Loading...
HomeMy WebLinkAboutSWA000208_Design Calculations_20230525 �L-L-j ISAACS0 1 CIVIL ENGINEERING DESIGN & LAND SURVEYING CZ 8720 RED OAK BOULEVARD, STE. 420 CHARLOTTE, N.C. 28217 PHONE (704) 527-3440 FAX (704) 527-8335 The Plant Guys Independence Commerce Drive (Stallings Commerce Drive) Matthews, North Carolina (Union County, North Carolina) Aft,,\\\1/111111/11,I "CA P0 so sees, se °•..... .•0FFSS/O•'•, .� THE ISAACS °U° QQ z = = GROUP,P.C. t, W2 :'p _ ' n ENGINEERING& C o' = �;�A:BLAND SURVEYING • � %� •. NO.C-1069 ••.A; OF NO. BY DATE REVISION The Plant Guys-22040 Swale (Liner) Calculations The Plant Guys -22040 OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: "TD-1" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 1.04 ac RUNOFF COEFFICIENT("C"): 0.60 FLOW FROM DRAINAGE AREA(Q=C*I*A): 4.68 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 228.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.010 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.038 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 4.68 cfs 0.77' 2.18 sq. ft. 0.40 ft 2.15 fps 0.48 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: "TD-2" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.01 ac RUNOFF COEFFICIENT("C"): 0.60 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.05 CfS ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 20.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.010 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(C125) MANNING'S n-VALUE: 0.022 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.05 cfs 0.07' 0.05 sq. ft. 0.05 ft 0.94 fps 0.04 psf 2.25 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S1" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.09 ac RUNOFF COEFFICIENT("C"): 0.50 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.34 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 86.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.023 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") •(BUNCH GROWFH, POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.34 cfs 0.22' 0.26 sq. ft. 0.14 ft 1.32 fps 0.32 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S2" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.10 ac RUNOFF COEFFICIENT("C"): 0.70 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.53 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 235.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.009 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") •(BUNCH GROWFH, POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.53 cfs 0.21' 0.55 sq. ft. 0.17 ft 0.95 fps 0.12 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S3" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.16 ac RUNOFF COEFFICIENT("C"): 0.80 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.96 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 380.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.013 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") •(BUNCH GROWFH, POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.96 cfs 0.27' 0.74 sq. ft. 0.20 ft 1.30 fps 0.22 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S4" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.26 ac RUNOFF COEFFICIENT("C"): 0.70 FLOW FROM DRAINAGE AREA(Q=C*I*A): 1.37 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 134.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.075 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") •(BUNCH GROWFH, POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 1.37 cfs 0.20' 0.52 sq. ft. 0.16 ft 2.65 fps 0.93 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S5" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): RUNOFF COEFFICIENT("C"): FLOW FROM DRAINAGE AREA(Q=C*I*A): ADDITIONAL FLOW(or user-defined flow): 0.52 CfS (See Hydraflow Hydrographs: "Bypass2") CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 134.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.075 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -C18SS C (6"-12") •(BUNCH GROWFH, POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.52 cfs 0.11, 0.27 sq. ft. 0.10 ft 1.94 fps 0.54 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S6" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.75 ac RUNOFF COEFFICIENT("C"): 0.95 FLOW FROM DRAINAGE AREA(Q=C*I*A): 5.34 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 132.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Gravel (D50=2") MANNING'S n-VALUE: 0.042 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 5.34 cfs 0.78' 2.23 sq. ft. 0.41 ft 2.39 fps 0.73 psf 0.80 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S7" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.68 ac RUNOFF COEFFICIENT("C"): 0.80 FLOW FROM DRAINAGE AREA(Q=C*I*A): 4.08 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 206.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") •(BUNCH GROWFH, POOR COVERAGE) MANNING'S n-VALUE: 0.035 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 4.08 cfs 0.48' 1.65 sq. ft. 0.33 ft 2.47 fps 0.45 psf 1.13 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S8" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.08 aC RUNOFF COEFFICIENT("C"): 0.60 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.36 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 206.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: Vegetated -Class C (6"-12") •(BUNCH GROWFH, POOR COVERAGE) MANNING'S n-VALUE: 0.045 SOIL CHARACTERISTICS: SOIL TEXTURE CLASS= SANDY CLAY LOAM UNIFIED SOIL CLASSIFICATION: SC (CLAYEY SANDS,SAND-CLAY MIXTURE) PLASTICITY INDEX: 23.0 VOID RATIO: 0.49 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.36 cfs 0.15' 0.36 sq. ft. 0.12 ft 1.00 fps 0.14 psf 1.87 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S1" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.09 ac RUNOFF COEFFICIENT("C"): 0.50 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.34 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 86.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.023 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.34 cfs 0.24' 0.29 sq. ft. 0.15 ft 1.15 fps 0.34 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S2" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.10 ac RUNOFF COEFFICIENT("C"): 0.70 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.53 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 235.