Loading...
HomeMy WebLinkAbout20140090 Ver 2_EC Measure Notification_20150619Wanucha, Dave From: Sent: To: Cc: Subject: Attachments: Euliss, Amy Friday, June 19, 2015 11:05 AM Wanucha, Dave Suggs, Phillip H; Guy, Jeremy M; Archer Sr, Wright; Panek, Lindsey F U2579B WS Beltway report.ashx-6.pdf Dave, I wanted to notify you of an issue we are having on the WS Beltway. The Erosion Control plan for the Borrow site calls for two sediment basins with a riser pipes, due to the large drainage area the basin is receiving. Despite direction from DOT to wait until the basin is completed per plan, the contractor directed crews to begin grubbing yesterday, leaving the area inadequately protected. Upon discovery, DOT personnel directed the contractor on temporary preventative erosion control measures, until the necessary parts for the riser arrive (approx. mid-week next week). We don't have any sediment losses at this time; however, we wanted to make you aware of our issues and what is being done to address them. I've attached a copy of Phil's report after our project personnel requested his assistance. I'll let you know when the area is brought into compliance with the Erosion Control plan. Amy Euliss NCDOT Division 9 Environmental Officer 375 Silas Creek Parkway Winston Salem, NC 27127 336-747-7802 (work) I rr�7all �:urrc,�l�ui�dci��;e, �C�u ai�d ��rurr�7 �U°ii� �e,i�dcr i� �ul�j��;� �u �C�h°ie, I"J � I�'�"ul�li�; I ta�:ur�:;� I..aw ai�d ir�7ay I�c rli��;lu�e,rl �u �C�h°ih�rl I�artie,�,