Loading...
HomeMy WebLinkAbout20050732 Ver 30_Stormwater Ph 11 Revised_20150610vvM`KIM&crtES° �T0: NCDENR - Division of Water Resources 401 & Buffer Permittiniz Unit 512 N. Salisbury St. Archdale Building - 9th floor Raleigh, NC 27604 ATTENTION: Mr. Boyd Devane LETTER OF TRANSMITTAL DATE: June 9, 2015 PROJECT NO: 2735 -0128 TASK NO: EXP RE: Briar Chapel - Phase 11 TRANSMITTAL NO: 1 PAGE 1 OF 1 WE ARE SENDING: ❑ Originals ® Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ® Calculations ❑ Other - Quantity Dwg No. Rev. Description Status 2 Stormwater Design Plans - REVISED G 2 Supporting Calculations - REVISED G 2 BMP #18 Design Supplement G Issue Status Code REMARKS: A. Preliminary B. Fabrication Only C. ror Intormation U. 1510 E. Construction F. For Review & Comments G. For Approval H. See Remarks Boyd, Per our recent conversation, I have provided revised plans, calculations and design supplement for BMP #18 that was previously approved under permit #05- 0732V30 and issued February 27, 2015. Please find the enclosed documents for your review. Please let us know if you have any questions or comments. Thank you. 1730 Varsity Drive, Suite 500 Raleigh, NC 27606 919/233 -8091 Fax 919/233 -8031 Cc: .D JUN 1 0 2015 DENR - WATER RESOURCES Signed McKIM & CREED, INC. Gareth Avant, PE Permit No. (to be provided by DWO) Red trianlles at the upper right hand corner indicate design comments Please Wmplete the yellow shaded items. AV 4 h�OF WAT�9O� WUNRO < STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must he filled out, printed and submitted. The Required items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. 1 �PRUCTINFORMATION Project n9me Briar Chapel Development - SD North Contact person Gareth Avant, PE Phone number 919.233.8091 Date 9-Jun -2015 Drainage area number 1- Wet Pond #18 - Revised 11 -DEWN INFORMATION Site Characteristics Drainage area 192,038 fe Impervious area, post - development 125,300 fly % impervious 65.25% Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre - development 1 -yr, 24-hr runoff Post - development 1 -yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations is the prelpost control of the lyr 24hr storm peak flow required? 1 -yr, 24-hr rainfall depth Rational C, pre - development Rational C, post - development Rainfall intensity: 1 -yr. 24-hr stone Pre - development 1 -yr, 24-hr peak flow Post - development 1 -yr, 24-hr peak flow Pre/Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the peen. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment deanout, top elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there additional volume stored above the state - required temp. pool? Elevation of the top of the additional volume 10,198 ft' OK 10,889 ft3 OK, volume provided is equal to or in excess of volume required, ft3 ft3 ft3 ft3 n Y (Y or N) 3.0 in 0.40 (unitless) 0.80 (unidess) 0.13 in/hr OK 12.87 ft' /sec 47.65 felsec 34.78 ft' /sec 497.70 fmsl 496.50 fmsl fmsl 497.00 fmsl 496.00 fmsl Data not needed for calculation option #1, but OK if provided. 491.00 fmsl 488.00 fmsl Data not needed for calculation option #1, but OK if provided. 3.00 ft N (Y or N) fmsl Form SW401 -Wet Detention Basin- Rev.8- 9/17109 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Ill. DESIGN INFORMATION OK Surface Areas OK Area, temporary pool 9,937 ft' Area REQUIRED, permanent pool 5,761 fly SAIDA ratio 3.00 (unitiess) Area PROVIDED, permanent pool, A,r,n_Poa 7,294 a OK Area, bottom of 1 Oft vegetated shelf, Ate, 5,216 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abo,l„d 1,559 ff Volumes Volume, temporary pod Volume, permanent pool, Vp,,,,s, Volume, forebay (sum of forebays K more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain /Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10 -2b) Volume, permanent pool, Vp j, Area provided, permanent pool, Ap,,,_ooa Average depth calculated Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10 -2b) Area provided, permanent pool, Ap.,.d Area, bottom of 1 Oft vegetated shelf , Ate, ,ho Area, sediment cleanout, top elevation (bottom of pond), Ab,_pow 'Depth" (distance bIw bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d., (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (K circular) Area of orifice (K- non - circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre - development 1 -yr, 24-hr peak flow Post - development 1 -yr, 24 -hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Form SW401 -Wet Detention Basin- Rev.8. 