HomeMy WebLinkAboutNCC231591_Site Plan or Location Map_20230524 �••, •stl- �.'!- ..s' :/ .tr,�� .````/s t; - CONSTRUCTION SCHEDULE the needed depth.Soil from installs..For soft.loamy soilsplat d o Me htreorh Fosum EROSION CONTROL CONSTRUCTION SEQUENCE(SENSE AS NECESSARY TO ADDRESS SITE SPECIFIC ISSUES) SEEDING SCHEDULE Pa to score `�.jip w fit/i\-,`,•,fit SODDING 1. Obtain all necessary permits and plan approvals of the trench to.used during WATTLE 'n _ 1. INSTALL TEMPORARY CONSTRUCTION ENTRANCE. NOTE TEMPORARY SEED Mlx SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN WE WEEK AND SUBJECT TO FURTHER DISTURBANCE. I 2. Install gravel construction entrances first,and then reinforced silt fence outlets, saran bey Using nma 2, INSTALL TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON PLAN. 4 ``a���� '� :1/III wattles and Siff fences. 2. Lay the.straw wattle snuggIY M.O..,No aH seehw�enbi�set�ell"Pnderthe Wegtne 3, CALL FOR ON-SITE INSPECTION BY TOWN OF SOUTHERN PINES CONSTRUCTION INSPECTOR. ADEQUACY ON JULY 15. i II / 1� �. '\ ItI �' 3. Finish clearing and rubble aareas on the lots as the are started. o NOT w ends. 4. INITIATE GRUBBING AND TOPSOIL STRIPPING OF THE SITE. AN PERMANENT EECOVER SHALL HAVE HSO SPRIGS OF BERMUDA OR sERILEA LESPEDEZA PER ONE SQUARE FOOT. g g any necessary y r stake me strew wattles at each end and tour root on center R 5. AS CONSTRUCTION PROGRESSES, REMOVE SILT AND SEDIMENT BUILDUPS AT ALL MEASURES TO MAINTAIN \ / 1' 4/// ,' 4. Begin lot grading and excavation activities PEre 1� Al,7 .rr//�/ ADEQUATE EROSION CONTROL. TEMPORARY SEEDING RECOMMENDATION for SUMMER(TO BE FOLLOWED BY PERMANENT FALL SEED MIX) �. � 5, Begin continueWith houseconstruction activities. 6. WITHIN]CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING AND ON SLOPES GREATER THAN 3:1 \ O� i1 ��\•^'�;��14F� �/ swewomw..,o.«r. 6. Finish all rough grading and house construction. s through the mlaalemlbe wattle,leaving 2a lncbesmme stake Q- \j GROUND COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT GROUND COVER SHALL BE PROVIDED SPECIES RATE(LB/ACRE) i. P' • �I\�i°��Sr,Ijd \ ]. Install driveways,walks antl patios. FOR ALL DISTURBED AREAS WITHIN 14.:ALENDAR DAYS FOLLOWYNG COMPLETION OF CONSTRUCTION Oft APR. 5-AUG.I5 GERMAN MILLET40 QO ►' t� IIj� � I�t�11t��1rtl�jl 4A B. Beginfnegrading of lot areas map kenani wattle. In«ae lo9n YaVkathrough we wade up straw SOIL AMENDMENTS• A Q v liAlliDEVELOPMENT. i P\ /I: F-Q IIXY'���✓ ..==..o.�•�,,.. 9. Final grassing,mulching and stabilizing of lot. a most cases this will involve the wattles are used wanlea on sb asf tlnrlve'9he eakeround sPllw eontllwlsrat the a tM¢Ives atragnl down:wren Inslelling ] CINJ TINUE WYTIi FINE GRADING OF SITE. APPLY 2,OW LB/ACRE GROUND AGRICULNRAL LIMESTONE and 750 LB/ACRE 10-10-ID FERTILIZER OR FOLLOW RECgAMENDAmONG .-....,/- ? r`�/ �1� \ w s installation of sod on the lot.The sill fence will remain in place until the lots are P PAP Po B INSPECTION BY TOWNOF SOUTHERN PINESCONSTRUCTION INSPECTOR.IAREAS STABILIZED, CALL FOR ON-SITE OF SOUL TESTS. i �� sodded or grassing is sfablllzed and takes hold. 4 e at an ansle lowam tna nml waMe in Omar 9. IF SITE IS APPROVED,REMOVE TEMPORARY EROSION CONTROL MEASURES AS DIRECTED, SEED,FERTILIZE AND MULCH � W 10.Inspection and foal acceplence letters rock slopesto help abut. bar needed a trio Ne stake nae�aWke into axo-enrey Kara or MULCH RESULTING DISTURBED AREAS.CLEAR ALL DEBRIS AND SEDIMENT ACCUMULATION.ESTABLISH PERMANENT APPLY a.OW LB/ACRE GRAIN:105:: 4,,,, FERTILIZE AND MULCH IMMEDIATELY FOLLOW9NC EONoe OTH •, A"SELF (TO BE FOLLOWED tr'�w'➢ AVA UBt TAIYE�� `' + 1. SEED BED PREPARATION SOIL AMENDMENTStill _ .