HomeMy WebLinkAboutSW6200404_Plansheet C-501 - Misc. Detail_20221123 1 2 3 4 5 6 7 8 9 10
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
1' MIN.
BERM EXCAVATED I l
3MATERIAL ON
0 1.5' MIN. 1 y \y\%\%\�/\�/� DOWNSLOPE SIDE OF
Z \\//\\//\// / / //\//\\//i\/\\\i\\\�\\\/�\\/�\\/�\\/ SWALE
US Army Corps
/�\\\\/,\\\\\\\\\\ \ \ \ \ \\ \\\\\\\\\`\\�� of Engineers
G 6" MINIMUMTHICKNESS
,//��/// / /\\//\\// / ///�
NOTE: INSPECT TEMPORARY DIVERSION ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND W
CDOT #5 2"-3" COARSE #57 WASHEOD STONE REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA IS PROTECTED IS o
AGGREGATE GRAVEL CONSTRUCTION ENTRANCE, PERMANTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT.
NOTES ,ZQ M\N WIDTH AS REQUIRED ° ° ° TEMPORARY DIVERSION SWALE
1 . FILTER FABRIC UNDERLAY SHALL BE INSTALLED BETWEEN STONE AND SOIL FOUNDATION. ° ° ° ° GC NOT TO SCALE
2. TEMPORARY CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED AND MAINTAINED IN STORMDRAIN PIPE SEEDING SCHEDULE
ACCORDANCE WITH SECTION 6.06 OF THE NCDEQ EROSION CONTROL PLANNING AND A (MAX 36" PIPE) A' FORT BRAGG SPECIFICATION (REV. 7, OCT 2013):
DESIGN MANUAL. SEE SHEET C-002 FOR ADDITIONAL SPECIFICATIONS AND MAINTENANCE FLOW 1 . APPLY FERTILIZER/LIME AT RATES AS DETERMINED BY LABORATORY SOIL
CONSIDERATIONS. +i M FLOW CLASS B ANALYSIS OF SOILS AT THE JOB SITE. IN THE ABSENCE OF THE SOIL ANALYSIS,
TEMPORARY CONSTRUCTION ENTRANCE ' RIPRAP APPLY SOIL AMENDMENTS AT THE RATES INDICATED IN STEPS 2 AND 3.
F1 ° ° ° RIPRAP HEADWALL 2. AREA WILL BE TILLED TO 4" DEPTH o
NOT TO SCALE ° 3. APPLY LIME AT 70 POUNDS PER 1000 SQUARE FEET, OR 1 .5 TONS PER ACRE.
F
W A A �S1 ° RIPRAP 4. APPLY 10-20-20 FERTILIZER AT A RATE OF 850 POUNDS PER ACRE OR 20 POUNDS
W p SPOIL F% ° ° ° ° ° ° ° ° ° ° ° ° ° HEADWALL PER 1000 SQUARE FEET. THE FERTILIZER SHOULD BE EITHER SLOW TIME RELEASE w
w 0 OR APPLIED IN TWO APPLICATIONS. HALF AT TIME OF PLANTING AND SECOND HALF
z PLAN VIEW 1' 3' ±10' ° ° AFTER PERMANENT SEED GERMINATES.
0 Q DOUBLE ROW OF NOTES: ° ° 5. THE LIME AND FERTILIZER WILL BE WORKED INTO THE TOP 2 TO 4 INCHES OF SOIL Q
= 0 � PLAN VIEW
0 ui Q VARIES SILT FENCE D4 1 . ROCK PIPE INLET PROTECTION SHALL BE PROVIDE 3' ° ° ° PRIOR TO SEEDING.
El _ ±4 FEET APART C 500 CONSTRUCTED AND MAINTAINED IN WIDE INLET 6. SEED MIX RATE:
= W ° ° ° ° < LOWERED 0.5' PERMANENT SEEDING
ACCORDANCE WITH SECTION 6.55 OF N o ° ° � „ ,,.