9117109 10,889 ft, OK 21,855 ft' 4,097 ft3 18.7%% OK 90% N (Y or N) Y (Y or N) 3.00 (unitiess) Y (Y or N) 21,855 ft' 7,294 fe 3.00 It OK 3.0 It OK N (Y or N) 7,294 ft' 5,216 ft' 1,559 ft2 5 -00 It ft It Y (Y or N) 1.75 in in 0.60 (unitless) 0.40 It N (Y or N) (unitless) (unitless) It It 3 -71 ft3 /sec 12.59 ft3 /sec 0.04 ft3 /sec 2.30 days OK, draws down in 2 -5 days. 3 :1 OK 10 :1 OK 10.0 It OK 3 :1 OK 2.0 :1 OK Y (Y or N) OK 1.0 It OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK 6" PVC with gate valve Parts I. & II. Design Summary, Page 2 of 2 r . .401� Permit No. III. REQUIRED ITEMS CHECKLIST (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. GCA C3.0 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. GCA D4.1 -014.3 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross - section, Vegetation specification for planting shelf, and Filter strip. GCA D4.1 -D4.3 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. GCA NIA 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. GCA Calc Booklet 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. GCA C3.0 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. GCA Calc Booklet 7. The supporting calculations. GCA Included 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. GCA NIA 9. A copy of the deed restrictions (if required). NIA 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin- Rev.8- 911 710 9 Part III. Required Items Checklist, Page 1 of 1 REVISED BMP #18 CALCULATIONS Briar Chapel Development SD North Commercial Chatham County, North Carolina June 9, 2015 Prepared for: BRIAR7- ZCHAPEL' Newland COMMUN111ES NNP Briar Chapel, LLC 16 Windy Knoll Circle Chapel Hill, North Carolina 27516 Prepared By: v *�MCKIM&CREED 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 "%""%1111111�11111!"� Phone: (919) 233.8091 N�.����NOliy' Fax: (919) 233.8031 ''Q� NE � �u - MSC Project No. 02735 -0128 = 036348 = 0610912015 F flYgN4.EQ` �Q`��`c "1111111I11111111, JUN 1 0 2015 j DENR . WATER RESOURCES 401 8 BUFFER PERPAT71NG \1` 3:---), WATER QUALITY POND #18 CALCULATIONS Project Name Briar Chapel - Commercial SD North Project Number 02735 -0128 Date June 9, 2015 3rd revision 2nd revision 1 st revision X Water Quality Pond Drainage Area Data Project Briar Chapel - Commercial SD North Project No. 02735 -0128 Date June 9, 2015 Total site area 192,038 square feet = 4.41 acres Impervious areas Drainage area to pond Other Drainage Area Existing s Proposed s Change s Existing s Proposed [Sfl Parcel #2 Proposed s On -site buildings 0 12,855 12,855 0 0 On -site streets/ parking 0 31,310 31,310 0 0 On -site sidewalks 0 2,000 2,000 0 0 Parcels #3 & #4 0 On -site building #1 & patio 0 15,750 15,750 0 0 On -site building #2 0 0 0 0 0 On -site streets/ parking 0 54,025 54,025 0 0 On -site sidewalks 0 4,360 4,360 0 0 On -site future (open space) 0 0 0 0 0 Off -site future development 0 0 0 0 0 Contingency 0 5,000 5,000 0 0 Total Impervious 0 125,300 125,300 0 0 Non-impervious areas Drainage area to and Other Drainage Area Existing s Proposed s Change s Existing s Proposed s On -site grass/landscape 0 469,691 469,691 0 0 On -site woods 1,446,171 11,425 - 1,434,746 0 0 Other undeveloped 0 0 0 0 0 Total off -site non-impervious 0 0 0 0 0 Total non-impervious 1,446,171 481,116 - 965,055 0 0 Total Drainage Area 192,038 192,038 0 3,167,850 3,167,850 Percent Impervious 0.0 65.2 65.2 0.0 0.0 Notes: 2015.06.09.Wet Detention #18.Revised.xls Site Drainage Area Data Page 2 of 19 Printed 6/9/2015 3:54 PM Water Quality Pond Surface Area Calculations Project Briar Chapel - Commercial SD North Project No. 02735 -0128 Date June 9, 2015 Total on -site drainage area to pond 192,038 square feet Total impervious area in drainage area 125,300 square feet Average water depth of basin at normal pool 3.0 feet Location of site Chatham County Site region Piedmont % Impervious cover 65.2 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area /Drainage Area Ratios: For a site in the Piedmont (85 %) 2.7 percent For a site in the Piedmont (90 %) 3.8 percent For a site in a Coastal County w/ Vegetative Filter 5.5 percent For a site in a Coastal County w /out Vegetative Filter 7.6 percent Required surface area of pond: For a site in the Piedmont (85 %) 