� _ APPEARANCE OF GOOD SOD COMPLETING,DATING AND SIGNING PN INSPECTION REPORT THAT LISTS EACH MEASURE.PRACTICE OR, ' �/ STRAW WATTLE:SHOWN IN 2'DEEP TRENCH /ACRE GROUND AGRL LIMESTONE and 1,000 LB/ACRE 10-10-10 FERTILZER OR FOLLOW RECOMMENDED SOIL �•+�{I 2. RIP THE ENTIRE AREA TO 6 INCH DEPTH. TESTS, 'fA�' ■ �/ r (I 1 -4'--4'--A'--4'- 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND R 'r�■ .` I GI I ', , STAKE UNIFORM. MULGf ■ III /0 APPLY 4,OW LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. O .�� , /• - • III IIII IIIII'l II��� oEw J D 4. APPLY AGRICULTURAL LIME,FERTILIZER AND SUPERPHOSPHATE IN ACCORDANCE WITH"SEEDING SCHEDULE"AND ANCHOR STRAW BY ROVING.NETTING OR BY TACKING N1TH ASPHALT EMULSION AT A RAIL OF 400 GAL/ACRE II l YYY 144 - a.aa�e. MIX WITH SOIL. M •O 4 •V I OI F1 5. CONTINUE TILLAGE UNTIL AWELL-PULVERIZED FIRM REASONABLY UNIFORM SEED BED IS PREPARED 4 TO 6 - '` -' o[mExm.".. .�111 �IQ,j�OI "IV* 5� s� I•I INCHES DEEP. MAINTENANCE E sE FEeftua 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK L Y DARES EXTEND TEMPORgRLYZcovERa BEYOND ARDEA IMMEDIATELYe i�DRWETMS aTHe 0 LBCFE ACRE OBr ESPEOE IN MARCH,IF IT IS N NECE OR SSARY nis 0111 '. ."i NW AFTER SEEDING.SEED ACCORDING TO"SEEDING SCHEDULE / - cw..ioaooa".ouoo� / o.c•sw... MARCH. 4 sDx.. ] MULCH IN ACCORDANCE WITH"SEEDING SCHEDULE"IMMEDIATELY AFTER SEEDING. TO . �`' .\O/ / B INSPECT ALL SEEDING FOR COMPLIANCE W11H THE REQUIREMENTS OF THE"SEEDING SCHEDULE".MAKE NECESSARY TEMPORARY SEEDING RECOMMENDATION rot LAZE WINTER Ana EARLY SPRING(TO BE FIXLOW£D BY PERMANENT FALL SEED MIX) / ^j / REP AIRS AND RESEED G THE THIN THE PLANTING SEASON. IF POSSIBLE. OR THE DAMAGED AREA SHALL BE SPECIES RATE(LB/ACRE) REESTABLISHED FOLLOWING THE ORIGINAL LIME,FERTILIZER AND SEEDING REQUIREMENTS. DEC 1-APR.15 TER RYE(GRAIN)120 CAROPIN�VENTURES,LLC ANNUAL KOBE LESPEDEZA 50 VICINITY MAP I ( ` 36 OMIT LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. 3j\ D.B.411�,-�G.260 �6 _ SOIL AMENDMENTS (N.T.S.) I II \ p\\ - \ .y� cs \ OF SOB TESTS. SLB/ACRE GROUND AGRICULNRAL LIMESTONE and 750 LB/ACRE 10-10-10 FERTILIZE OR FOLLOW RECgAMENDAiIONS J \ c,+\ \ ` L?O,\ I MULCH 'YI \\ \ �\ APPLY 4.000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. \ N\ -3]8 \ ( \\\ ANCHOR STRAW BY ROVING,NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RATE OF 400 CAL/ACRE MAINTENANCE // \� - 3 \ \ \ \ \\ 6\ \\ DAMAGE. IF GROWTH IS NOT FULLY ADEQUATE RESEED,RE-FERILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER 4 \ \ \ 66 PERMANENT SPRING SEED MIX ACRE)`'o` 2 5 \\ 1\ M E DDA 3D 6 RILEq LLSP DE2A3D \ sc•C��18___ j4 \ I LB Ae - F� 1 PERMSPECIES'R" oBMONEED ALftRM General Erosion Control Notes 1 �\ w \ PiSERICEALESPEDEZA(UNSSARIUFIED)30 1.Only the areas shown shall be disturbed. 3- ------ \ ln\q \ Iv ) KDBE LESPEDEZA ID 82 \ �/`\ �v V A O Oh/1�� / I I WATER 2.All disturbed areas shall be grassed and mulched as soon as __--- \ \ \ \ \ I /�(// / 7 / IOU INIMUM OF 1 INCH OF RAINFALL A WEEK OF NOT SUPPLIED NATURALLY,CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNIX possible and maintained until permanent cover is established. _---- \\ \ 4 I \ I / / / I01 GROUND COVER HAS BEEN ESTABLISHED. rr�� ,F�. / / / I I J 19 _ 378 \\\ ,��~, /) Oi�// / / 1 NOT TO SCALE EROSION CONTROL SEQUENCE NOTToaN -- '� / .