Loading...
HomeMy WebLinkAbout20230732 Ver 1_Site Plan_20230525 (2) CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Contractor/agent:, __20_ Print Sipure The approval Is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule.Site specific work should be provided in the application. (15A NCAC Trees are not allowed to be removed from Zone 1 of the Buffer(within 30 ft of the full pond elevation), unless approved. Exception,those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed, [154NCACO28.O243(6)] Benching,grading in the buffer|s not allowed, Excessive disturbance uf ground cover. [15ANCACOJ8.8243 (6)] Beachea,inoperviouspatios,innpenviuusvva|kmeys,etc.ananoritaUowedinthebufferun}essspecifica}|Vapproved by the Division. There are limitation on size for decks. [15ANCACOZB.OI43(4)and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described.The approved access corridor shall be restored. Staging, spoil,construction material must bm outside the buffer, [l5A0CACD2H.O50Z and 15AN[ACO28.O243(4), (5), (0)] Stonnwater cannot be piped or channeled for direct discharge to the lake All constructed sturmvvmter discharges must beat the natural elevation and discharged prior toentering the buffer directed ay diffuse mr sheet flow ot non-erosive velocities to the lake. [IEANCACO2B .024](5)' (6)] Acknowledgement ofNotification 4i. |' _~hereby state that| have been informed of the Catawba Riparian Buffer Rule. Aovy work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Rcmour (DVVN) is i !ad d subject to enforzement. DuedUi8enoewU/be taken such that the consrrucccompliance and intent of the 4U1Water Quality Certification anumvn d spec0catiun(o)'and other supporting materials.