Loading...
HomeMy WebLinkAboutNCG210344_Inspection Report_20230510ROY COOPER Governor ELISABETH BISER Secretary DOUGLAS ANSEL Interim Director �v NORTH CAROLINA Environmental Quality May 10, 2023 UFP Mid -Atlantic LLC Attention: Joe Mark, Regulatory Compliance Administrator 141 Knobbs Creek Drive Elizabeth City, NC 27909 UFP Industries, Inc. Attention: Joe Mark, Regulatory Compliance Administrator 2801 East Beltline Ave. NE Grand Rapids, MI 49525 Subject: Compliance Evaluation Inspection UFP Mid -Atlantic LLC - Liberty NPDES Certificate of Coverage — NCG210344 Randolph County, North Carolina Dear Mr. Mark: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Project/Site on Date. Please note that in the stormwater inspection report summary we ask that you continue to implement the Stormwater Pollution Prevention Plan (SPPP). The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact Lily Kay at (336) 776-9655 or by E-mail at lily.kay@ncdenr.gov. Sincerely, r Tamera Eplin, OE Regional Engineer Land Quality Section Enclosure c: Laserfiche North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Winston-Salem Regional Office 1 450 W Hanes Mill Road, Suite 3001 Winston-Salem, North Carolina 27105 336-776-9800 far Compliance Inspection Report Permit: NCG210344 SOC: County: Randolph Region: Winston-Salem Contact Person: Joe Mark Directions to Facility: Effective: 08/01/18 Expiration: 07/31/23 Owner : Ufp Mid -Atlantic LLC Effective: Expiration: Facility: UFP Mid -Atlantic, LLC 6985 Kenrow Rd System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 05/04/2023 Primary Inspector: Lily C Kay Secondary Inspector(s): Title: Entry Time 01:OOPM Certification: Liberty NC 27298 Phone: 616-365-1591 Phone: Exit Time: 01:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG210344 Owner - Facility: Ufp Mid -Atlantic LLC Inspection Date: 05/04/2023 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete including employee training and site inspection records. The outlets were beyond the perimeter fence and had overgrowth of vegetation, but the facility yard that drains to these outlets was well operated and maintained. If you have questions, contact me at Lily.Kay@ncdenr.gov or by phone at (336) 776-9655. Page 2 of 3 Permit: NCG210344 Owner - Facility: Ufp Mid -Atlantic LLC Inspection Date: 05/04/2023 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? N ❑ ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) and related documentation was complete including employee training and site inspection records. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Qualitative monitoring records were available and complete. Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ E ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ M ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ 0 ❑ Comment: The outlets were beyond the perimeter fence and had overgrowth of vegetation, but the facility yard that drains to these outlets was well operated and maintained. Page 3 of 3