�/A�. r` / TOWN OF SOUTHERN PINES TOWN OF SOUTHERN PINES EROSION CONTROL \��� •_{ / I I Y�f I / SEEDING NOTES E-1 SEEDING NOTES E-2 {��� l ' �' BATE RY:n SATE NMART ena 374 a Q ��`� / I ' '�Op� I I ( l \ \ it. ?St' 32 l �d1r II ` \ems \ >� 31 l i G0 o \\ J 1 \ 17 I \ a'MAXH hI // /� 1 o o ''J 374 \\ v ° >>° _ CAROPINE VENTURES,LLC O MIN.1z-1/2 GA. / \ / �.. 0. INTERMEDIATE \ \ MIN.10 GA. cA� WIRES \ \ 16 / //� / \\ \ \ ���-D B.4198,PG.260 - /'/ LINE QUIRES ...7777� -_ M // 4G O"+040�x�Cb fl°W-..•..•3A a1 •�� ���KI� GRADE VJ' - // Q \ \ \\�� // io bee�0�ti���e°�°e�Ac��•: 29 // \ v \ / / e o O;ot i 0�9•.' A. z 1i� - // / \ \ J / Provisions ground cover on exposed slopes must be x � Z2 '' NNN \\ / \ \ ---- // accomplished within 21 calendar days following completion of any I�' IC /\ 15 y6- 4,28 \\ --__ / / /// phase of grading. 3 s 12 7- ----- \ - ��� // Provisions for permanent ground cover sufficient to restrain q, I \ \ ---- / erosion must be accomplished for all disturbed areas within 15 FRONT Waco � / � 6 \ c,L( // / working days or 90 calendar days following completion of / -- \ N\ i / construction or development,whichever is shorter. STEEL POST NOTE: `� • / \ e o f14- --- _ - 11\\ \ - / USESILT FENCEONLYWIZ � /WOVEN WRE FABRIC DRAINAGE AREA DOES NO / \ .pi 1IIIIII EXCEED 1/4 ACRE AND / 13\\ F'aY A \ 03 /// / For HOW ZONES,ground cover shall be provided within 15 SILT FENCE FABRICNEVER IN AREAS DF / N /".C'5 o, ' / working days or 60 calendar days following completion of CONCENTRATED FLOW / - // - I / \ 3'A_-___- i•") \\ 'II,_- // construction or development,whichever is shorter. FILL SLOPE _ / 1LGRADE _ Lot Plan I \I _-' "D" ) vv GROUND STABILIZATION ✓' rc, • \ 35D SITE AREA STABILIZATION " FOR REPAIR OF SILT ro I /,' 8"MIN.COVER 6 _--- _.f-Y. / \ \ ' / DESCRIPTION TIME FRAME FENCE FAILURES,USE AIII II OVER SKIRT+' V ,(Jae / \ \ f / EXCEPTIONS No.57 WASHED STONE. N r / I•_ ' 1 3 PERIMETER DIKES. 7 DAYS NONE 2 `) p SW ALES,DITCHES FOR ANCHOR WHEN SILT k ANCHOR SKIRT AS \\ 7 / L5 25 ��- - U� ) \ t �// / &SLOPES FENCE IS PROTECTING t DIRECTED BY ENGINEER• \ / -- '�J�Ar I \ \ / / HIGH QUALITY WATER ZONES J DAYS NONE CATCH BASIN. IIIIII! �\` / ----3_4E - ---- ---- 6. ) ( I (HOW) MIN. i- -----_- *.(+ CONSTRUCTIO / 14 I \ \ I SLOPESNS STEEPER 7 DAYS IF SLOPES SLOPESSARE S IN \ /�0 LIMITS I \ \ / LENGTH AND ARE _ I \ NOT STEEPER /� t / THAN 2:1,14 SIDE NEW \ / // / -_-__ --- 4z �i - 24 -_--- -� - II \ \\ ) DAYS ARE ALLOWED / ----- \ SLOPES 3:1 OR 14 DAYS J DAYS FOR \ / / --- ) 1 \ / FUTTER SLOPES GREATER NOTES&MAINTENANCE- \ / // ---- - / I I f THAN 50'IN 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL MAKE ANY REQUIRED REPAIRS LENGTH IMMEDIATELY. / / ------ ------- - I I / ALL OTHER AREAS 14 DAYS NONE(EXCEPT 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE,TEAR,DECOMPOSE OR BECOME INEFFECTIVE,REPLACE IT / _- )� WITH SLOPES FOR PERIMETERS PROMPTLY. I / �' _-. --- Yf __ ) I FLATTER THAN 4:1 AND HQW ZONES) 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND ( 1 6 23 -- `'�� J I REDUCE PRESSURE ON THE FENCE TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. \ /( 4. REMOVEIALL FENCINGTER MATERIALS AND UNSTABLERAI SEDIAEHT DEPOSITS ANDE BRING THE AREA TO GRADE AND \\\2� \ I \ / }� --_ ----------- ��� \\\ / STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 1 \ ..