HomeMy WebLinkAboutSW6230103_O&M Agreement/Plan_20230523Operation & Maintenance Agreement
Project Name:
Project Location:
Carter Farms Subdivision - Phase 1
Cover Page
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply & coi
Infiltration Basin
Quantity:
Infiltration Trench
Quantity:
Bioretention Cell
Quantity:
Wet Pond
Quantity:
Stormwater Wetland
Quantity:
Permeable Pavement
Quantity:
Sand Filter
Quantity:
Rainwater Harvesting
Quantity:
Green Roof
Quantity:
Level Spreader - Filter Strip
Quantity:
Proprietary System
Quantity:
Treatment Swale
Quantity:
Dry Pond
Quantity:
Disconnected Impervious Surface
Present:
User Defined SCM
Present:
Low Density
Present:
ig O&M sheets will
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Location(s):
Type:
be aciclecl automatica
North Side of Development
I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to
the system or responsible party.
Signature:
County of
Responsible Party:
Title & Organization:
Street address:
City, state, zip:
Phone number(s):
Email:
Rheibeck Investments, L.L.C. - Geoff Becker
Owner/Developer
3727 Legion road
Hope Mills, NC 28348
(910) 426-7575
Mary B. Averette , a Notary Public for the State of
Hoke
, do hereby certify that
personally appeared before me this 22nd day of
May, 2023
acknowledge the due execution of the Operations and Maintenance Agreement .
,G
Witness my hand and official seal, ___3.
AVF
Al
t4OTARy �^=
PUBLIC -
Date: 05/22/23
North Carolina
Daivd Geoff Becker
and
Seal
STORM-EZ
Version 1.5
My commission expires
July 20, 2023
O&M Agreement
5/4/2023
Page 1 of 1
- Phase 1
Cover
V%ing SCM(s). This maintenance record shall be kept in a log in a known set location.
111--Ki—nspection will be corrected, repaired, or replaced immediately. These deficiencies can
safety of the public, and the pollutant removal efficiency of the SCM(s).
WWthis project include (check all that apply & coi
Infiltration Basin Quantity:
Infiltration Trench Quantity:
Bioretention Cell Quantity:
Wet Pond
Stormwater Wetland
Permeable Pavement
Sand Filter
Rainwater Harvesting
Green Roof
Level Spreader - Filter Strip
Proprietary System
Treatment Swale
Dry Pond
Disconnected Impervious Surface
User Defined SCM
Low Density
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Quantity:
Present:
Present:
Present:
O&M sheets v
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
Location(
TYK
acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for
ach SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to
to system or responsible party.
Responsible Party: Rheibeck Investments, LLC. - Geoff Becker
Title & Organization: Owner/Developer
Street address: 3727 Leaion road
City, state, zip:
Phone number(s):
Email:
Signature:
Mary B. Averette
.ounty of Hoke
ersonally appeared before me this
(Hope Mills, NC 28348
(910) 426-7676
, a Notary Public for the State of
, do hereby certify that
22nd day of
May, 2023
:knowledge the due execution of the Operations and Maintenance Agreement.
fitness my hand and official seal, "�
i3. ez��
B • AV
140TARy •.i
PUBLI C _
�!l,Illlll\
My commission expires July 20, 2023
Date: 05/22/23
North Carolina
Daivd Geoff Becker
and
5/4/W
Treatment Swale Maintenance Requirements
Important operation and maintenance procedures:
The drainage area of the grassed swale will be carefully managed to reduce the
sediment load to the grassed swale.
After the initial fertilization to establish the grass in the swale, fertilizer will not be
applied to the treatment swale.
The grassed swale will be inspected quarterly. Records of operation and maintenance shall be kept
in a known set location and shall be available upon request.
section activities shall be performed as follows. Any problems that are found shall be repaired immediately.
SCM element:
Potential problem:
How to remediate the problem:
Remove the trash/debris.
Areas of bare soil
egra e the soil it necessary to remove the gully, re -
sod (or plant with other appropriate species) and water
and/or erosive gullies
until established. Provide lime and a one-time
have formed.
fertilizer application.
Sediment covers the
Remove sediment and dispose in an area that will not
grass at the bottom of
impact streams or SCMs. Re -sod if necessary.
the swale.
The entire length of
Vegetation is too short
Maintain grassed vegetation such that the swale or
the swale
or too long.
vegetated area does not erode during the peak flow
from the 10- ear storm
Determine the source of the problem: soils,
Grass is dead,
hydrology, disease, etc. Remedy the problem and
diseased or dying.
replace plants. Provide a one-time fertilizer
application to establish the round cover if necessary.
woody vegetation are
treatment swale, regrade the treatment swale if
present in the
necessary and re-establish grass as shown on the
Clogging has
Clean out the outlet device. Dispose of the sediment
occurred.
off -site.
The outlet device (if
applicable)
The outlet device is
Repair or replace the outlet device.
damaged
Erosion or other signs
Repair the damage and improve the flow dissipation
of damage have
occurred at the outlet.
structure.
The receiving water
Discharges from the
treatment swale are
causing erosion or
Contact the local NCDEQ Regional Office.
sedimentation in the
receiving water.