Loading...
HomeMy WebLinkAboutNCC231613_ESC Approval Submitted_20230526 ROY COOPER Governor ,y t ELIZABETH BISER Secretary DOUGLAS ANSEL Interim Director NORTH CAROLINA Environmental Quality March 16, 2023 LETTER OF APPROVAL WITH MODIFICATIONS WJH LLC Attention: Dave Hodgman, Regional President 3091 Governors Lake Drive Ste 300 Norcross, GA 30071 RE: Project Name: Charleston Ridge Lot EC Plan Acres Approved: 8.23 Project ID: DAVIE-2023-015 County: Davie City: Mocksville Address: Charleston Ridge Drive River Basin: Yadkin Stream Classification: C Submitted By: Summey Engineering Associates, PLLC Date Received by LQS: March 15, 2023 Plan Type: Revised Dear Mr. Hodgman: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The modifications required for approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG010000 permit require that the following documentation be kept on file at the job site: D_E North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105 336-776-9800 am` /. Letter of Approval with Modifications WJH LLC March 16, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Charleston Ridge Lot EC Plan Project ID: DAVIE-2023-015 County: Davie Modifications pursuant to applicable North Carolina General Statutes and/or Regulations: 1. Please change the temporary seeding to the recommended Piedmont Region specifications. 2. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] 3. The NCGO 1 has a $100 yearly fee and our office often receives closure inspection requests days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of Termination (NOT) to terminate NCGO1 coverage. The closure inspection should not be requested until after the site has achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General Comment] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities n A: A: i *1 /-0 co 77 o rD co -gl, . vs - AD� ` ¢• a. e b !1 p n p coe.p. r V -"I N 'O pro) CS eq- p 0 vs 1:$ 0 r, sr' cl, ),I P1A- 0 A; ° i'l. :ri © 2:j 6 CD .. „. It ow 01' p eo, CD H e* o l 1 d fo. z___ cl z: - 0:, 2 rA 11-• cD V1 IMI • 4 ' 1. ADE '., o '� ^, ��1 ;1 -:: .. ,.,, urn 1 11 O rq f J 4. i 1 : '11F7) ''.'1 • It p rn w �+ I C" P NI bd 1 C p r 0 0-1 r5o 0 b r 0 S. J J Li- col cri D • p 0 c ici v' O lei C. y itO1.0 ,p- E.. w 01 " CDp W p o. PZ C no el: R r."-i. : r+- Irt- C• " vi p� vi © o g FiLlf p _ _ p 14 E. * iv p C :r' sa 0 , IV p 0