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.009 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.53 cfs 0.24' 0.64 sq. ft. 0.18 ft 0.83 fps 0.13 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S3" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.16 ac RUNOFF COEFFICIENT("C"): 0.80 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.96 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 380.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.013 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.96 cfs 0.30' 0.85 sq. ft. 0.22 ft 1.12 fps 0.24 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S4" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.26 ac RUNOFF COEFFICIENT("C"): 0.70 FLOW FROM DRAINAGE AREA(Q=C*I*A): 1.37 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 134.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.075 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 1.37 cfs 0.22' 0.59 sq. ft. 0.17 ft 2.30 fps 1.04 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S5" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): RUNOFF COEFFICIENT("C"): FLOW FROM DRAINAGE AREA(Q=C*I*A): ADDITIONAL FLOW(or user-defined flow): 0.52 Cfs (See Hydraflow Hydrographs: "Bypass2") CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 134.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.075 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.52 cfs 0.13' 0.31 sq. ft. 0.11 ft 1.69 fps 0.60 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S6" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.75 ac RUNOFF COEFFICIENT("C"): 0.95 FLOW FROM DRAINAGE AREA(Q=C*I*A): 5.34 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 132.00 ft CHANNEL BOTTOM WIDTH: 0.50 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.038 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 5.34 cfs 0.75' 2.06 sq. ft. 0.39 ft 2.59 fps 0.70 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S7" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.68 ac RUNOFF COEFFICIENT("C"): 0.80 FLOW FROM DRAINAGE AREA(Q=C*I*A): 4.08 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 206.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.038 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 4.08 cfs 0.50' 1.75 sq. ft. 0.34 ft 2.33 fps 0.47 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute OPEN-CHANNEL FLOW WORKSHEET PROJECT: THE PLANT GUYS DESCRIPTION: SWALE "S8" FACTORS USED: TIME OF CONCENTRATION (TC): 5 min. DESIGN STORM EVENT FREQUENCY: 10-yr RAINFALL INTENSITY ("I"): 7.50 in/hr DRAINAGE AREA ("A"): 0.08 aC RUNOFF COEFFICIENT("C"): 0.60 FLOW FROM DRAINAGE AREA(Q=C*I*A): 0.36 Cfs ADDITIONAL FLOW(or user-defined flow): CHANNEL CHARACTERISTICS: CHANNEL LENGTH: 206.00 ft CHANNEL BOTTOM WIDTH: 2.00 ft CHANNEL SLOPE: 0.015 ft/ft CHANNEL SIDE SLOPES: 3 :1 CHANNEL LINING MATERIAL: UnVegetated Temporary Liner(S75) MANNING'S n-VALUE: 0.055 ANALYSIS OF CHANNEL BOTTOM: VEGETATIVE GROWTH FORM= BUNCH Total Depth of Area of Hydraulic Velocity Calculated Allowable Flow Rate Flow Flow Radius V Shear Shear (Q) (D) (Af) ( R ) ( ) Stress Stress 0.36 cfs 0.17' 0.41 sq. ft. 0.14 ft 0.87 fps 0.15 psf 1.60 psf ALLOWABLE SHEAR STRESS IS GREATER THAN THE CALCULATED SHEAR STRESS;THEREFORE, CHANNEL BOTTOM WILL BE STABLE Effective shear stress and permissible shear stresses were computed as described in the Hydraulic Engineering Circular No. 15,Third Edition,Design of Roadside Channels with Flexible Linings,September 2005 as produced by the U.S.Department of Transportation,Federal Highway Administration,National Highway Institute Skimmer Basin Calculations The Plant Guys -22040 "SKIMMER" BASIN WORKSHEET DESCRIPTION: THE PLANT GUYS Drainage Area to Basin (A) = 1.75 ac. Disturbed Area to Basin (Ad) = 1.70 ac. Weighted Runoff Coefficient (c) = 0.65 Required Basin Volume = 3060.00 ft3 =Ad x 1,800 Provided Volume (at 713.00) ft = 5305.00 ft3 (see table, below) ELEVATION AREA INC. VOLUME ACC. VOLUME 711 1988 ft2 0.00 ft3 0.00 sq. ft. 712 2638 ft2 2313.00 ft3 2313.00 sq. ft. 713 3346 ft2 2992.00 ft3 5305.00 sq. ft. 714 4109 ft2 3727.50 ft3 9032.50 sq. ft. 715 4930 ft2 4519.50 ft3 13552.00 sq. ft. SPILLWAY ANALYSIS 10-yr Flow Into Basin (Q,o) = 7.77 cfs = (c *I*A); where°I"=6.86 in/hr Proposed Spillway Elevation = 713.00 ft Proposed Spillway Width (W) = 15.00 ft Flow Height Over Spillway (h) = 0.31 ft = [Q,o/(3 *W)]2'3 TRAPPING EFFICIENCY (75% Trapping Efficiency Per the Barfield and Clar Equation) Surface Area Required at Design Flow = 325 * Q,o = 2524.91 ft2 Surface Area Provided at Design Flow (see table) = 3346.00 ft2 SKIMMER SIZING Volume = 5305.00 ft3 (Released Over 5.0 days) Table 6.64a(NCDENR) Flow (Qj _ (5305.00 ft3/ 5 days) = 1061 ft3/day skimmersize bead ........................................................................®....................................................................m Chosen Skimmer Size = 2.00 in Thus, Head (H) = 0.167 ft 1.5 in 0.125 ft Desired Orifice Diameter = [Qd /(2300 * (H)12)]12 = 1.06 in tin 0.167ft ...........................................................®............................................................m Therefore, Use 1.0 in. Orifice 2.5in 0.208ft 3 in 0.250 ft ...........................................................®............................................................m 4 in 0.292 ft 5 in 0.333 ft ...........................................................