIRONMENTAL. MANAGEMENT COMMISSION/NPDES UNIT 1617 t,IAIL SERVICE CENTER RAI-EIGH, NC 27699 1617 NOTIFICATION OF INTENT TO ISSUE A NPDES WASTEWATER PERMIT On the basis of thorough staftreview and application of NO General Statute 143,21. Public law 92-50C and other OwNI standards and regulations, the North Carolina Environmental Madagemere Commission proposes to issue. a National Pollutant Discharge Elimination System (NPDES) wastewater discharge permit to the person(s) listed on Inc .lashed pages effective 45 days from the publish date of this;noffce. Written comments regarding the ; proposedpermit will be accepted until 30 days after the publish date of this notice. All comments received prior to that date are considered in the final denominators, regarding the proposed permit. The Director of the NO Division of Water gualiy may decide to hold a public meeting. for .the proposed permit should the D,vision receive a significant degree of public interest The Independent Tribune, Inc. Copies of the draft permit and other supporting information on file used to determine conditions present In the draft permit are avallabte upon request and payment of the costs of reproduction. Mail comments and/or requests for information to the NO Division of Water Quality at the above address or call Ms. Christie Jackson et (919) 733�5083, extension 539. Please include the NPDES permit number (attached) in any communication. Interested persons may also visit the DlVislan of Water Quality at 512 N. Salisbury Street, Raleigh,. NO 27604-1148 between the hours o1 6:00 a.m. and 5'.00 p.mto review information on file.o - H Number Cabarets is . Odell Elementary School, P.O. Box 388,'Concord, NO 26026has applied for a permit renewal Jar a facility located In Cabarrus County discharging treated wastewater into an unnamed tributary to the Rocky River In the Yadkin - Pee Dee River Basin. Currently ammonia and dissolved oxygen are water quality limited. This discharge may enact future allocations in this potion of the receiving stream. Number Cabarrus nSySchoals - PAt. Pleasant High School. P.O. Box 368,:Cancortl, NC 28026 has applled for a permit renewal far a facility located in Cabarrus County discharging treated wastewater.' into Ads" Greek In.Ine Yadkin Pee Dee River Basin. Currently no parameters are water quality ilmiled, This discharge may affectfuture allocations in this portion Of the receiving stream.. mlt Number Joelyy,JoeFam entex Hanes, 5350 77 Center Road', F100, Charlotte, NO 28217 has applied for a permit. renewal for a facility located ,n Cabarrus County discharging treated v: sidewise, into McKee Greek In the Yadkin Pee Dee River Basin. Currently BOD, ammonia, and dl,i so oxygen are water quality limited. This discharge may affect future allocations in tall Paden of the receiving stream. NWt Number Older Park "'Q, 10652 Peach Orchard Rd., Harrisburg , NO 28075 has applied for a permit renewal for a facility located In Cabarrus County discharging treated Wastewater into Reedy Creek in the Yadkln.Pee Dee River Basin. Currently ammonia are water quality limited. This discharge may affect future allocations in this potion of the receiving stream. C On this, the day of C u 19 _q of THE INDEPENDENT Ti Inc., after being duly sworn, says that the annexed advertisement was duly inserted in the paper on the following dates: and was published therein once a week for weeks. weeks. The total cost of this dvertisement $�j ' `" Subscribed and sworn to the day above first mentioned. . a . My Commission Expires f Number ahollna Water iS`IIPc +Cabarrus Woods N"1P.O. BOX 240908, Charlotte. 0 28224 has applieda0acilily tot a. permit renewal ffor a llocated in Cabarru$ County discharging treated Branch Into Gmzire ithe Yadkin -Pee Dee River Basin. Currently no paraineem, are water quality mired. This discharge may affectn tunthe e alltio receiv nl nortioog 1 Number Cabarrus SS" dots - Bethel Elementary School, P.O. Box 386. Concord NO 28026 has applled for a permil renewal for_.z .facility located in Cabarrus County discharging treated wastewater into an unnamed tributary to Muddy Crook In the Yadkin Pee Dee River Basin. Currently ammonia and decoked Oxygen are water, quality limited. This discharge may affect future allocations in this Panic, of the. receiving. stream. NO. 853 Dec. 15, 1999 r SOC PRIORITY PROJECT; Yes No x 1 If Yes, SOC No j J �y To: Permits and Engineering Unit Water Quality Section , Attention: Susan Robson `BAR 2 2 4.. Date: March 21, 1994 .tiei�i.cst:. a NPDES STAFF REPORT AND RECOMMEND.TION County: Cabarrus Permit No. NC0064734 PART I - GENERAL INFORMATION 1. Facility and Address: Bradfield Farms WWTP John Crosland Company P.O. Box 11231 Charlotte, NC 28220 2. Date of Investigation: March 15, 1994 3. Report Prepared By: Samar Bou-Ghazale, Environmental Eng. I 4. Persons Contacted and Telephone Number: Bill Yandell; 704/522-4528 5. Directions