Loading...
HomeMy WebLinkAboutNCG140030_Inspection Report_20221220ROY COOPER Governor t•'jj'lR;�i` ELISABETH BISER = " Secretary DOUGLAS ANSEL Interim Director NORTH CAROLINA .Environmental Quality December 20, 2022 Loflin Concrete Co Inc Attention: Chad Loflin 2105 Pisgah Church Rd. Kernersville, NC 27284 Subject: Compliance Evaluation Inspection Loflin Concrete Co Inc NPDES Certificate of Coverage — NCG140030 Forsyth County, North Carolina Dear Mr. Loflin,- Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Loflin Concrete facility on Old Hollow Rd. on December 7, 2022. Please note that in the stormwater inspection report summary we ask that you submit an updated Stormwater Pollution Prevention Plan (SPPP) to the Winston-Salem regional office by February 10, 2022. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at lily.kay@ncdenr.gov. Sincerely, r� Tamera Epli , PE Regional Engineer Land Quality Section Enclosure c: Laserfiche .. North Carolina Department of Environmental Quality I Division of Energy, Mineral, and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 27105 jgfDE 336-776-9800 Compliance Inspection Report Permit: NCG140030 Effective: 07/01/22 Expiration: 06/30/27 Owner : Loflin Concrete Co Inc SOC: Effective: Expiration: Facility: Loflin Concrete Co Incorporated County: Forsyth 4880 Old Hollow Rd Region: Winston-Salem Kernersville NC 27284 Contact Person: Chad Loflin Title: Phone: 336-993-2432 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/07/2022 Primary Inspector: Lily C Kay Secondary Inspector(s): Certification: Phone: Entry Time 11:45AM Exit Time: 12:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG140030 Owner - Facility: Loflin Concrete Co Inc Inspection Date: 12/07/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: The facility was well operated and maintained with good housekeeping and minimal outside storage. The analytical samples should be taken near the fence to include the discharge from the settling ponds. An updated Stormwater Pollution Prevention Plan must be submitted to the Winston-Salem regional office by February 10, 2023. If you have questions, contact me at Lily.Kay@ncdenr.gov or by phone at (336) 776-9655. Page 2 of 3 Permit: NCG140030 Owner - Facility: Loflin Concrete Co Inc Inspection Date: 12/07/2022 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? E ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) has been developed but has not been updated. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Qualitative monitoring records were available and complete. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? E ❑ 1111 Comment: Analytical monitoring records were available and complete. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? N ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ N ❑ ❑ Comment: The facility has one outlet that other businesses upstream could contribute stormwater and pollutants to the facility's discharge. One exceedance of TSS was observed at the time of inspection. Be advised that any exceedance requires a teir response detailed in the permit. Page 3 of 3