®............................................................m 6 in 0.417 ft 8 in 0.500 ft .......................................................................................................................m Storm Drain (Pipe) Calculations The Plant Guys -22040 GRAVITY PIPE FLOW ANALYSIS BASED UPON MANNING'S&THE ENERGY EQUATION PROJECT:THE PLANT GUYS PIPE FLOW CALCULATIONS FOR A 10-YEAR STORM EVENT Stallings July 12,2022-12:12 PM down- down- Pipe Pipe Pipe Manning's Drainage Runoff Time of Rainfall Surface user-Defined Lateral Total Capacity of Depth of Wetted Wetted Hydraulic Discharge Structure Pipe Tailwater Water Elev. Structure Rim Invert stream stream Length Slope Diameter Pipe roughness Area Coeff. Concentration Intensity Runoff Flow Flow Flow Pipe Flow Flow Area Perimeter Radius Velocity Headlosses Headloss Elevation at Inlet Name Elevation Out structure Invert (L) (S) (D) Material (n) (Ad) (c) (Tc) (I) (Q-) (Qoser) (Qiar) (Qror) (Q-p) (d) (A-) (P.) (Rh) (V) (He Hj Hb) (Ht) (T.) (HGL) A4 716.00' 707.50' A3 707.25' 52.97 ft 0.0047 12 in HDPE 0.012 7.50 in/hr 2.60 cfs 2.60 cfs 2.85 cfs 0.80 ft 0.6736 ft2 2.2143 ft 0.3042 ft 3.85 fps 0.34 ft. 0.19 ft. 707.29 ft. 707.82 ft. A3 718.63' 707.14' A2 705.90' 247.62 ft 0.0050 12 in HDPE 0.012 7.50 in/hr 2.60 cis 2.94 cis 0.77 ft 0.6489 ft' 2.1412 ft 0.3032 ft 3.95 fps 0.06 ft. 0.87 ft. 706.36 ft. 707.29 ft. A2 709.95' 705.80' END 705.77' 6.14 ft 0.0049 15 in HDPE 0.012 0.20 ac 0.95 5 min. 7.50 in/hr 1.43 cfs 4.03 cis 5.26 cis 0.86 ft 0.9031 ft' 2.4508 ft 0.3688 ft 4.45 fps 0.08 ft. 0.02 ft. 706.27 ft. 706.36 ft. B4 717.67' 714.20' B3 713.55' 78.72 ft 0.0083 12 in HDPE 0.012 0.52 ac 0.75 7.50 in/hr 2.93 cis 2.93 cfs 3.77 cfs 0.69 ft 0.5780 ft' 1.9606 ft 0.2950 ft 4.99 fps 0.48 ft. 0.36 ft. 713.45 ft. 714.30 ft. B3 718.84' 713.45' B2 712.45' 121.94 ft 0.0082 15 in HDPE 0.012 0.05 ac 0.95 7.50 in/hr 0.36 cis 0.47 cfs 3.75 cfs 6.82 cfs 0.69 ft 0.6916 ft2 2.0888 ft 0.3311 ft 5.37 fps 0.15 ft. 0.32 ft. 712.88 ft. 713.45 ft. B2 715.51' 712.35' END 712.00' 42.93 ft 0.0082 18 in HDPE 0.012 0.75 ac 0.95 7.50 in/hr 5.34 cis 9.10 cfs 11.06 cfs 1.10 ft 1.3822 ft' 3.0732 ft 0.4493 ft 6.56 fps 0.17 ft. 0.22 ft. 712.50 ft. 712.88 ft. C2 720.52' 715.75' C1 714.45' 85.19 ft 0.0153 12 in HDPE 0.012 0.09 ac 0.50 7.50 in/hr 0.34 cfs 0.34 cfs 5.13 cfs 0.18 ft 0.0961 ft' 0.8763 ft 0.1097 ft 3.51 fps 0.24 ft. 0.02 ft. 712.96 ft. 715.75 ft. C1 719.83' 714.35' B3 713.55' 54.25 ft 0.0147 12 in HDPE 0.012 0.02 ac 0.90 7.50 in/hr 0.14 cfs 0.47 cfs 5.04 cfs 0.21 ft 0.1199 ft' 0.9521 ft 0.1259 ft 3.78 fps 0.06 ft. 0.02 ft. 712.88 ft. 712.96 ft. D1 714.43' 712.25' END 712.00' 33.10 ft 0.0076 15 in HDPE 0.012 0.80 ac o.80 7.50 in/hr 4.80 cfs 4.80 cfs 6.54 cfs 0.83 ft 0.8592 ft� 2.3706 ft 0.3624 ft 5.47 fps 0.58 ft. 0.13 ft. 712.50 ft. 713.21 ft. PIPES 1 Energy Dissipater Calculations The Plant Guys -22040 PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL: 3 Do= 3.75' L = APRON LENGTH, (FEET) Do = OUTLET PIPE DIAMETER, (INCHES) d50= MEDIAN STONE SIZE, (FEET) W = Do + La = 1 1.75' OUTLET 2 MIN 90 I�T�TTTT� PIPE DIAMETER, Do= 80 L— ah° 1 �O 70 I I I I I I -- TAILWATER < 0.5 D �\+ o PERMANENT GEOTEXTILE FABRIC PQ� p� ! I I I I I I I I I i /i I OBI D = 1.5 TIMES THE MAXIMUM D� STONE DIAMETER BUT NOT LESS THAN 6-INCHES ��\J 50 40 O� a 4 30 lam I II I I I I I I I I I I \ I I I I I I I I I I I I I I I I I I I I I \$� I I I I I I I I I I I I I I 20 N5 a% d� W 3 Ld 12 W La (MIN) FOR A 10 15" PIPE = 8' /i ii L`-� a N U) 0 I I I I I I I I I I I I I I I I I I I I I I �\ a/�OOI 2 0_ Dc cp ,O Of \� p a. Lo RECOMMENDED MINd5o 6—IN d5a (MIN) FOR A 15" PIPE = 0.50' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 3 5 10 20 50 100 200 500 1000 (WHICH IS 6") DISCHARGE, FT3 / SEC PROPOSED qo=4 cfs RIPRAP APRON H.W. "A1" Stormwater Management Calculations The Plant Guys -22040 SAND-FILTER DETENTION BASIN WORKSHEET THE PLANT GUYS - BASIN #1 July 01,2022 Total Drainage Area (AD) = 2.39 ac. Total Impervious Area (A;) = 1.34 ac. Impervious Fraction (IA) = 0.57 =Impervious Area (A;) / Total Drainage Area(A) Runoff Coefficient (Rv) = 0.57 =0.05+0.9*IA [Per NCDENR DWQ BMP Manual] WATER QUALITY VOLUME (WQJ TO BE CONTROLLED Volume (V) to be controlled = (3630* Rp* Rv*AD) Where: Rp =Design Storm Depth = 1 inch Ap =Watershed Area =2.39 ac. Thus, Volume (WQv) = 4,945.15 ft3 *This volume is provided(above Sand Filter)at 714.54 ft (See the Stage-Storage table,below) RELEASE RATE The Water Quality Volume (WQv) shall be released over a time period of 24 hours SEDIMENT FOREBAY SIZING Req'd. Sediment Forebay Volume = 0.25 *WQv= = 1236.29 ft3 (Sediment Forebay Volume is provided at Elev. = 713.94 ft) (*Forebay Spillway will be at 714.00 ft) Using the Camp-Hazen Equation, the Forebay Minimum Surface Area (AS) in "ft2" =240 x Rv x AD x Rp Where: Rv=Runoff Coefficient(0.05 + 0.9*IA) = 0.57 AD =Watershed (or Drainage Area) =2.39 ac. Rp = Design Storm (Runofo Depth = 1 inch Thus, the Forebay Minimum Surface Area (AS) = 326.95 ft2 The proposed Forebay surface area (at the forebay spillway elevation) = 930.00 ft2 SEDIMENT FOREBAY STAGE-STORAGE ELEVATION FOREBAYAREA FOREBAYINCREMENTAL VOLUME FOREBAY CUMULATIVE VOLUME 712.00 ft 381 ft2 0 ft3 0 ft3 713.00 ft 627 ft2 504 ft3 504 ft3 714.00 ft 930 ft2 779 ft3 1283 ft3 715.00 ft 1289 ft2 1110 ft3 2392 ft3 PRIMARY BASIN (ABOVE SAND FILTER) SIZING Req'd. Basin Treatment Volume = "Adjusted"WQv= 0.75 *WQv = 3,708.86 ft3 ("Adjusted" Water Quality Volume is provided at Elev. = 714.06 ft) (*Primary outlet will be at 714.10 ft) PRIMARY BASIN (ABOVE SAND FILTER) STAGE-STORAGE ELEVATION SURFACE AREA INCREMENTAL VOLUME BASIN CUMULATIVE VOLUME* 712.00 ft 1278 ft2 0 ft3 0 ft3 713.00 ft 1757 ft2 1518 ft3 1518 ft3 714.00 ft 2292 ft2 2025 ft3 3542 ft3 715.00 ft 2883 ft2 2588 ft3 6130 ft3 716.00 ft 4872 ft2 3878 ft3 10007 ft3 *Proposed Basin "Top of Dam"= 716.50 ft SAND FILTER SIZING Using Darcy's Equation, the Surface Area (in ,ft2,,) =Af= (WQ,*df)/[k * (hf+ df) *tf] Where: WQ,= Water Quality Volume (in ft) =4945.15 ft3 df= Filter Bed Depth (in "feet") =2.5 ft k = Coefficient of Permeabilty (for sand filter media) = 3.5 ft/day = 1.75 in/hr hf=Average Height of Water (above Sand Filter bed) = 1.27 ft tf= Filter Bed Drain Time (in "days") =24hrs-24hrs/day = 1.000 days Thus, Minimum Af= 936.65 ft2 Proposed Af= 940.00 ft2 (see Design Drawings) SAND FILTER STAGE-STORAGE & FILTRATION RATE STAGE(ELEVATION) AREA ACC. VOLUME ESTIMATED FILTRATION" 712.00 ft 940 ft2 0 ft3 0 ft3/day 0.00 cfs** 713.00 ft 940 ft2 940 ft3 4606 ft3/day 0.053 cfs 714.00 ft 940 ft2 1880 ft3 5922 ft3/day 0.069 cfs 715.00 ft 940 ft2 2820 ft3 7238 ft3/day 0.084 cfs 716.00 ft 940 ft2 3760 ft3 8554 ft3/day 1 0.099 cfs 'Estimated filtration rate(QE)is computed from the Darcy equation as follows:QE=V/tf=[Af*k*(hf+df)]/df "Discharge at the surface elevation of the filter media is neglected and assumed to be zero UNDERDRAIN PIPE AND PERFORATIONS The capacity of the underdrain (and its perforations) must