HomeMy WebLinkAbout20130918 Ver 5_June 17 Inspection_20150619Wetland Inspection Report
Project Num: 20130918 Version: 5
Project Name: NCDOT- Greensboro Eastern L�
County: Guilford
Location: NCDOT- Greensboro Eastern Loop (U-2525 B& C)
Latitude: +36° 07'
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 6/17/2015
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Overall, the project is in good shape.
Title:
❑ Not Compliant
Status: Issued
Project Type: New Road/Highway
Region: Winston-Salem
Longitude: -79° 42' 43"
Phone:
Phone: 336-776-9703 Ext.3
page: 1
Site Number: 20130918
Inspection Date: 6/17/2015
Owner: Thorpe, Gregory
Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑
Are the culverts and/or filled areas installed properly? �❑❑❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑
Comment: We inspected Sites 3, 10, Mitiaation Site 2 and a repaired/modified sediment basin. Box culvert at Site 3
was backfilled and readv to turn water into it. Site 10 has some aliqnment issues. DOT is considerinq
options of core fiber mattinp or riprap at will qet back to us. Mitiqation Site 2 culvert was in process of
tvinq back to new channel. Sediment basin near Buffalo Creek was stabilized and refitted to allow diffuse
discharqe over stream bank.
page: 2