5,100.0 square feet For a site in the Piedmont (90 %) 7,230.0 square feet For a site in a Coastal County w/ Vegetative Filter 10,610.0 square feet For a site in a Coastal County w /out Vegetative Filter 14,560.0 square feet Notes: 2015.06.09.Wet Detention #18.Revised.xls Pond Surface Area Calcs Page 4 of 19 Printed 6/9/2015 3:54 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Briar Chapel - Commercial SD North Project No. 02735 -0128 Date June 9, 2015 Drainage area 192,038 square feet Impervious area 125,300 square feet Rainfall depth 1.00 inches Percent Impervious 65.2 percent R(v)= 0.05 +0.009 *(Percent impervious) Runoff coefficient - R(v) 0.64 in /in Runoff volume = (Design rainfall) *(R(v)) *(Drainage area) Runoff volume 10,197.7 cubic feet Notes: 2015.06.09.Wet Detention #18.Revised.xls Runoff Volume Calcs Page 5 of 19 Printed 6/9/2015 3:54 PM Water Quality Pond Volume Calculations Stage- Storage Data for Pond - Temporary Pool Project Briar Chapel - Commercial SD North Project No. 02735 -0128 Date June 9, 2015 Contour ID Stage Area [s q- ft. Area acres Incremental Area [s q- ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 496.5 0 7,294.0 0.167 7,294.0 0.2 0.0 0.0 0.0 0.0 497 0.5 9,312.0 0.214 9,312.0 0.0 4,151.5 01 4,151.5 0.1 497.7 1.2 9,937.0 0.228 9,937.0 0.0 6,737.1 0.2 10.888.6 0.2 498 1.5 10,209.0 0.234 10,209.0 0.0 3.021.9 0.1 13,910.6 0.2 499 2.5 11,140.0 0.256 11,140.0 0.0 10,674.5 0.2 24,585.1 0.3 500 3.5 12,107.0 0.278 12,107.0 0.0 11,623.5 0.3 36, 208.6 0.5 501 4.5 13,110.0 0.301 13,110.0 0.0 12,608.5 0.3 48.817.1 0.6 501.5 5 13,265.0 0305 13,265.0 0.0 6,593.8 0.2 55,410.8 0.4 2015.06.09.Wet Detention #18.Revised.xls Stage Storage (Temp Pool) Page 6 of 19 Printed 6/9/2015 3:54 PM Water Quality Pond Volume Calculations Stage - Storage Data for Pond - Permanent Pool Project Briar Chapel - Commercial SD North Project No. 02735 -0128 Date June 91 2015 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 488 0 172.0 0.004 172.0 0.0 0.0 0.0 0.0 0.0 489 1 568.0 0.013 396.0 0.0 370.0 0.0 370.0 0.0 490 2 1,038.0 0.024 470.0 0.0 803.0 0.0 1,173.0 0.0 491 3 1,559.0 0.036 521.0 0.0 1,298.5 0.0 2,471.5 0.0 492 4 2,158.0 0.050 599.0 0.0 1,858.5 0.0 4,330.0 0.1 493 5 2,818.0 0.065 660.0 0.0 2,488.0 0.1 6,818.0 0.1 494 6 3,546.0 0.081 728.0 0.0 3,182.0 0.1 10,000.0 0.1 495 7 4,346.0 0.100 800.0 0.0 3,946.0 01 13,946.0 0.2 496 8 5,216.0 0.120 870.0 0.0 4.781.0 0.1 18,727.0 0.2 496.5 8.5 7,294.0 0.167 2,078.0 0.0 3,127.5 0.1 21,854.5 0.2 2015.06.09.Wet Detention #18.Revised.xls Stage Storage (Perm Pool) Page 7 of 19 Printed 6/9/2015 3:54 PM Water Quality Pond Volume Calculations Stage - Storage Data for Pond - Forebays Project Briar Chapel - Commercial SD North Project No. 02735 -0128 Date June 9, 2015 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre -ft Cumulative volume cu. ft Cumulative volume acre -ft 490 0 83.0 0.002 83.0 0.0 0.0 0.0 0.0 0.0 491 1 183.0 0.004 100.0 0.0 133.0 0.0 133.0 0.0 492 2 320.0 0.007 137.0 0.0 251.5 0.0 384.5 0.0 493 3 494.0 0.011 174.0 0.0 407.0 0.0 791.5 0.0 494 4 703.0 0 016 209.0 0.0 598.5 0.0 1,390.0 0.0 495 5 951.0 0.022 248.0 0.0 827.0 0.0 2,217.0 0.0 496 6 1,238.0 0.028 287.0 0.0 1,094.5 0.0 3,311.5 0.0 496.5 6.5 1,903.0 0.044 665.0 0.0 785.3 0.0 4,096.8 0.0 2015.06.09.Wet Detention #18.Revised.xls Stage Storage (Forebays) Page 8 of 19 Printed 6/9/2015 3:54 PM Water Quality Basin Dewatering Time Calculations Project Briar Chapel - Commercial SD North Project No. 02735 -0128 Date June 9, 2015 Water quality treatment volume 10,198 cubic feet Total treatment volume 10,889 cubic feet Maximum head of water above dewatering hole 1.20 feet Driving head 0.40 feet Orifice coefficient 0.60 Diameter of each hole 1.75 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for water quality volume = Dewatering time for total volume = 0.017 square feet 2.4 square inches 0.017 square feet 2.4 square inches 2.3 days 56.0 hours 2.5 days 59.8 hours Notes: Dewatering time formula: t (days) = V / (Cd *A *Sgrt (2'32.2 *H) *86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) Water Quality Pond Summary Information Project Briar Chapel - Commercial SD North Project No. 02735 -0128 Date June 9, 2015 Drainage area to pond 192,038 square feet = 4.41 acres Impervious area in drainage area 125,300 square feet = 2.88 acres Bottom of pond elevation 488.00 feet Normal pool