be greater than the sand filter's media capacity or minimum drawdown rate, whichever is greater. As calculated above, the maximum drawdown rate (or"maximum release rate") = 0.057 cfs The sand filter media capacity is the filtration rate at the average water height above the sand filter surface. Water Quality Volume is provided at 714.54 ft (which is 2.54 ft above the sand filter surface) Thus, the avg. water height above the sand filter surface =2.54 -2 = 1.27 ft, or= Elevation 713.27 ft At 713.27 ft (or 1.27 ft above the sand filter), the filtration rate is= 0.057 cfs The underdrain pipe capacity (Q.) is computed using Manning's equation: Q. = (1.49/n) *A,H* Rh213* S°.5 Where: n = Gauckler-Manning Coefficient = 0.013 A,H= Wetted Area = 0.196 ft2 (for a 6-inch diameter pipe) Rh =Hydraulic Radius = (A,H/P,H) = 0.125 ft PW=Wet Perimeter= 1.57 ft S = Slope of Pipe = 0.005 ft/ft (for a 0.50%slope) Thus, Q. = 0.40 cfs To account for clogging, Q./2 = 0.20 cfs Therefore, the proposed underdrain pipe and perforations capacities are sufficient. The perforation capacity (QPe) is computed using the orifice flow equation: QPe = c *A * (2*g*h)0.5 Where: c = Orifice Coefficient = 0.6 g = Gravitational Constant = 32.2 ft/sec2 A =Area of Orifice Opening (in ft2) = 0.00077 ft2 (for 3/8"perforations) h -Height of Water Above Orifice - 1.77 ft* "The height of water above the orifice is the average height of water above the filter+the thickness of the Thus, QPe = 0.005 cfs (per hole) filter+1/2 the thickness of the underdrain bed. The underdrain shall have 4 perforated rows with each hole being 3 inches on-center. Also, there will be at least 84 ft of underdrain piping. Thus, the total number of perforations = [84 - (3/12)] *4 = 1344 Thus, Qpt= 0.005 cfs per hole * 1344 holes = 6.606 cfs For clogging, Qpt/2 = 3.30 cfs Therefore, the proposed underdrain pipe and perforations capacities are sufficient. Storm Routing (Hydraflow Hydrographs) Report The Plant Guys-22040 Hydraflow Table of Contents Hydro-22040-Rational.gpw Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year SummaryReport......................................................................................................................... 3 HydrographReports................................................................................................................... 4 Hydrograph No. 1, Rational, X1-Pre......................................................................................... 4 Hydrograph No. 2, Rational, DetainedArea.............................................................................. 5 Hydrograph No. 3, Reservoir, SandFilter................................................................................. 6 PondReport - SandFilter..................................................................................................... 7 Hydrograph No. 4, Rational, X1-Post....................................................................................... 8 Hydrograph No. 5, Rational, Bypass2...................................................................................... 9 Hydrograph No. 6, Rational, Bypass1.................................................................................... 10 HydrographNo. 7, Rational, A2.............................................................................................. 11 Hydrograph No. 8, Combine, X2-Post.................................................................................... 12 Hydrograph No. 9, Rational, X2-Pre....................................................................................... 13 TR-55 Tc Worksheet......................................................................................................... 14 10 - Year SummaryReport....................................................................................................................... 15 HydrographReports................................................................................................................. 16 Hydrograph No. 1, Rational, X1-Pre....................................................................................... 16 Hydrograph No. 2, Rational, DetainedArea............................................................................ 17 Hydrograph No. 3, Reservoir, SandFilter............................................................................... 18 Hydrograph No. 4, Rational, X1-Post..................................................................................... 19 Hydrograph No. 5, Rational, Bypass2.................................................................................... 20 Hydrograph No. 6, Rational, Bypass1.................................................................................... 21 HydrographNo. 7, Rational, A2.............................................................................................. 22 Hydrograph No. 8, Combine, X2-Post.................................................................................... 23 Hydrograph No. 9, Rational, X2-Pre....................................................................................... 24 25 - Year SummaryReport....................................................................................................................... 25 HydrographReports................................................................................................................. 26 Hydrograph No. 1, Rational, X1-Pre....................................................................................... 26 Hydrograph No. 2, Rational, DetainedArea............................................................................ 27 Hydrograph No. 3, Reservoir, SandFilter............................................................................... 28 Hydrograph No. 4, Rational, X1-Post..................................................................................... 29 Hydrograph No. 5, Rational, Bypass2.................................................................................... 30 Hydrograph No. 6, Rational, Bypassl.................................................................................... 31 HydrographNo. 7, Rational, A2.............................................................................................. 