HomeMy WebLinkAboutNCC201590_Annual Fee Paid Email_20230524Holloman, Tevye L
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Wednesday, May 24, 2023 11:31 AM
To: Kenny@SunEnergyl.com; accounting@sunenergyl.com
Cc: Holloman, Tevye L; Georgoulias, Bethany; environmentalreport@sunenergyl.com
Subject: [External] Construction SW General Permit Annual Fee Resolved - NCC201590
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Dear Construction General Permit Permittee:
This email is to notify you that the 2023 annual fee for Certificate of Coverage (COC) no. NCC201590 has been resolved.
If the permit remains active, it has been successfully renewed (as long as all other annual fees have been paid). If the
permit is no longer active, no future fees will be required.
This COC is for Albemarle Beach Solar Farm - Tree Clearing in Washington County, issued to Albemarle Beach Solar, LLC.
This communication is in reference to Invoice no. NCC201590-2023.
If you have any questions, please contact the Stormwater Program at (919) 707-3649, or visit https://deg.nc.gov/NCG01.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.