FLOW ° ° ° COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 28
3 =_ w THE NCDEQ EROSION CONTROL ° ° CLASS B ° ° 50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA). 0 0
PLANNING AND DESIGN MANUAL. SEE ° ° RIPRAP z � o
25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON). HULLED z o o R
J ll-111=1JJ-lll=ll L JJ L=1 __ SHEET C-003 FOR ADDITIONAL 1n NCDOT #5 OR #57 STORMDRAI�N PIPE 25 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON). UNHULLED o °- ui
SPECIFICATIONS AND MAINTENANCE
NOTE: SECTION A-A CONSIDERATIONS. WASHED STONE (MAX 36 PIPE) W w N N
E SECTION A-A WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST � -j - z - W
1 . CONTRACTOR SHALL LOCATE STOCKPILES AS NEEDED FOR 50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA) � o W z o z [If w
CONSTRUCTION SEQUENCE/PHASING. E4 ROCK PIPE INLET PROTECTION 50 POUNDS PER ACRE COMMON BERMUDA (CYNODON DACTYLON). HULLED -i
2. STOCKPILES MUST BE LOCATED AT LEAST 50-FEET FROM STORMDRAINS, NOT TO SCALE o
WETLANDS AND STREAMS. PERMANENT SODDING o
POIL STORAGE BERM PERMANENT SODDING: ZOYSIA GRASS SOD SHALL BE PROVIDED FOR THE FIRST FIVE FEET OUTSIDE m m o
&§NSIDEWALKS, PARKING AREAS, AND FROM THE FACE OF BUILDINGS. o m o wOT TO SCALE o 0 0 0 0 o z z Y 0
L a POSTS SHALL BE SPACED
TEMPORARY SEEDING u) = Q m w = m w
EVENLY AROUND PERIMETER uw -i Of -1 _ � D N z
"COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER AND FEBRUARY 28 0 o w 0 cn co Q
W/ 4' MAX SPACING. LARGER
NCDOT #5 BOXES MAY REQUIRE MORE 120 POUNDS PER ACRE WINTER WHEAT (TRITICUM SPELTA).
THAN FOUR POSTS.
WASHED
co"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST
a a a a o a Ah, STONE �4' MAX 65 POUNDS PER ACRE GERMAN (SETARIA ITALICA), BROWN TOP (SETARIA ITALICA), OR FOX TAIL MILLET Of (3
19 GAUGE HARDWARE W N c3 o N
(BRACHIARIA RAMOSUM) z v z Q z w
D ,� - -- a a a a a a CLOTH (/4 MESH iz J w 5 � c)
OPENINGS) SECURED w lco > o LU V' `V
a a a a a a STRAW MULCH: APPLY 4,000 POUNDS PER ACRE. THE GROUND SHOULD BE COMPLETELY COVERED WITH NO Q Qf z 0 w
A o o a a a a a a A TO TOP, MIDDLE AND BARE SPOT LARGER THAN A QUARTER, THEN TACKED WITH EMULSIFIED ASPHALT OR BY CRIMPING THE STRAW o 0 0 z uj z z
24" BOTTOM OF POST. a_ o = w -i o w
--- o 0 0 0 0 0 INTO THE GROUND. EMULSIFIED ASPHALT SHALL BE APPLIED AT A RATE HEAVY ENOUGH THAT ENTIRE AREA J Of Q O Q
PLAN VIEW 16�� 2 1 APPEARS BLACK IN COLOR, WITH PARTICULAR ATTENTION TO THE EDGES OF THE AREA, CREST RIDGES, AND Q o uj ° � z
BANKS TO PREVENT WIND DAMAGE. >
� J 0 Z W �
4 4 4 4 4 4
0 4 4 4 4 0 4 I I I I Q > 0 U
24„ EXTENSION OF WIRE I I 1 HYDROSEEDING: HYDROSEEDING SHALL ONLY BE ALLOWABLE ON SLOPES STEEPER THAN 1 HORIZONTAL TO 1 z z
24„
MESH UNDER GRAVEL I I I I NCDOT #5 UNIFORMLY GRADE VERTICAL. STEPS 1 THROUGH 4 MUST BE COMPLETED PRIOR TO HYDROSEEDING. HYDROSEEDING SHOULD BE
FLARED END A7 0 a FOR ANCHORING. (TYP) I I I WASHED SHALLOW DEPRESSION APPLIED IN TWO APPLICATIONS. THE FIRST APPLICATION WILL CONSIST OF 1/3 OF THE MULCH AND 2/3 OF THE
SECTION �07 PLAN - u u STONE APPROACHING INLET SEED AND THE SECOND APPLICATION WILL CONSIST 2/3 OF THE MULCH AND 1/3 OF THE SEED. THE MULCH WILL
5' LG. MIN STANDARD "T" POST
La 5' L MIN OR HEAVIER). SECTION A (ALL SIDES) INCLUDE A TACKIFIER AND WILL BE APPLIED AT A RATE OF 2,000 POUNDS PER ACRE OR THE MANUFACTURERS'
NOTES: RECOMMENDATION, WHICHEVER IS HIGHER.
