HomeMy WebLinkAbout20230731 Ver 1_Site Plan_20230525 Lake
(At Full Pond/Normal Water Level!
3 '
N�,� h��r' Ch�n�e► c u-�
9 5 4y.75' 50
I 50,
Pull Pond`
Normal Water Level
horelin
t�1e�c�411a�c'�
10 ►�o 's�ree5 r e M0 Ved
Loi u,�cte i�o divr anC-e—
c
S house.
5 ,
i
i
i5
Please approximately sketch the following information on this plan, lengti� ® sG�orel6ne
(provide dimensions for each item,such os 10 ft x 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ formal Water Level elevation
6. Location of construction access corridors
RO-Ce-55 +Incou31, ne�c ILr'S 10A-
C h LnneA w`, I I -k e Clan n d
FORM:SSGP 10-2013 Page 3 of 3