Loading...
HomeMy WebLinkAboutNC0065749_Authorization to Construct_20020708State 'of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director July 8, 2002 Mr. Jerry H. Tweed Heater Utilities 202 MacKenan Court Cary, North Carolina 27511 7jLA NCDENR Subject: Authorization to Construct ATC No. 065749AOI NPDES Permit No. NCO065749 Ashe Plantation W WTP Mecklenburg County Dear Mr. Tweed: The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct at the Ashe Plantation WWTP. The Division finds the proposed improvements to be satisfactory and hereby grants authorization for the following: • Installation of a UV disinfection system capable of treating up to 500,000 gpd (with both units in service) including all associated piping and electrical work. • Installation of a backup dechlorination system to be used in conjunction with the existing tablet chlorination unit for standby disinfection. This Authorization to Construct is issued in accordance with NPDES Permit No. NCO065749, issued November 31, 2001, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the terms and conditions of the permit. This ATC does not represent any kind of expansion to the permitted design flow of 0.1 MGD. The Permittee shall notify the Water Quality Supervisor of the Mooresville Regional Office, telephone number (704) 663-1699, at least forty-eight (48) hours prior to operation of the installed facilities, so that an in -place inspection can be made. Notification shall be made during the normal office hours of 8:00 a.m. until 5:00 p.m., Monday through Friday. Engineer's Certification Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification (copy enclosed) from a professional engineer registered in North Carolina certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The Certification should be submitted to: NCDENR / DWQ, NPDES Unit, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617. Requirements for Certified Operator The Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5063 FAX (919) 733-0719 An Equal Opportunity Affirmative Action Employer Internet: http://h2o.enr.state.nc.ust Ashe Plantation WWTP NPDES Permit No. NCO065719 ATC No. 065719AOI Page 2 Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0200. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays, and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8G, .0200. Additional Requirements The Operational Agreement between the Permittee and the Environmental Management Commission is incorporated herein by reference and is a condition of this Permit. Noncompliance with the terms of the Operational Agreement shall subject the Permittee to all sanctions provided by G. S. 143-215.6 for violation of or failure to act in accordance with the terms and conditions of this Permit. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. One (1) copy of the approved plans and specifications is enclosed for your records. If you have any questions about this Authorization to Construct, please contact Natalie Sierra at (919) 733- 5083, extension 551. Sincerely, ,, ,r Alan W. Klimek, P.E. Enclosures: Project Plans and Specifications (approved) Engineer's Certification Form cc: Mooresville Regional Office, Water Quality Technical Assistance and Certification Unit Central Files NPDES Unit Files Mr. J. Thurman Horne, P.E. — Horizon Engineering & Consulting 107 Commercial Park Drive Concord, North Carolina 28027 ATC SUMMARY SCOPE Heater Utilities Ashe Plantation WWTP East of Charlotte, NC ATC No. 065749A01 Goose Creek, Class C Yadkin -Pee Dee River Basin, 030712 Mecklenburg County The scope of the project includes the installation of an ultra -violet (UV) disinfection system and a backup de -chlorination system (to follow an existing tablet chlorination unit). RECONMMNDATIONS 1. Approve installation of a dual UV disinfection system capable of disinfecting a peak flow of 250,000 gpd (with one unit out of service). The system will be equipped with a UV sensor connected to the existing autodialer to alert the ORC if the unit is not performing properly. 2. Approve installation of a dechlorination system to be used in the event of a failure of the UV system. 3. Approve decommissioning of the existing tablet chlorination system. SUMMARY Executive Summary NPDES permit NCO065749 for the subject facility was issued on November 30, 2001. The treatment works currently consist of: • Influent lift station • Bar screen • Equalization basin • Rectangular clarifier • Tertiary filter • Chlorine contact chamber • Filter backwash tank • Post aeration • Aerobic Sludge Digester • Continuous recording flow measuring device One of the conditions of the 2001 permit is that the facility comes into compliance with a fecal coliform limit by April 1, 2002. A modification to the permit in April 2002 extended this compliance date to October 1, 2002. This limit is part of the strategy to restore Goose Creek, the receiving stream, to its intended uses. This project is recommended, as it will keep chlorine out of the receiving stream, thereby helping to protect endangered species in Goose Creek. - end - Pagel ATC REVIEW NOTES Ashe Plantation WWTP ATC No. 065749A01 Mecklenburg County Project Name: UV Disinfection System and Back-up Dechlorination Applicant: Mr. Jerry H. Tweed Heater Utilities 202 MacKenan Court Cary, North Carolina Application/Plans Prepared by: J. Thurman Horne, P.E. Horizon Engineering and Consulting Concord, North Carolina Project Location: Ashe Plantation WWTP End of Quarters Lane East of Charlotte, North Carolina Mecklenburg County Latitude: 350 10' 40" Longitude: 801 35' 30" Quadrangle: G 16NE/Midland, North Carolina Facility status: Existing. Wastewater source: Domestic Chronology: APP RECD 6/06/02 REVIEWED 6/28/02 ACKNOWLEDGED 6/21 /02 SCH TO ISSUE 4/ 12/02 STAFF RPT REQS 6/21. /02 ISSUED STAFF RPT RECD Submissions: • Letter of Transmittal • Engineering Plans • Equipment Vendor Specification Sheets • Location map • Engineering Specifications • Construction Sequence Plan UV System Number of banks: two Number of modules: ten Number of lamps/module: two Transmittance: 65% at 253.7 nm Manufacturer: Trojan Technologies, Inc. Capacity: 500.000 gallons per day (250,000 gpd with one bank out of service) Channel type: Stainless steel Additional UV lamps, sleeves and holders will be kept on site. The system will be interfaced with the existing autodialer such that the ORC will be alerted when the UV intensity is insufficient to Page 2 meet permit limits. A submersible UV sensor will continually monitor each bank of modules. In the event of a power outage or other problems with the units, the ORC has the option of switching over to chlorination/dechlorination to achieve disinfection. Power will be provided for continuous operation; ground fault interrupter protection will also be provided. The proposed two units meet the minimum design requirements for a facility of this size as they are based on a peaking factor of 2.5 (.25 MGD for each unit). De -Chlorination This is a pre -manufactured unit that allows chemical dosing through tablet field. The proposed unit is a Series 4000 tablet feeder from Norweco and will treat flows from 20,000 gpd - 200,000 gpd. Considering the facility has equalization and this unit is for the standby disinfection process only, this should provide sufficient capacity for the system. Review Notes: This is the second time this proposal has been submitted - the original proposal did not meet the state's minimum design criteria, most notably in the sizing of the units (units were not sized to meet peak flow with one unit out of service). I used the new Division LTV guidance to review this project, which employs a 2.5 peaking factor (a minimum for this type of system for each UV bank. The only potential concern is the availability of backup power. Because this community is served by wells and an influent pump station feeds the WWTP, so any kind of a power outage would stop flow into the plant. Backup generators are available at other nearby Heater WWTPs and can be brought over to this plant in the event of an emergency. The ORC also has the option of switching over to chlorination/dechlorination, so I feel the intent of the standby power criterion has been met. Material Compatibility: Materials are compatible with the proposed application. Compatibility with existing equipment: The proposed project is compatible with the existing treatment system and will allow the facility to meet its new TRC limit. Recommendations I recommend that the Authorization to Construct be issued for the installation of a UV disinfection system standby dechlorination. Page 3 SOC PRIORITY PROJECT: To: Permits and Engineering Unit Water Quality Section Attention: Natalie Sierra Date: September 25, 2002 AUTHORIZATION TO CONSTRUCT NPDES PERMIT REPORT AND RECOMMENDATIONS County: Mecklenburg MRO No.: 02-24 Permit No. NC065749AOI PART I - GENERAL INFORMATION 2. 3. 4. 5. 1.1 7 Facility and Address: Ashe Plantation WWTP C/O Heater Utilities Post Office Drawer 4889 Cary, NC 27519 Date of On -Site Investigation (if conducted): N/A Report Prepared By: B. Dee Browder, Environ. Engr. I OCT - 1 2002 DINTSW 7ERq q IU LTYq IU L TY POINTS BRANCH Persons Contacted and Telephone Number: J. Thurman Horne, (704)7884455 Verified Discharge Point(s), List for All Discharge Points: Latitude: 35° 10'40" Longitude: 80° 35'30" Attach a USGS map extract and indicate treatment facility site and discharge point on map. USGS Quad No.: G16NE Site size and expansion area consistent with application? Yes Topography (relationship to flood plain included): The site is in or very near a 100 year flood plain. The existing WWT units are protected from flooding. 8. Location of Nearest Dwelling: Approximately 150 feet form the WWTP site. Page Two PART II - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS 1. Existing Treatment Facility a. Current permitted capacity: 0.130 MGD. b. Date(s) and construction activities allowed by previous ATCs issued in the previous two years: NIA. C. Actual treatment capacity of the current facility (design volume): 0.100 MGD. d. Description of existing or substantially constructed WWT facilities: The existing WWT facilities consist of an influent pump station followed by a bar screen, equalization basin, aeration basin, a rectangular clarifier, tertiary filter, effluent chlorination (tablet) with contact chamber, post aeration, continuous flow recording, a filter backwash holding tank, and an aerobic sludge digester. 2. Type of Proposed Treatment Facility: The applicant proposes to install ultraviolet disinfection (UV) facilities to replace the existing chlorine disinfection facilities as the primary means of effluent disinfection. The existing tablet chlorination facilities will remain in place but will be removed from service, except in the event of emergency wherein the UV facilities become inoperative due to equipment failure, main power supply failure, etc. 3. Residuals Handling and Utilization/Disposal Scheme:Third party permitted contractor. a. Land applied, DEM Permit No.: N/A Residuals Contractor: Telephone No. b. Residuals Stabilization: PSRP PFRP C. Landfill: d. Other disposal/utilization scheme: N/A. 4. Treatment Plant Classification: Class II 5. SIC Code(s): 4952 Wastewater Code(s): 05 Main Treatment Unit Code: 06107 6. Important SOC/JOC or Compliance Schedule Dates: N/A Page Three PART III - EVALUATION AND RECOMMENDATIONS Heater Utilities proposes to install ultraviolet disinfection (UV) at the Ashe Plantation WWTP. This office has reviewed Heater's request; pending a technical review by P&E, it is recommended that an ATC be issued. IRR" OL Signature of Report Preparer baie /?, " 9, 91i sl- z Water Quality Paional Supervisor Date h:\atc\atc00\.etc