elevation 496.50 feet Pond volume at normal pool 21,855 cubic feet Forebay volume at normal pool 4,096 cubic feet Forbay % of total volume 18.7% Required volume for design rainfall 10,198 cubic feet Required surface area for pond 7,230 square feet Volume provided for storage of design rainfall = 10,889 cubic feet at elevation Surface area provided at normal pool 7,294 square feet Average Depth 3.00 feet 497.7 2015.06.09.Wet Detention #18.Revised.xls Summary Data Page 11 of 19 Printed 6/9/2015 3:54 PM 1S (2S) Pre - Development Post- Development 3P �:I&Ira.:�;1 CSu cat Reach on Link 2015.06.09.BMP #18.Revised Type 1124-hr 9 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 6/9/2015 HydroCADO 10.00 s/n 04927 © 2011 HvdroCAD Software Solutions LLC Paae 12 Summary for Subcatchment 1S: Pre - Development Runoff = 3.71 cfs @ 12.09 hrs, Volume= 0.239 af, Depth> 0.61" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 2.96" Area (ac) CN Description 4.690 70 Woods, Good, HSG C 4.690 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, 4 3 H 3 2 LL 1 Subcatchment 1S: Pre - Development Hydrograph 3.71 cfs Type II 24 -hr 1 -Yr Rainfall= 2.96" Runoff Area =4.690 ac Runoff Volume =0.239 of Runoff Depth >0.61" Tc =15.0 min CN =70 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 2015.06.09.BMP #18.Revised Type 1124-hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 6/9/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 2S: Post - Development Runoff = 12.59 cfs @ 12.01 hrs, Volume= 0.647 af, Depth> 1.65" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Yr Rainfall= 2.96" Area (ac) CN Description 1.940 74 >75% Grass cover, Good, HSG C 2.760 98 Paved parking, HSG C 4.700 88 Weighted Average 1.940 41.28% Pervious Area 2.760 58.72% Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 2S: Post - Development Hydrograph 14 13 12.59 cfs 12 Type II 24 -hr 11 1 -Yr Rainfall= 2.96" 10 Runoff Area =4.700 ac 9 Runoff Volume =0.647 of Runoff Depth >1.65" 6 6 Tc =10.0 min LL 5 CN =88 3 2 1 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 2015.06.09.BMP #18.Revised Type ll 24 -hr 1 -Yr Rainfall = 2.96" Prepared by McKim & Creed Printed 6/9/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Paae 14 Summary for Pond 3P: BMP #18 Inflow Area = 4.700 ac, 58.72% Impervious, Inflow Depth > 1.65" for 1 -Yr event Inflow = 12.59 cfs @ 12.01 hrs, Volume= 0.647 of Outflow = 2.99 cfs @ 12.25 hrs, Volume= 0.389 af, Atten= 76 %, Lag= 13.9 min Primary = 2.99 cfs @ 12.25 hrs, Volume= 0.389 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 498.07' @ 12.25 hrs Surf.Area= 10,274 sf Storage= 14,628 cf Plug -Flow detention time= 145.8 min calculated for 0.387 of (60% of inflow) Center -of -Mass det. time= 73.5 min ( 852.9 - 779.4 ) Volume Invert Avail.Storage Storage Description #1 496.50' 55,412 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 496.50 7,294 0 0 497.00 9,312 4,152 4,152 498.00 10,209 9,761 13,912 499.00 11,140 10,675 24,587 500.00 12,107 11,624 36,210 501.00 13,110 12,609 48,819 501.50 13,265 6,594 55,412 Device Routing Invert Outlet Devices #1 Primary 492.27' 15.0" Round Culvert L= 42.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 492.27'/492.00' S=0.0064'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 496.50' 1.7" Vert. Orifice /Grate C= 0.600 #3 Device 1 497.70' 24.0" W x 6.0" H Vert. Orifice /Grate X 2.00 C= 0.600 #4 Device 1 499.00' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 500.00' 20.0' long x 22.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =2.98 cfs @ 12.25 hrs HW= 498.07' (Free Discharge) L = Culvert (Passes 2.98 cfs of 13.44 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0.09 cfs @ 5.89 fps) 3= Orifice /Grate (Orifice Controls 2.88 cfs @ 1.95 fps) = Orifice /Grate ( Controls 0.00 cfs) M econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 496.50' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) 2015.06.09.BMP #18.Revised Type// 24 -hr 1 -Yr Rainfall= 2.96" Prepared by McKim & Creed Printed 6/9/2015 HydroCAD® 10.00 s/n 04927 @2011 HydroCAD Software Solutions LLC Page 15 Pond 3P: BMP #18 Hydrograph 12.59 cfs ®Inflow -, outflow Inflow Area =4.700 ac ❑ Primary 14 i -7 Secondary 13 Peak Elev= 498.07' 12 Storage= 14,628 cf 11 ,o 9 j 8 v 3 7 0 LL 6 s 2.99 cfs ,- Time (hours) 2015.06.09.BMP #18-Revised Type 11 24 -hr 10- YrRainfall= 5.97" Prepared by McKim & Creed Printed 6/9/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 1S: Pre - Development Runoff = 12.89 cfs @ 12.08 hrs, Volume= 0.769 af, Depths 1.97' Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall= 5.17' Area (ac) CN Description 4.690 70 Woods, Good, HSG C 4.690 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, LL 14 13 12 11 10 n M Subcatchment 1S: Pre - Development Hydrograph 1 12.89 cfs I Type 11 24-hr 10 -Yr Rainfall= 5.17" Runoff Area =4.690 ac Runoff Volume =0.769 of Runoff Depth >1.97" Tc =15.0 min CN =70 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 2015.06.09.BMP #18.Revised Type 1124-hr 10 -Yr Rainfall= 5.17" Prepared by McKim & Creed Printed 6/9/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 2S: Post - Development Runoff = 26.20 cfs @ 12.01 hrs, Volume= 1.404 af, Depth> 3.59" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Yr Rainfall = 5.17" Area (ac) CN Description 1.940 74 >75% Grass cover, Good, HSG C 2.760 98 Paved parking, HSG C 4.700 88 Weighted Average 1.940 41.28% Pervious Area 2.760 58.72% Impervious Area Tc Length min) (feet) 10.0 28 26 24 c 1 10 8 6 4 2 Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) Direct Entry, Subcatchment 2S: Post - Development Hydrograph 26.20 cfs Type II 24 -hr 10 -Yr Rainfall= 5.17" Runoff Area =4.700 ac Runoff Volume =1.404 of Runoff Depth >3.59" Tc =10.0 min CN =88 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 2015.06.09.BMP #18.Revised Type// 24 -hr 10 -Yr Rainfall = 5.17" Prepared by McKim & Creed Printed 6/9/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 19 Summary for Pond 3P: BMP #18 Inflow Area = 4.700 ac, 58.72% Impervious, Inflow Depth > 3.59" for 10 -Yr event Inflow = 26.20 cfs @ 12.01 hrs, Volume= 1.404 of Outflow = 12.76 cfs @ 12.15 hrs, Volume= 1.138 af, Atten= 51 %, Lag= 8.1 min Primary = 12.76 cfs @ 12.15 hrs, Volume= 1.138 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 499.14' @ 12.15 hrs Surf.Area= 11,278 sf Storage= 26,190 cf Plug -Flow detention time= 100.0 min calculated for 1.138 of (81 % of inflow) Center -of -Mass det. time= 47.4 min ( 809.0 - 761.6 ) Volume Invert Avail.Storage Storage Description #1 496.50' 55,412 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 496.50 7,294 0 0 497.00 9,312 4,152 4,152 498.00 10,209 9,761 13,912 499.00 11,140 10,675 24,587 500.00 12,107 11,624 36,210 501.00 13,110 12,609 48,819 501.50 13,265 6,594 55,412 Device Routing Invert Outlet Devices #1 Primary 492.27' 15.0" Round Culvert L= 42.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 492.27'/ 492.00' S=0.0064'/' Cc= 0.900 n=0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 496.50' 1.7" Vert. Orifice /Grate C= 0.600 #3 Device 1 497.70' 24.0" W x 6.0" H Vert. Orifice /Grate X 2.00 C= 0.600 #4 Device 1 499.00' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 500.00' 20.0' long x 22.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =12.66 cfs @ 12.15 hrs HW= 499.14' (Free Discharge) L = Culvert (Passes 12.66 cfs of 14.77 cfs potential flow) 2= Orifice /Grate (Orifice Controls 0.12 cfs @ 7.72 fps) 3= Orifice /Grate (Orifice Controls 10.49 cfs @ 5.24 fps) = Orifice /Grate (Weir Controls 2.05 cfs @ 1.22 fps) econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 496.50' (Free Discharge) = Broad - Crested Rectangular Weir( Controls 0.00 cfs) 2015.06.09.BMP #18.Revised Type 1124-hr 10- YrRainfall= 5.17" Prepared by McKim & Creed Printed 6/9/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 20 18 16 3 14 o _ u' 12 10 8 6 4 0.00 cfs Pond 3P: BMP #18 Hydrograph 20 CfS ®Inflow O 26. Outflow El Primary Inflow Area =4.700 ac ❑ Secondary Peak Elev= 499.14' Storage= 26,190 cf 19 7A 12.76 cfs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2015.06.09.BMP #18.Revised Type 11 24 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 6/9/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment 1S: Pre - Development Runoff = 24.93 cfs @ 12.07 hrs, Volume= 1.490 af, Depth> 3.