Loading...
HomeMy WebLinkAboutWetland Impact Summary Table M-0540_revised 20230526Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 3 Rock Sill 0.37 Oyster Structure 0.09 Fill 0.22 0.48 TOTALS*:0.22 0.00 0.00 0.00 0.00 0.94 0.00 0 0 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 18 OF 18 1.OYSTER STRUCTURES TO BE HAND PLACED WITHOUT THE USE OF HEAVY MACHINERY TO MINIMIZE IMPACTS TO THE EXISTING ENVIRONMENT. 2.ALL PROPOSED STABILIZATION WORK ON EMBANKMENT TO BE COMPLETED FROM THE NC-24 RIGHT-OF-WAY TO MINIMIZE IMPACTS TO THE EXISTING ENVIRONMENT. 3.ACCESS FOR CONSTRUCTION OF THE PROPOSED LIVING SILL AND TIDAL LOW MARSH TO UTILIZE A TEMPORARY TRESTLE BRIDGE IN AN EFFORT TO MINIMIZE IMPACTS TO THE EXISTING ENVIRONMENT. 4.5/26/2023: PERMANENT SW IMPACTS FOR OYSTER STRUCTURE REVISED FROM 0.10 TO 0.09 (3900 SQUARE FEET) DUE TO CHANGES IN THE OYSTER STRUCTURE LAYOUT. WETLAND AND SURACE WATER IMPACTS SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 4/27/2021 Revised 5/26/2023 CARTERET/ONSLOW M-0540A WBS 49083.3.1 Submitted 4/11/2022