Loading...
HomeMy WebLinkAbout2023-05-23 EMH Farm_Credit Release Request Form (DWR Project 2022-1493 v1)V, CLEARWATER MITIGATION S O L U T z O N S 05/23/2023 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Kevin Yates (clearwatermiti atg ionkgmail.com / 919-624-6901) Through: Clearwater Mitigation Solutions, LLC We formally request a credit release for the EMH Farm Buffer Mitigation Bank Parcel (DWR ID# 2022-1493v1) for completion of Task # 1, 2, and 3 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task # 1, 2, and 3 and are pending review: 1) EMH Farm Project Credits Table provided with As -Built submitted on 05/18/2023. 2) Approved Credit Release Schedule from Approved EMH Farm MBI. Credits requested for release are detailed below: Credit Type % Release Credit Amount Notes/Comments (include Units) Buffer Restoration 50% 327,079.098 Per Completion of Tasks 1,2,3 Buffer Preservation 50% 4,570.562 Per Completion of Tasks 1,2,3 Buffer Enhancement 50% 7,499.121 Per Completion of Tasks 1,2,3 Generated Nitrogen Nutrient Offset Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Nitrogen Nutrient Offset Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: � c Attachments: 1) Approved Project Credit Table (include the most recent Asset Table approved by DWR, whether it is the BPDP table or the As -Built table), 2) Approved Credit Release Schedule Include the approved credit release schedule, whether it is the credit release schedule from the MBI/UMBI or from the BPDP. Clearwater Mitigation Solutions 604 Macon Place. Raleigh, NC 27609 919-624-6901 *clearwatermitigation@gmail.com ���\ T T T T 1. } 4 64 o /\)!!!! !!! is \\\ ƒ|! TIN" E !! ! ) ---! ))E }/) ! wl wl w !!f \ \zo {d!!!= 7]§ y3J»§J 3 ( | ! � !!..comz'o ` )|;|�� `® k § Vill. Credit Release Schedule A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that the Riparian Buffer Credits associated with the Bank Parcel will become available for sale to a third party in accordance with the Credit Release Schedule in Table 3 below: Table 3: Credit Release Schedule for Riparian Buffer Credits Task Milestone Credit Release (%) Instrument & BPDP approved by DWR, Conservation Easement 1 Recorded*, & Financial Assurances Posted o 20/ All Riparian Earthwork & Mitigation Activities, Planting and Installation of 2 Monitoring Devices completed, easement boundaries adequately 20% marked, all applicable permits obtained, site visit performed by DWR 3 Monitoring Financial Assurance Posted & Approval of As -Built Report 10% Monitoring Report #1: Approved by DWR** & Financial Assurance 4 Renewed 10% Monitoring Report #2: Approved by DWR** & Financial Assurance 5 Renewed 10% Monitoring Report #3: Approved by DWR** & Financial Assurance 6 Renewed 10% Item B(1) of Section X in this Instrument has been complete & approved 7 by DWR 5% No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship Monitoring Report #4: Approved by DWR** & Financial Assurance 8 Renewed 5% Monitoring Report #5: Approved by DWR** & Project Closeout approved 9 by DWR 10% Total 100% * For specification, see Section V in this Instrument ** DWR approval provided upon a determination that the site is meeting success criteria contained with the approved BPDP B. DWR may modify the Credit Release Schedule based on the information submitted or the order in which required information is received. DWR will notify the Sponsor of any modification to the credit release schedule. C. Any major deviations to the Bank Parcel that were not authorized in writing by DWR prior to implementation may affect the amount of riparian buffer credits that will be generated by the Bank Parcel. 9