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall= 7.62" Area ac CN Description 4.690 70 Woods, Good, HSG C 4.690 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 1S: Pre - Development Hydrograph ❑ Runoff 26 24.93 cfs 24 Type II 24 -hr 22 100 -Yr Rainfall= 7.62" 20 Runoff Area =4.690 ac 18 Runoff Volume =1.490 of y 16 14 Runoff Depth >3.81" LL 12- Tc =15.0 min 1° CN =70 ° IPFF64, -- - 5 a 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2015.06.09.BMP #18.Revised Type Il 24 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 6/9/2015 HydroCADO 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 2S: Post - Development Runoff = 41.22 cfs @ 12.01 hrs, Volume= 2.274 af, Depth> 5.81" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Yr Rainfall = 7.62" Area (ac) CN Description 1.940 74 >75% Grass cover, Good, HSG C 2.760 98 Paved parking, HSG C 4.700 88 Weighted Average 1.940 41.28% Pervious Area 2.760 58.72% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, 44 30 28 w 26 24 0 22 LL 20 18 16 14 12 10 Subcatchment 2S: Post - Development Hydrograph 41.22 cfs Type II 24 -hr 100 -Yr Rainfall = 7.62" Runoff Area =4.700 ac Runoff Volume =2.274 of Runoff Depth >5.81" Tc =10.0 min CN =88 5 8 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ❑ Runoff 2015.06.09.BMP #18.Revised Type Il 24 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 6/9/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 24 Summary for Pond 3P: BMP #18 [82] Warning: Early inflow requires earlier time span Inflow Area = 4.700 ac, 58.72% Impervious, Inflow Depth > 5.81" for 100 -Yr event Inflow = 41.22 cfs @ 12.01 hrs, Volume= 2.274 of Outflow = 19.11 cfs @ 12.15 hrs, Volume= 2.001 af, Atten= 54 %, Lag= 8.5 min Primary = 15.92 cfs @ 12.15 hrs, Volume= 1.974 of Secondary = 3.19 cfs @ 12.15 hrs, Volume= 0.026 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 500.15' @ 12.15 hrs Surf.Area= 12,260 sf Storage= 38,066 cf Plug -Flow detention time= 84.0 min calculated for 2.000 of (88% of inflow) Center -of -Mass det. time= 44.5 min ( 796.2 - 751.8 ) Volume Invert Avail.Storage Storage Description #1 496.50' 55,412 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 496.50 7,294 0 0 497.00 9,312 4,152 4,152 498.00 10,209 9,761 13,912 499.00 11,140 10,675 24,587 500.00 12,107 11,624 36,210 501.00 13,110 12,609 48,819 501.50 13,265 6,594 55,412 Device Routing Invert Outlet Devices #1 Primary 492.27' 15.0" Round Culvert L= 42.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 492.27'/492.00' S=0.0064'/' Cc= 0.900 n= 0.013 Concrete pipe, bends & connections, Flow Area= 1.23 sf #2 Device 1 496.50' 1.7" Vert. Orifice /Grate C= 0.600 #3 Device 1 497.70' 24.0" W x 6.0" H Vert. Orifice /Grate X 2.00 C= 0.600 #4 Device 1 499.00' 36.0" x 36.0" Horiz. Orifice /Grate C= 0.600 Limited to weir flow at low heads #5 Secondary 500.00' 20.0' long x 22.0' breadth Broad - Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max =15.92 cfs @ 12.15 hrs HW= 500.15' (Free Discharge) t = Culvert (Inlet Controls 15.92 cfs @ 12.97 fps) 2=Orifice/Grate (Passes < 0.14 cfs potential flow) 3= Orifice /Grate (Passes < 14.28 cfs potential flow) = Orifice /Grate (Passes < 46.50 cfs potential flow) econdary OutFlow Max =3.17 cfs @ 12.15 hrs HW= 500.15' (Free Discharge) = Broad - Crested Rectangular Weir (Weir Controls 3.17 cfs @ 1.04 fps) 2015.06.09.BMP #18.Revised Type 1124 -hr 100 -Yr Rainfall= 7.62" Prepared by McKim & Creed Printed 6/9/2015 HydroCAD® 10.00 s/n 04927 © 2011 HydroCAD Software Solutions LLC Page 25 Pond 3P: BMP #18 Hydrograph 41.22 Cfs ■ Inflow 7 Outflow 46 Inflow Area =4.700 ac : Primary 42 Peak Elev= 500.15' 40 36 Storage= 38,066 cf 34 32 30 28 Z 26 19.11 cfs 24 IIAM 0 22 20 15.92 cfs u. 18 16 Time (hours) 9-11 X93 —495 a \ \ \\ \ qq -"I" m". lil WET DETEN -10N POND #18 PLAN VIEW SCALE = 1 as = 20' PROVIDE CHAIN AND LOCK FOR WHEEL HANDLE GALVANIZED 3.5x3.5'x3/16" —� TRASH RACK I CRANK HAND .11 VALVE GATE 9 7.0' RUBBER GASKET FdrMEMITIrm ME CONCRETE PRESSURE PIPE JOINT DETAIL NTS m SEAL SECTION AT PRINCIPLE SPILLWAY SCALE = 1 a' = 4' Aiii R4 4 k!%#k �NFKM&CUED -qqupll 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 (919)233-8091, F- 1222 PRINCIPLE SPILLWAY SCALE = 1 " = 2' PLACE CEMENT MORTAR IN JOINT SPACE SECTION H 6" PVC TO POND BANK 4.0' TO D 2'a 4 SPA. @ 6 a � gas 4 1 5" GATE f AND CRANK AYLIGHT ANGLE IRON 4'9 X 4" X 5/8" X 2' LONG TYPICAL EACH SIDE _. JJUI 1 0 Zia D) NR . WATER FFR ! i-Q p -, PLAN VIEW CONCRETE ENDWALL FOR 15" PIPE PER NCDOT DETAIL 838.80 FLO W A ! T22" BRIAR A r COMMERCIAL SD NORTH CHATHAM COUNTY, NORTH CAROLINA r O NTS Fir DATE: JANUARY 20, 2015 r� a � PROJ 02735-0128 DR :a •� DRAWING NUM 5 REVISED POND DESIGN PER UPDATED SITE PLAN 2015.06.09 4 REVISED PER COMMENTS FROM CHATHAM COUNTY PLANNING 2015.03.27 3 REVISED PER COMMENTS FROM CHATHAM COUNTY PUBLIC UTILITIES 2015.03.02 2 REVISED PER COMMENTS FROM CHATHAM COUNTY PUBLIC UTILITIES 2015.02.09 1 REV. NO 15t SUBMITTALS TO REVIEWERS —4— DESCRIPTIONS 2015.01.20 DATE SEAL SECTION AT PRINCIPLE SPILLWAY SCALE = 1 a' = 4' Aiii R4 4 k!