32 Hydrograph No. 8, Combine, X2-Post.................................................................................... 33 Hydrograph No. 9, Rational, X2-Pre....................................................................................... 34 100 - Year SummaryReport....................................................................................................................... 35 HydrographReports................................................................................................................. 36 Contents continued... Hydro-22o4o-RationaI.gpw Hydrograph No. 1, Rational, X1-Pre....................................................................................... 36 Hydrograph No. 2, Rational, DetainedArea............................................................................ 37 Hydrograph No. 3, Reservoir, SandFilter............................................................................... 38 Hydrograph No. 4, Rational, X1-Post..................................................................................... 39 Hydrograph No. 5, Rational, Bypass2.................................................................................... 40 Hydrograph No. 6, Rational, Bypass1.................................................................................... 41 HydrographNo. 7, Rational, A2.............................................................................................. 42 Hydrograph No. 8, Combine, X2-Post.................................................................................... 43 Hydrograph No. 9, Rational, X2-Pre....................................................................................... 44 OFReport.................................................................................................................. 45 1 Watershed Model Schematic Hydraflow Hydrographs Extension forAutodesk®Civil 3D®by Autodesk, Inc.v2022 X 1-Post DetainedArea i ■ X1-Pre Sand Filter ss1 A2 X2-Pre B ass2 -Post Legend Hvd• Origin Description 1 Rational X1-Pre 2 Rational DetainedArea 3 Reservoir SandFilter 4 Rational X1-Post 5 Rational Bypass2 6 Rational Bypass1 7 Rational A2 8 Combine X2-Post 9 Rational X2-Pre Project: Hydro-22040-Rational.gpw Friday, 07/ 1 /2022 2 Hydrograph Return Period Recap draflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 Rational ------ 0.292 ------- ------- ------- 0.441 0.487 ------- 0.548 X1-Pre 2 Rational ------ 7.460 ------- ------- ------- 11.28 12.45 ------- 13.99 DetainedArea 3 Reservoir 2 0.059 ------- ------- ------- 0.068 0.070 ------- 2.643 SandFilter 4 Rational ------ 0.252 ------- ------- ------- 0.380 0.420 ------- 0.472 X1-Post 5 Rational ------ 0.344 ------- ------- ------- 0.521 0.574 ------- 0.646 Bypass2 6 Rational ------ 0.996 ------- ------- ------- 1.505 1.661 ------- 1.868 Bypass1 7 Rational ------ 0.957 ------- ------- ------- 1.446 1.596 ------- 1.794 A2 8 Combine 3,5,6, 2.336 ------- ------- ------- 3.526 3.887 ------- 4.366 X2-Post 7 9 Rational ------ 2.065 ------- ------- ------- 3.234 3.595 ------- 4.083 X2-Pre Proj. file: Hydro-22040-Rational.gpw Friday, 07/ 1 /2022 3 Hydrograph Summary Report HydraflowHydrographs Extension for Autodesk®Civil 3DObyAutodesk,Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Rational 0.292 1 5 88 ------ ------ ------ X1-Pre 2 Rational 7.460 1 5 2,238 ------ ------ ------ DetainedArea 3 Reservoir 0.059 1 10 2,209 2 713.35 2,218 Sand Filter 4 Rational 0.252 1 5 76 ------ ------ ------ X1-Post 5 Rational 0.344 1 5 103 ------ ------ ------ Bypass2 6 Rational 0.996 1 5 299 ------ ------ ------ Bypass1 7 Rational 0.957 1 5 287 ------ ------ ------ A2 8 Combine 2.336 1 5 2,899 3,5,6, ------ ------ X2-Post 7 9 Rational 2.065 1 16 1,982 ------ ------ ------ X2-Pre Hyd ro-22040-RationaLgpw Return Period: 1 Year Friday, 07 / 1 /2022 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 1 X1-Pre Hydrograph type = Rational Peak discharge = 0.292 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 88 cuft Drainage area = 0.290 ac Runoff coeff. = 0.2* Intensity = 5.035 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(12.860 x 0.30)+(0.640 x 0.95)]/0.290 X1-Pre Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 Ale, 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 2 DetainedArea Hydrograph type = Rational Peak discharge = 7.460 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,238 cuft Drainage area = 2.390 ac Runoff coeff. = 0.62* Intensity = 5.035 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(1.050 x 0.20)+(1.340 x 0.95)]/2.390 DetainedArea Q (Cfs) Hyd. No. 2 -- 1 Year Q (Cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 3 SandFilter Hydrograph type = Reservoir Peak discharge = 0.059 cfs Storm frequency = 1 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 2,209 cuft Inflow hyd. No. = 2 - DetainedArea Max. Elevation = 713.35 ft Reservoir name = SandFilter Max. Storage = 2,218 cuft Storage Indication method used. SandFilter Q (cfs) Hyd. No. 3-- 1 Year Q (cfs) 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 Time (min) Hyd No. 3 Hyd No. 2 0 Total storage used =2,218 cult Pond Report 7 Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Pond No. 1 - SandFilter Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation. Begining Elevation=712.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cult) Total storage(cult) 0.00 712.00 1,278 0 0 1.00 713.00 1,757 1,518 1,518 2.00 714.00 2,292 2,025 3,542 3.00 715.00 2,883 2,588 6,130 4.00 716.00 4,872 3,878 10,007 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 0.00 0.00 0.00 0.00 Crest Len(ft) = 16.00 20.00 Inactive Inactive Span(in) = 0.00 0.00 0.00 0.00 Crest El.(ft) = 714.10 714.10 0.00 0.00 No.Barrels = 1 0 0 0 Weir Coeff. = 3.10 3.10 3.33 3.33 Invert El.(ft) = 712.00 0.00 0.00 0.00 Weir Type = Broad Broad Rect --- Length(ft) = 0.