Loading...
HomeMy WebLinkAbout20230728 Ver 1_Riparian Buffer Authorization Request_20230523Original Submittal 5/23/2023 A. Owner/Applicant Information General Information Q .......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... Primary Contact Email: * ray@accupainter.com Please list the contact person's email for questions or payment on this project if needed. Who is submitting the application?* 0 Owner O Applicant other than Owner O Agent Is there an agent working on this application but Yes not submitting it? No 1. Property Owner Information: ............................................................................................................. 1a. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1 d. Telephone:* 9193766025 Steven O and Rocio G . Ayscue (for Corporations) Street Address 201 Southern Style Drive Address Line 2 City State / Province / Region Holly Springs NC Postal / Zip Code Country 27540 United States B. Project Information and Prior Project History 1. Project Information le. Email Address:* ray@accupainter.com 1 a. Name of Project: * Ayscue Lake House (Subdivision, facility, or establishment name) 1b. Is this a publicly -funded transportation project?* Yes No 1d. Subdivision Name: North Bay at Doe Run Subdivision le. Nearest Municipality: Hickory 1f. Property Size: 0.75 acres 1 g. County (or Counties) where the project is located:* Caldwell 1h. Property ID# Date of Purchase 08116-2154 3/17/2021 Tax PIN or Parcel id 11. Deed Information Type of Book Book#11 Page# Deed 1847 313 Map 18 18 1 j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach document Ayscue Plat book 396.21 KB -2023_05_22_09_54_0460373198_231513.pdf PDF only 1k. How would you like to provide the Latitude and Longitude information? Address Lookup Manually Latitude* 35.786650 Longitude*-81.468210 11. Is the project located in any of North Carolina's twenty coastal counties?* Yes No 2. Surface Waters 1 .......................................................................................................................................................................................................................................................................................................................................................................................................................................... 2a. Name of the nearest body of water to proposed project: * Rhodhiss 2b. Water Quality Classification of nearest receiving water: Lake 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 99 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Empty lot with vegetation in an established neighborhood 3b. Attach an 8'/z x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach document GaiaGPS-2023-05-11 TOO _01_37.pdf 5.24MB PDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach document SoilMap.pdf PDF only R WIRI.17 4. Proposed Activity (� Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: Cut some trees to enhance the view within the Buffer zone, stumps will no be remove and will be grind. Clear some vegetation at the lot to build a house, garage and entrance. Also a Septic system. The lot has water and electricity service. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach document Trees Before-After.pdf 438.52KB PDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* Yes No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No 7. Future Project Plans 7a. Is this project a phased project?* Yes No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* Neuse River Basin (15A NCAC 02B.0233) Catawba River Basin (15A NCAC 02B.0243) Randleman Lake Watershed (15A NCAC 02B.0250) Tar -Pamlico River Basin (15A NCAC 02B.0259) Jordan Lake Watershed (15A NCAC 02B.0267) Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason I Stream Name t* Buffer ImpacImpact Type Zone 1 Zone 2 71 Clear some trees in Zone I Rhodhiss Temporary (T) Exempt 2,970.00 1,980.00 Map label (e.g. Road Crossing 1) Perm or Temp Square Feet Square Feet Total Zone 1 Impacts: 2,970.00 Total Zone 2 Impacts: 1,980.00 Total Buffer Impacts: 4,950.00 Comments: Stumps wont be removed, will be grind in Zone I. A revegetation of the Buffer Zone will follow: grass seeding with mulching and grass seed mat for sloped areas as require. D. Impact Justification and Mitigation I 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project. There are no structures within the Buffer Zone. We are keeping some existing trees. Minimal grading just for the house, garage and entrance, it is about 1/3 or less of the lot. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction Sequence: 1) Install construction entrance (gravel) to minimized mud on adhyancent roads. 2) Install double line of Silt Fence: 1 rst: at 10' of sea wall, 2nd: at 50' of sea wall 3) Manually Clear trees within the buffer zone and grind in zone 1. Clear vegetation in the area of the house/garage and driveway. 4) Permanent Revegetation of the Buffer zone with grass seeding and mulching and grass seed mats for required areas because of the slope. 5) Grade for the house, garage and entrance. Construct buildings. 6) Install temporary or permanent groundcover within 21 days 7) Remove erosion control measures E. Diffuse Flow Plan 1a. What type of SCM are you providing? * Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Proposed project will not create concentrated stormwater flow through the buffer Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document Silt fence and road.pdf 516.62KB Site Erosion Control.pdf 422.78KB PDF only F. Supplementary Information Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? Yes No 2b. Is this an after -the -fact buffer authorization application? Yes No G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach document PDF only Additional Comments: H. Sign and Submit By digitally signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Steven Ayscue Signature Ski!' C111 t -WI- Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version: Select Reviewer: Select Reviewing Office* Has payment been received?* Yes No Yes No 20230728 1 Joey Winston: Joey. Winston Asheville Regional Office - (828) 296-4500 No Payment Needed Fee Received Need Fee - send electronic notification