%#k �NFKM&CUED -qqupll 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 (919)233-8091, F- 1222 PRINCIPLE SPILLWAY SCALE = 1 " = 2' PLACE CEMENT MORTAR IN JOINT SPACE SECTION H 6" PVC TO POND BANK 4.0' TO D 2'a 4 SPA. @ 6 a � gas 4 1 5" GATE f AND CRANK AYLIGHT ANGLE IRON 4'9 X 4" X 5/8" X 2' LONG TYPICAL EACH SIDE _. JJUI 1 0 Zia D) NR . WATER FFR ! i-Q p -, PLAN VIEW CONCRETE ENDWALL FOR 15" PIPE PER NCDOT DETAIL 838.80 FLO W A ! T22" BRIAR A r COMMERCIAL SD NORTH CHATHAM COUNTY, NORTH CAROLINA r O NTS Fir DATE: JANUARY 20, 2015 r� a � PROJ 02735-0128 DR :a •� DRAWING NUM NOTED AS DESIGNED Bss CA STATUS: REVISION FINAL DRAWINGS FOR REVIEW PURPOSES . - , | 1­1|_-) Z:)r1LL | 3� ^ SPILLWAY 50TTOM WIDTH SEE TABL�' THIS SHEET NORMAL POOL _7�_L._ SPILLWAY SHDULD-- EXTEND TO NORMAL POOL ELEVATION ON BMP SIDE if W1.4x01.4 6X6 k'N.M.--/ OR APPROVED EC�J/AL /k4|W 2" CO`�iER\ VARIES TOP OF 11.0 NIN EMERGENCY. '--D|||UU�� D[T8|| NTS SPILLWAY —SPILLWAY SHALL EXTEND TO BOTTOM OF FILL SLOPE ON DOWNSTREAM SIDE EXPANSION /CONTRACTION JOINTS PER AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS FOR SLABS ON GRADE. ` � � | ��Y T���N(`A | | KEY TRENCH ' | DAM EMBANKMENT L[TA| L NTS LIMITS OF—/ CONCRETE CRADLE O^ PERFORATED PVC COLLECTOR PIPE m /'—#57 WASHED STONE 6' SOLID WALL PVC T0 DAYLIGHT -----� VARMINT SCREEN TO --- --- BE PLACED ON OPENEND. 15" CONCRETE PRESSURE PIPE 6^ SOLD WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPENEND. `--COLLECTOR PIPE T0 BE PLAN VIEW CAPPED ON BOTH ENDS FLOW 5 1' RH co u� m , , /. ro .` 0 - || � "ou � ` �� �_REFER TO CHART FOR BAR SIZE NORMAL MINIMUM MIN./MAX. MIN/MAX. POOL MIN. /MAX MIN. /MAX. • THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 83801, 838.11, 838.21, 838.27, 838 ' 33 838.39, 838.51 , 838.57, 838.63 AND838.69. EMERGENCY. '--D|||UU�� D[T8|| NTS SPILLWAY —SPILLWAY SHALL EXTEND TO BOTTOM OF FILL SLOPE ON DOWNSTREAM SIDE EXPANSION /CONTRACTION JOINTS PER AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS FOR SLABS ON GRADE. ` � � | ��Y T���N(`A | | KEY TRENCH ' | DAM EMBANKMENT L[TA| L NTS LIMITS OF—/ CONCRETE CRADLE O^ PERFORATED PVC COLLECTOR PIPE m /'—#57 WASHED STONE 6' SOLID WALL PVC T0 DAYLIGHT -----� VARMINT SCREEN TO --- --- BE PLACED ON OPENEND. 15" CONCRETE PRESSURE PIPE 6^ SOLD WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPENEND. `--COLLECTOR PIPE T0 BE PLAN VIEW CAPPED ON BOTH ENDS FLOW 5 1' RH co u� m , , /. ro .` 0 - || � "ou � ` �� �_REFER TO CHART FOR BAR SIZE ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN/MAX. MIN./MAX. MIN. /MAX MIN. /MAX. • THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 83801, 838.11, 838.21, 838.27, 838 ' 33 838.39, 838.51 , 838.57, 838.63 AND838.69. • INSTALL PRECAST ENDWALLS WITH WINGS AND PAY FOR IN ACCORDANCE WITH SPECIFICATION SECTION 83 - • USE 4000 PSI CONCRETE. :6 • PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM 5 FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING TO ASTM A185 WITH 2" MIN. CLEARANCE. • PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1926.704. • PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY CONTRACTOR • ALL ELEMENTS PRECAST TO MEET ASTM C913. • WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR As LONG AS THE SAME AREA OF STEEL IS PROVIDED. • CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1", NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS AT 8"CTS.THE CONTRACTOR WILLHAVETHE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN/MAX. MIN./MAX. MIN. /MAX MIN. /MAX. 11.50/11 75 7.0018.50 13.75/15.75 SEAL 777' 10-7 SEAL A BRIAR CHAPEL DATE: JANUARY 20, 2015 SCALE 4.X HORIZONTAL: DRAWING NUMBER COMMERCIAL SD NORTH DRAWN BSS 4 Nfl<11\4&13�EED AS NOTED CHATHAM COUNTY NORTH CAROLINA DESIGNED BSS VERTICAL: 5 REVISED POND DESIGN PER UPDATED SITE PLAN 1730 ,Iarsity Drive, Suite 500 CHECKED GCA 4 REVISED PER COMMENTS FROM CHATHAM COUNTY PLANNING 2015.03.27 : :z Raleigr�, North Carolina 27606 B I A R. CHAPEL PROJ. MGR. CHS N/A Phone: (919)233-8091, Fax: (919)233-8031 3 REVISED PER COMMENTS FROM CHATHAM COUNTY PUBLIC