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope(%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/Discharge Elev(ft) 4.00 716.00 3.00 715.00 2.00 714.00 1.00 713.00 0.00 712.00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 300.0 Total Q Discharge(cfs) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 4 X1-Post Hydrograph type = Rational Peak discharge = 0.252 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 76 cuft Drainage area = 0.250 ac Runoff coeff. = 0.2 Intensity = 5.035 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X1-Post Q (cfs) Hyd. No. 4-- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No.4 Time (min) 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 5 Bypass2 Hydrograph type = Rational Peak discharge = 0.344 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 103 cuft Drainage area = 0.190 ac Runoff coeff. = 0.36* Intensity = 5.035 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.150 x 0.20)+(0.040 x 0.95)]/0.190 Bypass2 Q (Cfs) Hyd. No. 5 -- 1 Year Q (Cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 X X 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 6 Bypass1 Hydrograph type = Rational Peak discharge = 0.996 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 299 cuft Drainage area = 0.460 ac Runoff coeff. = 0.43* Intensity = 5.035 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.320 x 0.20)+(0.140 x 0.95)]/0.460 Bypass1 Q (Cfs) Hyd. No. 6 -- 1 Year Q (Cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 X0.70 0.60 0.60 0.50 0.50 0.40 N 0.40 0.30 0.30 0.20 N 0.20 0.10 X 0.10 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 6 Time (min) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 7 A2 Hydrograph type = Rational Peak discharge = 0.957 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 287 cuft Drainage area = 0.200 ac Runoff coeff. = 0.95 Intensity = 5.035 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 A2 Q (cfs) Hyd. No. 7-- 1 Year Q (cfs) 1.00 1.00 0.90 X 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 z0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 7 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 8 X2-Post Hydrograph type = Combine Peak discharge = 2.336 cfs Storm frequency = 1 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 2,899 cuft Inflow hyds. = 3, 5, 6, 7 Contrib. drain. area = 0.850 ac X2-Post Q (cfs) Hyd. No. 8-- 1 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 60 120 180 240 300 360 420 480 540 600 660 Hyd No. 8 Hyd No. 3 Hyd No. 5 Hyd No. 6 Time (min) Hyd No. 7 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 9 X2-Pre Hydrograph type = Rational Peak discharge = 2.065 cfs Storm frequency = 1 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 1 ,982 cuft Drainage area = 3.150 ac Runoff coeff. = 0.2 Intensity = 3.277 in/hr Tc by TR55 = 16.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X2-Pre Q (Cfs) Hyd. No. 9 -- 1 Year Q (Cfs) 3.00 3.00 2.00 2.00 OF z 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Hyd No. 9 Time (min) 14 TR55 Tc Worksheet Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. No. 9 X2-Pre Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.12 0.00 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 14.45 + 0.00 + 0.00 = 14.45 Shallow Concentrated Flow Flow length (ft) = 364.00 0.00 0.00 Watercourse slope (%) = 3.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.15 0.00 0.00 Travel Time (min) = 1.93 + 0.00 + 0.00 = 1.93 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc .............................................................................. 16.00 min 15 Hydrograph Summary Report HydraflowHydrographs Extension for Autodesk®Civil 3DObyAutodesk,Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Rational 0.441 1 5 132 ------ ------ ------ X1-Pre 2 Rational 11.28 1 5 3,383 ------ ------ ------ DetainedArea 3 Reservoir 0.068 1 10 3,354 2 713.91 3,358 Sand Filter 4 Rational 0.380 1 5 114 ------ ------ ------ X1-Post 5 Rational 0.521 1 5 156 ------ ------ ------ Bypass2 6 Rational 1.505 1 5 452 ------ ------ ------ Bypass1 7 Rational 1.446 1 5 434 ------ ------ ------ A2 8 Combine 3.526 1 5 4,396 3,5,6, ------ ------ X2-Post 7 9 Rational 3.234 1 16 3,105 ------ ------ ------ X2-Pre Hyd ro-22040-RationaLgpw Return Period: 10 Year Friday, 07 / 1 /2022 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 1 X1-Pre Hydrograph type = Rational Peak discharge = 0.441 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 132 cuft Drainage area = 0.290 ac Runoff coeff. = 0.2* Intensity = 7.610 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(12.860 x 0.30)+(0.640 x 0.95)]/0.290 X1-Pre Q (Cfs) Hyd. No. 1 -- 10 Year Q (Cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 z 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 2 DetainedArea Hydrograph type = Rational Peak discharge = 11 .28 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,383 cuft Drainage area = 2.390 ac Runoff coeff. = 0.62* Intensity = 7.610 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(1.050 x 0.20)+(1.340 x 0.95)]/2.390 DetainedArea Q (Cfs) Hyd. No. 2 -- 10 Year Q (Cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 3 SandFilter Hydrograph type = Reservoir Peak discharge = 0.068 cfs Storm frequency = 10 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 3,354 cuft Inflow hyd. No. = 2 - DetainedArea Max. Elevation = 713.91 ft Reservoir name = SandFilter Max. Storage = 3,358 cuft Storage Indication method used. SandFilter Q (cfs) Hyd. No. 3-- 10 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) Hyd No. 3 Hyd No. 2 0 Total storage used =3,358 cult 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 4 X1-Post Hydrograph type = Rational Peak discharge = 0.380 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 114 cuft Drainage area = 0.250 ac Runoff coeff. = 0.2 Intensity = 7.610 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X1-Post Q (cfs) Hyd. No. 4-- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 M0.35 0.30 0.30 0.25 0.25 0.20 z0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No.4 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 5 Bypass2 Hydrograph type = Rational Peak discharge = 0.521 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 156 cuft Drainage area = 0.190 ac Runoff coeff. = 0.36* Intensity = 7.610 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.150 x 0.20)+(0.040 x 0.95)]/0.190 Bypass2 Q (Cfs) Hyd. No. 5 -- 10 Year Q (Cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 6 Bypass1 Hydrograph type = Rational Peak discharge = 1 .505 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 452 cuft Drainage area = 0.460 ac Runoff coeff. = 0.43* Intensity = 7.610 