(fS• 5. REMOVE SEDIMENT DEEPER THAN 12". \ s� NOTTOSCA e 40\l \' lase - � L�� ----- ---- - -1 - ' \ PAGE 1 of 2 TOWN OF SOUTHERN PINES TEMPORARYDETAILT FENCE E-6 \A 1 ( / -jc�*" 22 / \\ / \ TOTAL DISTURBED ACREAGE:0.25 ACRES BATE. JANDARTzrea C U T* 1 / \-./ / 1 / _ LOT EROSION CONTROL PLAN j \ i (421 49 - l •)-4 CAROPINES PHASE 12 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION A. ( FLOW TO THE REAR ) B. ( FLOW TO THE FRONT ) C. ( FLOW TO THE LEFT) D. ( FLOW TO THE RIGHT ) E. ( FLOW TO THE FRONT& REAR ) / Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic Topdressing PROPER,UNE NE LINE FOR with 2-Inch stone.After each rainfall,Inspect any structure used to Tap sedIment and clean k out ae necessary. Immediately remove all objectionable materials spilled,washed, rx 61��°P`rNtE"` \x SILT FACE alr"°`� -1 F. SILT Fi- DREAM FINDERS HOMES LLC or tracked onto public roadways. rum Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric x LOT f LOT + - « LOT LOT y LOT t I should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall limes.Take care to not undermine The fence during deanoul operations. x LA o MOOSE CO. N.C. McNEILL TWP. Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate p w moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth and stabilization of the root bed.The H 0>C 5 o" B B Y MAY 2023 SCALE: 111=60' sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. buss HOUSE HOUSE 00000 HDUNE Grassing and Mulching-The area to receive grassing and mulching should be propedy fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has GRAPHIC SCALE been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be repaired,and reseeded as soon as possible.If the - - - a n time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. ENTwwcE ENTRANCE EmRAxcE ENTRANCE EumM+cE 60 0 30 60 120 240 General-All measures will be Inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction N f N u OW N y col a activities on any particular lot do not adversely affect any of The installed erosion control measures.If lot construction dictates,measures will be relocated on the lotto insure that the w In I �1•. ♦ �j s!, +w- � �(y m 11 potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested In the erosion control manual. r !• e e L x �� . R R/w x �.^' R/w e L 5E= -J R R w x Lck._J':" Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. •..•• ... •••-. N FEET woes inspected after removed nt when evimsRills ch s one-third supslof the thwattles wattle Gund nny freeboard heiiht.Remoe ved dimeit Sediment deposits at withr in the l inch = 60 ft. filtration capability of the waffle shall be removetl when the sediment reaches one-Uird of the war0es functional height.Removetl sediment shall be deposited within the STREET STREET STREET STREET STREET project in such a way that the sediment is not subject to erosion by wind orwater. MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.28305 Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take cam to avoidundernining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all fencing materials and unstable Rse R " "/" R/5 PHONE(910)484-5191 FAX(910)484-0388 LICENSE#:F-0106 sediment deposits and bring the area to grade and stabilize it after after the contributing drainage area has been properly stabilized. ): CONTROL DETAIL FOR SINGLE FAMILY LOTS -(N.T.S.) ) UST SAVED:5/1/2023 2:24 PM LAST PLOTTED:5/1/2023 2126 PM PLOTTED BY.Dennis Gilbert eLENAME:G:\CURRENT JOBS\H&H CONSTRUCTORS\I6-1367-01 CAROPINES-EC\PLANS\CAROPINES PH-12 LOT 12.DWG