Loading...
HomeMy WebLinkAbout20230728 Ver 1_Silt fence and road_20230523 EROSION CONTROL OPTIONS FOR LOT CONSTRUCTION The Soil Erosion and Sedimentation Control Oidinancu requires that nnyunu conducting a land-disturbing activity prevent sediment from leaving the disturbed site Furthermore,conducting any land-disturbing activity consisting of one acre or more requires a permit before beginning the disturbance This includes disturbance of multiple lots totaling one acre or more,regardless of proximity to each other within a subdivision,in cases where fill material is stockpiled,needed,or wasted,the area where this material is stored,coming from,or going to,must be included In the total area of disturbance EjQzjQn ontrol measures must be Installed prior to any rg adln oQ r construction on site and maintained correctly to funclion propeily The angle—for rp a o o s os an J toll be no rg ea erg Dian the angl w r e ch can 3 retain -bnegelalN over or o tern aquae erosion control devices or structures In any event slopes fell exposed will i endar days of completion of any phase of grading,whichever period is shorter,be planted or of erwls provided with temporary or permanen remit cover—,devices,orslruclures a Ir MCiOM1 s re ro ion Please refer to the CErosion g and Design Munupl for specific guidance as it relates to installation and maintenance The site shall be inspected for maintenance needs weekly and after each storm event,whichever is sooner. SEDIMENTATION AND EROSION CONTROL OPTIONS L INSTRUCTIONS:IDENTIFY ONE OR ANY COMBINATION OF LETTERS FROM THE SEDIMENT CONTROL E SKETCHES BELOW THAT BEST DESCRIBES THE EROSION CONTROL MEASURES THAT WILL BE USED G DURING CONSTRUCTION. E Construction Sequence: N Silt Fence: 1. Install construction oiltranco D 2. Install slit fence Construction Entrance: ® 3. Rough grade site,construct building(s) 4. Install temporary or permanent groundcover within 21 days ' Direction of Flow 6. Final o and stabilize site 6.Removee erosion control measures after site has been Inspected for compliance by the Department of Utilities&Engineering. Flow to the Rear Flow to the Front Flow to the Left Flow to the Right E OPTION A OPTION B OPTION C OPTION D R S S I O N HOUSE HOUSE HOUSE HOUSE C N T R Flow to the Front&Rear Flow to the Left&Right O OPTION E OPTION F EXAMPLE L C� O Combination P HOUSE HOUSE HOUSE C&E T I N S Construction Examples Spacing of metal tee post with fabric shall be max.of 6'without wire fence Spacing of metal tee post with fabric and wire fence shall be max.8' a � 50' ,y 'j•,,� •��,'ir i•minimum 6" minimum �}k•, Direction 94_ _ of flow Crusher Run I, Gravel If wetness is a problem geotextile fabric will 36"fabric buried 12 inches in a 4"wide x 8"deep trench be required and backfilled with compacted soil irev,fed 1124 2021 page 4