Loading...
HomeMy WebLinkAboutSW6140302_Renewal Application_20230224 DEMLR USE ONLY Date Received Fee Paid Permit Number NC DEQ Division of Energy, Mineral and Land Resources kECEIVE® STATE STORMWATER: rEB 2 4 2023 PERMIT RENEWAL APPLICATION FORM DEMLR-StormwaterProgram In accordance with 15A NCAC 2H.1045(3) the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 6 years per Session Law 2011-396 (SB 761) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW6140302 2. Project name: West Hampton Phase 11 3. Project street address: West of: 5001 Woodspring Dr City: Hope Mills _ County: Cumberland ZIP : 28348 4. What, if any, changes have been made to the project as permitted? No changes If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc.goviabout/diyisionsienergy- mineral-land-resources/energy-mineral-land-rules/stormwater,program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: htt s:lld .nc. ov!ab--ut/divisionstener^ y-mineral-land- resourceslener -mineral-land-rules/stormwater- ro ramf ost-construction. State Storm water Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: GHM Group, LLC 2. Signing Official's Name: Lorraine Mohler 3. Signing Official's Title: Manager/Member 4. Mailing Address: _2148 Rim Road, Suite 107 City: Fayetteville State! NC ZIP : 28314 5. Street Address: Same City: State: ZIP : 6. Phone: (910) 303-1507 Email: lorrainemohler mohlerinvestments.com Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non-Coastal HQW/ORM. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: CJP 1. A permit application processing fee of$505.00 payable to NCDEQ. CJP 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation—a principle executive officer of at least the level of vice-president; b. Limited Liability Company(LLC)—a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity—a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership—the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a—e above authorizing the signature of another entity. CJP 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominiumlplanned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. CJP 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ® I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. CJP 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ® The project has not yet been built. NA 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. CJP 7. [IF APPLICABLE]When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https:i/w_ww.sosnc.govlonline servicesisearchiby title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION 1, �C�rrec�%!,e­ P�/10 )- yam_ , the person legally responsible for the permit, certify that I have a copy of the Permit and 0&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. l agree to notify DEMLR of any problems with the SCMs or built-upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature: - Date: �d 2b Z 2> NOTARIZATION: _ 1� 1 SCa f ov o a Notary Public f f or the State o oA l%dok,N% , County of_ - Sa.4h��S a+� do hereby certify that Lo,r>rairte personally appeared before me this the 3 6 day of ���.r� 20 Z3 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Sea]) 0�q�y Notary Signature: PUBS- My commission expires lb-4 fO ZS 9 pSpN C 111111111/1 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018