to Site: From the junction of Robinson Church Road (S.R. 1168 ) and peach Orchard Road (S.R. 1169 ) in southwestern Cabarrus County, travel southeast on S.R. 1169 approximately 1.5 miles and turn right on John Bostar lane (S.R. 2951). Travel approximately 0.4 mile on S.R. 2951 and turn right onto a gravel access road. The wastewater treatment plant is located at the end of this road. 6. Discharge Point(s). List for all discharge points: Latitude: 35015'32" Longitude:.80038145" Attach a U.S.G.S. map extract and indicate treatment facility site and discharge point on map. U.S.G.S. Quad No.: F 16 SW U.S.G.S. Name: Harrisburg, N.C. 7. Site size and expansion are consistent with application? Yes x No If No, explain: 8. Topography (relationship to flood plain included): Rolling 3- 12% slopes. The site is not located in a flood plain area. 9. Location of nearest dwelling: None within 500 feet. This office has recommended that no dwellings be located closer than 200 feet from the wastewater facility. 10. Receiving stream or affected surface waters: Mckee Creek a. Classification: C b. River Basin and Subbasin No.: Yadkin; 030711 C. Describe receiving stream features and pertinent downstream uses: The receiving stream was approximately 10 feet wide and 2 to 4 feet deep at the time of investigation. Stream channel was well defined and no detrimental effects were observed as a result of the discharge. There are no known users downstream. PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. a. Volume of wastewater to be permitted: (phases) 0.230, 0.460.and 0.700 MGD (Ultimate Design Capacity) b. What is the current permitted capacity of the wastewater treatment facility? 0.230 MGD C. Actual treatment capacity of the current facility (current design capacity)? 0.230 MGD d. Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two years: N/A e. Please provide a description of existing or substantially constructed wastewater treatment facilities: The existing wastewater treatment facilities consist of an influent lift station, influent bar screen/flow splitter box, a surge tank, an aeration basin, a secondary clarifier, an aerated sludge holding tank, effluent flow recorder and totalizer, a gas chlorinator and contact tank, a traveling bridge tertiary filter, and a post aeration tank. f. Please provide a description of proposed wastewater treatment facilities: N/A g. Possible toxic impacts to surface waters: None at this time. NPDES Permit Staff Report Version 10/92 Page 2 h. Pretreatment Program (POTWs only): N/A 2. Residuals handling and utilization/disposal scheme: N/A a. Other disposal/utilization scheme (specify): Sludge is pumped by Roto-Rooter and disposed at the City of Concord's Rocky River Wastewater Treatment Plant. 3. Treatment plant classification (attach completed rating sheet) : 4. SIC Code(s): 4952 Wastewater Code(s) of actual wastewater, not particular facilities, i.e., non -contact cooling water discharge from a metal plating company would be 14, not 56. Primary: 05 Secondary: Main Treatment Unit Code: PART III - OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grant Funds or are any public monies involved (municipals only)? N/A 2. Special monitoring or limitations (including toxicity) requests: None at this time. 3. Important SOC, JOC or Compliance Schedule dates: (please indicate) N/A 4. Alternative Analysis Evaluation: Has the facility evaluated all of the non -discharge options available. Please provide regional perspective for each option evaluated. Spray Irrigation: The available space is limited for such activity. Connection to Regional Sewer System: No sewer line in the vicinity. Subsurface: N/A Other Disposal Options: N/A 5. Air Quality and/or Groundwater concerns or hazardous materials NPDES Permit Staff Report Version 10/92 Page 3 a utilized at this facility that may impact water quality, air quality, or groundwater: No AQ or GW concerns nor are hazardous materials utilized at this facility. 6. Other Special Items: N/A PART IV - EVALUATION AND RECOMMENDATIONS John Crosland Co., is applying for the renewal of its permit for the operation of a wastewater treatment facility at Bradfield Farms Subdivision. The existing facility is the first of three phases which will be added as hydraulic capacity is needed. An Authorization to Construct the second phase has been submitted and, according to Mr. Bill Yandell with Crosland Homes, the second phase construction of an additional 0.230 MGD will begin in the Fall of 1994. At the present time approximately 350 homes are connected to the wastewater treatment plant, and the average flow of 0.0798 MGD for 1993 (as reported in the DMR) from this facility is well below the current permitted flow. It is recommended the subject permit be reissued. CZ' 6&k- Signature of Rep t Preparer Water Quality ReglAnal Supervisor I Date NPDES Permit Staff Report Version 10/92 Page 4