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)=[(0.320 x 0.20)+(0.140 x 0.95)]/0.460 Bypass1 Q (Cfs) Hyd. No. 6 -- 10 Year Q (Cfs) 2.00 2.00 1.00 1.00 0.00 - - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 6 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 7 A2 Hydrograph type = Rational Peak discharge = 1 .446 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 434 cuft Drainage area = 0.200 ac Runoff coeff. = 0.95 Intensity = 7.610 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 A2 Q (Cfs) Hyd. No. 7 -- 10 Year Q (Cfs) 2.00 2.00 1.00 1.00 0.00 - - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 7 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 8 X2-Post Hydrograph type = Combine Peak discharge = 3.526 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,396 cuft Inflow hyds. = 3, 5, 6, 7 Contrib. drain. area = 0.850 ac X2-Post Q (Cfs) Hyd. No. 8 -- 10 Year Q (Cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 -- - 0.00 0 60 120 180 240 300 360 420 480 540 600 660 720 Hyd No. 8 Hyd No. 3 Hyd No. 5 Hyd No. 6 Time (min) Hyd No. 7 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 9 X2-Pre Hydrograph type = Rational Peak discharge = 3.234 cfs Storm frequency = 10 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 3,105 cuft Drainage area = 3.150 ac Runoff coeff. = 0.2 Intensity = 5.133 in/hr Tc by TR55 = 16.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X2-Pre Q (Cfs) Hyd. No. 9 -- 10 Year Q (Cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Hyd No. 9 Time (min) 25 Hydrograph Summary Report HydraflowHydrographs Extension for Autodesk®Civil 3DObyAutodesk,Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Rational 0.487 1 5 146 ------ ------ ------ X1-Pre 2 Rational 12.45 1 5 3,734 ------ ------ ------ DetainedArea 3 Reservoir 0.070 1 10 3,705 2 714.06 3,708 Sand Filter 4 Rational 0.420 1 5 126 ------ ------ ------ X1-Post 5 Rational 0.574 1 5 172 ------ ------ ------ Bypass2 6 Rational 1.661 1 5 498 ------ ------ ------ Bypass1 7 Rational 1.596 1 5 479 ------ ------ ------ A2 8 Combine 3.887 1 5 4,854 3,5,6, ------ ------ X2-Post 7 9 Rational 3.595 1 16 3,452 ------ ------ ------ X2-Pre Hyd ro-22040-RationaLgpw Return Period: 25 Year Friday, 07 / 1 /2022 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 1 X1-Pre Hydrograph type = Rational Peak discharge = 0.487 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 146 cuft Drainage area = 0.290 ac Runoff coeff. = 0.2* Intensity = 8.399 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(12.860 x 0.30)+(0.640 x 0.95)]/0.290 X1-Pre Q (Cfs) Hyd. No. 1 --25 Year Q (Cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 z0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 2 DetainedArea Hydrograph type = Rational Peak discharge = 12.45 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,734 cuft Drainage area = 2.390 ac Runoff coeff. = 0.62* Intensity = 8.399 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(1.050 x 0.20)+(1.340 x 0.95)]/2.390 DetainedArea Q (Cfs) Hyd. No. 2 --25 Year Q (Cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 000, 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 3 SandFilter Hydrograph type = Reservoir Peak discharge = 0.070 cfs Storm frequency = 25 yrs Time to peak = 10 min Time interval = 1 min Hyd. volume = 3,705 cuft Inflow hyd. No. = 2 - DetainedArea Max. Elevation = 714.06 ft Reservoir name = SandFilter Max. Storage = 3,708 cuft Storage Indication method used. SandFilter Q (cfs) Hyd. No. 3 --25 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 Time (min) Hyd No. 3 Hyd No. 2 Total storage used = 3,708 cuft 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 4 X1-Post Hydrograph type = Rational Peak discharge = 0.420 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 126 cuft Drainage area = 0.250 ac Runoff coeff. = 0.2 Intensity = 8.399 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X1-Post Q (Cfs) Hyd. No. 4 --25 Year Q (Cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 z0.15 0.10 74 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 4 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 5 Bypass2 Hydrograph type = Rational Peak discharge = 0.574 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 172 cuft Drainage area = 0.190 ac Runoff coeff. = 0.36* Intensity = 8.399 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.150 x 0.20)+(0.040 x 0.95)]/0.190 Bypass2 Q (Cfs) Hyd. No. 5 --25 Year Q (Cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 6 Bypass1 Hydrograph type = Rational Peak discharge = 1 .661 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 498 cuft Drainage area = 0.460 ac Runoff coeff. = 0.43* Intensity = 8.399 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.320 x 0.20)+(0.140 x 0.95)]/0.460 Bypass1 Q (Cfs) Hyd. No. 6 --25 Year Q (Cfs) 2.00 2.00 1.00 1.00 0.00 - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 6 Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 7 A2 Hydrograph type = Rational Peak discharge = 1 .596 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 479 cuft Drainage area = 0.200 ac Runoff coeff. = 0.95 Intensity = 8.399 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 A2 Q (Cfs) Hyd. No. 7 --25 Year Q (Cfs) 2.00 2.00 1.00 1.00 0.00 - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 7 Time (min) 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 8 X2-Post Hydrograph type = Combine Peak discharge = 3.887 cfs Storm frequency = 25 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,854 cuft Inflow hyds. = 3, 5, 6, 7 Contrib. drain. area = 0.850 ac X2-Post Q (Cfs) Hyd. No. 8 --25 Year Q (Cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - - 0.00 0 60 120 180 240 300 360 420 480 540 600 660 720 780 Hyd No. 8 Hyd No. 3 Hyd No. 5 Hyd No. 6 Time (min) Hyd No. 7 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 9 X2-Pre Hydrograph type = Rational Peak discharge = 3.595 cfs Storm frequency = 25 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 3,452 cuft Drainage area = 3.150 ac Runoff coeff. = 0.2 Intensity = 5.707 in/hr Tc by TR55 = 16.