0 1 . INLET PROTECTION SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.51 OF
SLOPE 0 % FLOW THE NCDEQ EROSION CONTROL PLANNING AND DESIGN MANUAL. SEE SHEET C-003 FOR ADDITIONAL EXEMPTIONS: SPECIAL USE AREAS, SUCH AS WETLANDS, RIPARIAN AREAS, FLOOD PLAINS, GENERAL OFFICER
C - SPECIFICATIONS AND MAINTENANCE CONSIDERATIONS.
QUARTERS AND THE HISTORIC DISTRICT. CONTACT THE FORT BRAGG WATER MANAGEMENT BRANCH (WMB) AT cn
C4 TEMPORARY INLET PROTECTION 910-396-2301/2823/2897 WHEN SEEDING THESE AREAS. z >
NOT TO SCALE O v Lu
HEAVY DUTY UPON COMPLETION OF THE PROJECT PRIOR TO LEAVING THE SITE THE WATER MANAGEMENT BRANCH SHALL
FILTER FABRIC �T` NOTIFY THE PROJECT POINT OF CONTACT: MR. JACK WILSON AT 396-2301/2823/97, EXTENSION 224. < Q
SECTION A-A Pip FT ` IC \' LIFTING STRAPS o 00
F gRFq � (RECOMMENDED) o H
FNp FNPDES STABILIZATION TIMEFRAMES z z
l/ 0
INTAKE c� o
CT�O �Y SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS Q a z
\ N \ \� HOSE O
\ \ cow
FILTER BAG CLAMP PUMP PERIMETER DIKES, SWALES, m � -
\ \� >lx DITCHES AND SLOPES 7 DAYS NONE o o p
PP (TYP) w U
\\ ,,,. _ �I �ARIF RIPR �
HIGH QUALITY WATER (HQW) w
\\ S ZONES 7 DAYS NONE
L FT. d IN.
\\\\
B STRUCT. ID D° (IN.) a ( ) W(FT.) ( ) CLASSLl\ DISCHARGE IF SLOPES ARE 10' OR LESS IN LENGTH
TSD (4) �18" SEE A7 ON C-500 12 B \ PLAN VIEW HOSE SLOPES STEEPER THAN 3:1 7 DAYS AND ARE NOT STEEPER THAN 2:1 , 14 DAYS
FES #100 36 18 9 1 12 B I I� I �� )uc ARE ALLOWED
PUMP
WELL VEGETATED CLAMP INTAKE SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50
ISOMETRIC GRASS AREA (TYP) (TYP) HOSE IN LENGTH. CA� �� �FES�O`��q��'%
NOTES: FILTER BAG ALL OTHER AREAS WITH 14 DAYS NONE, EXCEPT FOR PERIMETERS AND
�10/27/2 � (
ve SLOPES FLATTER THAN 4:1 HQW ZONES SEAL
1 . SEE APPROPRIATE SCHEDULE FOR DIMENSIONS _ ° ° ° 038615
DISCHARGE ,� �
2. La IS THE LENGTH OF THE RIPRAP APRON. SLOPE 15.0 TO 20.0 NOTE: TEMPORARY SEEDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION w
r HOSE 6.10 AND PERMANENT SEEDING SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION
3. d = 1 .5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". FILTER FABRIC 8" OF #5 OR ,, T ��,��`�� >
4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL ELEVATION VIEW #57 STONE 6.11 OF THE NCDENR EROSION CONTROL PLANNING AND DESIGN MANUAL. SODDING SHALL BE 0
FOUNDATION. NOTES: INSTALLED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.12 OF THE NCDENR EROSION CONTROL Q
A 5. RIP RAP SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH SECTION 6.41 OF THE NCDEQ 1 . WOOD PALLETS MAY BE USED IN LIEU OF STONE AND GEOTEXTILE AS DIRECTED. PLANNING AND DESIGN MANUAL AND PROJECT SPECIFICATIONS. SEE SHEET C-002 THROUGH C-004 FOR 0
EROSION CONTROL PLANNING AND DESIGN MANUAL. SEE SHEET C-003 FOR ADDITIONAL 2. SEE SHEET C-004 AND 2012 NCDOT STANDARD SPECIFICATIONS, SECTION 1639, ADDITIONAL SPECIFICATIONS AND MAINTENANCE CONSIDERATIONS. SHEET ID
SPECIFICATIONS AND MAINTENANCE CONSIDERATIONS. FOR ADDITIONAL SPECIFICATIONS AND MAINTENANCE CONSIDERATIONS. C-501 0
RIP-RAP OUTLET/INLET PROTECTION A4 PUMPED WATER FILTER BAG A7 VEGETATION/STABILIZATION SCHEDULE Q
Al NOT TO SCALE NOT TO SCALE LLI
NOT TO SCALE
CONTROLLED UNCLASSIFIED INFORMATION (CUI)