Loading...
HomeMy WebLinkAboutMay inspectionWetland Inspection Report Project Num: 20211283 Version: 2 Status: Issued Project Name: TPB NCDOT - Replace Bridge 5 on SR 1133 Project Type: Replace bridge with bridge County: Alleghany Region: Winston-Salem Location: TPB NCDOT - Replace Bridge 5 on SR 1133 Latitude• +360 27' 40" Longitude: -81' 08' 38" SW Plan Location: Site Owner Name: NC DOT Division 11 Inspection Date: 5/25/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: page 1 Site Number: 20211283 Owner: Wood, Jamie Inspection Date: 5/25/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I met with Tim Ashley (DOT contractor) at the site. Culvert and new bridge were constructed per the plans. Final grading and bank stabilization was underway. page 2