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X2-Pre Q (Cfs) Hyd. No. 9 --25 Year Q (Cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Hyd No. 9 Time (min) 35 Hydrograph Summary Report HydraflowHydrographs Extension for Autodesk®Civil 3DObyAutodesk,Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Rational 0.548 1 5 164 ------ ------ ------ X1-Pre 2 Rational 13.99 1 5 4,198 ------ ------ ------ DetainedArea 3 Reservoir 2.643 1 9 4,170 2 714.17 3,989 Sand Filter 4 Rational 0.472 1 5 142 ------ ------ ------ X1-Post 5 Rational 0.646 1 5 194 ------ ------ ------ Bypass2 6 Rational 1.868 1 5 560 ------ ------ ------ Bypass1 7 Rational 1.794 1 5 538 ------ ------ ------ A2 8 Combine 4.366 1 5 5,462 3,5,6, ------ ------ X2-Post 7 9 Rational 4.083 1 16 3,920 ------ ------ ------ X2-Pre Hyd ro-22040-RationaLgpw Return Period: 100 Year Friday, 07 / 1 /2022 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 1 X1-Pre Hydrograph type = Rational Peak discharge = 0.548 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 164 cuft Drainage area = 0.290 ac Runoff coeff. = 0.2* Intensity = 9.445 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(12.860 x 0.30)+(0.640 x 0.95)]/0.290 X1-Pre Q (Cfs) Hyd. No. 1 -- 100 Year Q (Cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 01 0.10 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 1 Time (min) 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 2 DetainedArea Hydrograph type = Rational Peak discharge = 13.99 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 4,198 cuft Drainage area = 2.390 ac Runoff coeff. = 0.62* Intensity = 9.445 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(1.050 x 0.20)+(1.340 x 0.95)]/2.390 DetainedArea Q (Cfs) Hyd. No. 2 -- 100 Year Q (Cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 2 Time (min) 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 3 SandFilter Hydrograph type = Reservoir Peak discharge = 2.643 cfs Storm frequency = 100 yrs Time to peak = 9 min Time interval = 1 min Hyd. volume = 4,170 cuft Inflow hyd. No. = 2 - DetainedArea Max. Elevation = 714.17 ft Reservoir name = SandFilter Max. Storage = 3,989 cuft Storage Indication method used. SandFilter Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 Time (min) Hyd No. 3 Hyd No. 2 0 Total storage used =3,989 cult 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 4 X1-Post Hydrograph type = Rational Peak discharge = 0.472 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 142 cuft Drainage area = 0.250 ac Runoff coeff. = 0.2 Intensity = 9.445 in/hr Tc by User = 5.00 min IDF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X1-Post Q (cfs) Hyd. No. 4-- 100 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 z0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No.4 Time (min) 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 5 Bypass2 Hydrograph type = Rational Peak discharge = 0.646 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 194 cuft Drainage area = 0.190 ac Runoff coeff. = 0.36* Intensity = 9.445 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.150 x 0.20)+(0.040 x 0.95)]/0.190 Bypass2 Q (Cfs) Hyd. No. 5 -- 100 Year Q (Cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 z0.20 0.10 0.10 0.00 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 5 Time (min) 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 6 Bypass1 Hydrograph type = Rational Peak discharge = 1 .868 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 560 cuft Drainage area = 0.460 ac Runoff coeff. = 0.43* Intensity = 9.445 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 Composite(Area/C)_[(0.320 x 0.20)+(0.140 x 0.95)]/0.460 Bypass1 Q (Cfs) Hyd. No. 6 -- 100 Year Q (Cfs) 2.00 2.00 1.00 1.00 0.00 - - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 6 Time (min) 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 7 A2 Hydrograph type = Rational Peak discharge = 1 .794 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 538 cuft Drainage area = 0.200 ac Runoff coeff. = 0.95 Intensity = 9.445 in/hr Tc by User = 5.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 A2 Q (Cfs) Hyd. No. 7 -- 100 Year Q (Cfs) 2.00 2.00 1.00 1.00 0.00 - 0.00 0 1 2 3 4 5 6 7 8 9 10 Hyd No. 7 Time (min) 43 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday, 07/1 /2022 Hyd. No. 8 X2-Post Hydrograph type = Combine Peak discharge = 4.366 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 5,462 cuft Inflow hyds. = 3, 5, 6, 7 Contrib. drain. area = 0.850 ac X2-Post Q (cfs) Hyd. No. 8-- 100 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 60 120 180 240 300 360 420 480 540 600 660 720 780 Hyd No. 8 Hyd No. 3 Hyd No. 5 Hyd No. 6 Time (min) — Hyd No. 7 44 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Friday,07/1/2022 Hyd. No. 9 X2-Pre Hydrograph type = Rational Peak discharge = 4.083 cfs Storm frequency = 100 yrs Time to peak = 16 min Time interval = 1 min Hyd. volume = 3,920 cuft Drainage area = 3.150 ac Runoff coeff. = 0.2 Intensity = 6.482 in/hr Tc by TR55 = 16.00 min OF Curve = Monroe.IDF Asc/Rec limb fact = 1/1 X2-Pre Q (Cfs) Hyd. No. 9 -- 100 Year Q (Cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 Hyd No. 9 Time (min) 45 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk0 Civil 3DO by Autodesk, Inc.v2022 Friday, 07/1 /2022 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 66.8196 12.9000 0.8963 -------- 2 76.9232 13.1000 0.8842 -------- 3 76.1571 12.9000 0.8569 -------- 5 77.2081 12.9000 0.8371 -------- 10 75.5517 12.4000 0.8036 -------- 25 66.0145 11.1000 0.7420 -------- 50 59.2567 10.1000 0.6965 -------- 100 53.8843 9.2000 0.6563 -------- File name: Monroe.IDF Intensity= B/(Tc + D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 5.03 4.04 3.38 2.92 2.57 2.30 2.08 1.91 1.76 1.63 1.52 1.43 2 5.94 4.79 4.03 3.49 3.08 2.76 2.50 2.30 2.12 1.97 1.84 1.73 3 6.43 5.21 4.40 3.82 3.38 3.04 2.77 2.54 2.35 2.19 2.05 1.93 5 6.90 5.61 4.76 4.15 3.68 3.32 3.03 2.79 2.58 2.41 2.26 2.13 10 7.61 6.21 5.28 4.62 4.11 3.72 3.40 3.14 2.92 2.73 2.56 2.42 25 8.40 6.87 5.87 5.15 4.61 4.19 3.85 3.56 3.33 3.12 2.95 2.79 50 8.94 7.33 6.28 5.53 4.97 4.53 4.17 3.88 3.63 3.42 3.23 3.07 100 9.44 7.75 6.66 5.88 5.30 4.85 4.48 4.18 3.92 3.70 3.51 3.34 Tc=time in minutes.Values may exceed 60. Preci .file name: Monroe.pc Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 2.58 3.12 0.00 4.32 4.80 5.76 6.48 6.96 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00