HomeMy WebLinkAbout20141226 Ver 1_Site Inspection June 17_20150619Wetland Inspection Report
Project Num: 20141226
Project Name: NCDOT- I-73 ( I-5110)
County: Guilford
Location: NCDOT- I-73 ( I-5110)
Latitude: +36° 07'
SW Plan Location
Site Owner Name NC DOT PDEA
Inspection Date: 6/17/2015
Reason for Inspection Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person:
On-Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: � Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
� Permit (401 WQC)
Inspection Summary:
Version: 1 Status: Issued
Project Type: Other
Region: Winston-Salem
Title:
❑ Not Compliant
Longitude: -79° 57' 08"
Phone:
Phone: 336-776-9703 Ext.3
Overall the project looked good. A slope drain elevation was noted at Site 2 to be too high to drain storm water offsite.
This was pointed out to the contractor and was to be adjusted. A follow-up inspection will be conducted at a later date.
page: 1
Site Number: 20141226
Inspection Date: 6/17/2015
Owner: Thorpe, Gregory
Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑
Are the culverts and/or filled areas installed properly? �❑❑❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑
Comment: Sites 1 and 2 were reviewed. Culverts and riprap were in place and appeared to be installed correctiv. No
work has been conducted on other permit sites. We inspected a pipe connection unrelated to a permit
site but was connectinq to a iurisdictional stream as disscussed durinq merqer meetinqs. The pipe
connection to an existinq box culvert under Brvan Blvd looked aood.