UTILITIES 2015.03.02 2 ISED PER COMMENTS FROM CHATHAM COUNTY PUBLIC UTILITIES 201502.09 1 Ist SUBMITTALS TO REVIEWERS 2015.01.20 by BMIP #18 PLAN & DETAILS STATUS: REVISION REV.NO. DESCRIPTIONS 111,00 Newland commmmES FINAL DRAWINGS 5 FOR REVIEW PURPOSES ONLY REVISIONS *z 'X/ / WET DETENTION POND #18 PLANTING PLAN SCALE = l = 20, , 5 REVISED POND DESIGN PER UPDATED SITE PLAN 2015,06.09 4 REVISED PER COMMENTS FROM CHATHAM COUNTY PLANNING 201503.27 3 7EVISED PER COMMENTS FROM CHATHAM COUNTY PUBLIC UTILITIES 2015.03,02 2 REVISED PER COMMENTS FROM CHATHAM COUNTY PUBLIC UTILITIES 2015.0209 I Ist SUBMITTALS TO REVIEWERS 201501.20 i REV. NO.t DESCRIPTIONS SEALI IF r5lal 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 PLANTING SCHEDULE ONTAINER SIZE AT SYM. ABB. COMMON NAME BOTANICAL NAME QUANTITY SPACING PLANTING SHALLOW WATER PLANTINGS BFI B BLUE FLAG IRIS w ws virginica 6 63 2 24"-30" O.C. 1 1 QT. SEALI IF r5lal 1730 Varsity Drive, Suite 500 Raleigh, North Carolina 27606 Phone: (919)233-8091, Fax: (919)233-8031 PLANTING SCHEDULE ONTAINER SIZE AT SYM. ABB. COMMON NAME BOTANICAL NAME QUANTITY SPACING PLANTING SHALLOW WATER PLANTINGS BFI B BLUE FLAG IRIS w ws virginica 6 63 2 24"-30" O.C. 1 1 QT. v-v[— V V V T TSB = =THREE SQUARE BULRUSH a . c 66 2 24"-30" O.C. 1 1 QT. amerl . SHALLOW LAND PLANTINGS CF C CARDINAL FLOWER L Lobelic cardinalis 7 73 2 24"-30" O.C. 1 1 QT. SRM S SCARLET ROSE MALLOW H Hibiscus coccineus 6 67 2 24pp-30pf O.C. 1 1 QT. ST S SPOTTED TRUMPETWEED 7 71 2 24" 1 1 QT. REMOVE ANY 0 E-iNG AROUND ROOTS SfALL wwERs MIM 12 1N DEPTH ALL GENERAL PLANTING D [-TA| | NTS 1. CONTINUE PLANTING SCHEME SHOWN FOR EACH #F THE 5 PLANT VARIETIES NOTED BELOW AROUI" .1 VEGETATED PLANTING SHELF DETAIL NTS lure 3. SHALLOW WATER AND SHALLOW LAND AREAS T3 BE PLANTED WITH BARE ROOT, PLUGS, OR CONTAINER LIVE PLANTINGS AS SPECIFIED. 4. EXCAVATE A HOLE TWICE THE DIAMETER OF ROOT BALL AND EQUAL TO THE ROOT DEPTH OF THE INDIVIDUAL PLANT. PLACE PLANT IN HOLE WITH CROWN FLUSH WITH SOIL SURFACE. BACKF|LL WITH TOPSOIL AND LIGHTLY PLANT 5. BEGIN PLANTING DURING LOCAL GROWING SEASON IN #?�DER TO ENSURE THAT PLANTS HAVA ADEQUATE TIME TO ESTABLISH BEFORE WINTER MONTHS. 6, OBTAIN PLANTS FROM: COASTAL PLAIN CONSERVATION NURSERY (252-482-5707), MELLOW MARAS FARMS (919-742-1200), CURE NURSERY (919-542-6186) OR ENGINEER APPROVED SUBSTITUTE. 11 7. REFER TO EROSION CONTROL DETAIL SHEET D1.2 FOR SEEDBED PREPARATION AND SEEDING SCHEDULES FOR .11kEAS Z 70% OF SWEETFLAG AND 70% OF SOUTHERN BLUE FLAG |R|5 SHOULD BE PLANTED IN THE 2-3 INCHES BELOW NORMAL PO(}[ 1. PLANTS IN THIS GROUP SHOULD NOT BE PLANTED IN AREAS THAT ARE INUNDATED FOR EXTENDED PERIODS. NewlandCOMMUNITIES BRIAR CHAPEL COMMERCIAL SD NORTH CHATHAM COUNTY, NORTH CAROLINA DATE: JANUARY 20, 2015 � M,� DRAWN BSS noRIZnmTxL: DESIGNED BSS AS NOTED CHECKED GCA LM M&C FILE NUMBER DRAWING NUMBER STATUS: REVISION FINAL DRAWINGS 5 FOR REVIEW PURPOSES ONLY ALL GENERAL PLANTING D [-TA| | NTS 1. CONTINUE PLANTING SCHEME SHOWN FOR EACH #F THE 5 PLANT VARIETIES NOTED BELOW AROUI" .1 VEGETATED PLANTING SHELF DETAIL NTS lure 3. SHALLOW WATER AND SHALLOW LAND AREAS T3 BE PLANTED WITH BARE ROOT, PLUGS, OR CONTAINER LIVE PLANTINGS AS SPECIFIED. 4. EXCAVATE A HOLE TWICE THE DIAMETER OF ROOT BALL AND EQUAL TO THE ROOT DEPTH OF THE INDIVIDUAL PLANT. PLACE PLANT IN HOLE WITH CROWN FLUSH WITH SOIL SURFACE. BACKF|LL WITH TOPSOIL AND LIGHTLY PLANT 5. BEGIN PLANTING DURING LOCAL GROWING SEASON IN #?�DER TO ENSURE THAT PLANTS HAVA ADEQUATE TIME TO ESTABLISH BEFORE WINTER MONTHS. 6, OBTAIN PLANTS FROM: COASTAL PLAIN CONSERVATION NURSERY (252-482-5707), MELLOW MARAS FARMS (919-742-1200), CURE NURSERY (919-542-6186) OR ENGINEER APPROVED SUBSTITUTE. 11 7. REFER TO EROSION CONTROL DETAIL SHEET D1.2 FOR SEEDBED PREPARATION AND SEEDING SCHEDULES FOR .11kEAS Z 70% OF SWEETFLAG AND 70% OF SOUTHERN BLUE FLAG |R|5 SHOULD BE PLANTED IN THE 2-3 INCHES BELOW NORMAL PO(}[ 1. PLANTS IN THIS GROUP SHOULD NOT BE PLANTED IN AREAS THAT ARE INUNDATED FOR EXTENDED PERIODS. NewlandCOMMUNITIES BRIAR CHAPEL COMMERCIAL SD NORTH CHATHAM COUNTY, NORTH CAROLINA DATE: JANUARY 20, 2015 � M,� DRAWN BSS noRIZnmTxL: DESIGNED BSS AS NOTED CHECKED GCA LM M&C FILE NUMBER DRAWING NUMBER STATUS: REVISION FINAL DRAWINGS 5 FOR REVIEW PURPOSES ONLY LM M&C FILE NUMBER DRAWING NUMBER STATUS: REVISION FINAL DRAWINGS 5 FOR REVIEW PURPOSES ONLY