STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCRORY
GOVERNOR
Jtme 12, 2015
U. S. Army Corps of Engineers
Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
ATTN: Mr. David Bailey
NCDOT Division 7 Project Coordinator
ANTHONY 1. TATA
SECRETARY
Subject: Application for Section 404 Nationwide Permit 14 and Section 401 Water Quality
Certification for replacement of Bridge No. 110 over Wolf Island Creek on SR 1767
(Mayfield Road), Rockingham County, North Carolina, Federal Aid Project No. BRSTP-
1767(5), TIP No. B-5341.
Debit $240.00 from WBS Element No. 46055.1.1
Please find enclosed the Pre-Constcuction Notification (PCN) fonn, stormwater management plan, permit
drawings, and roadway design plans for the above ►•eferenced project. �
The proposed let date for the project is Janiiary 19, 2016 with a review date of December 1, 2015.
However, the let date may advance as additional funds become available.
A copy of this pe►•mit application and its distribution list will be posted on the NCDOT website at
https://connect.ncdot.�ov/resources/Environmental/Pages/default.aspx . A copy of the PCE
(Programmatic Categorical Exclusion) is also available at the above website address. Thank you for your
time and assistance with this project. Please contact Deanna Riffey at either driffey_(a),ncdot..o�v or (919)
707-6151 if you have any questions or need additional information.
Sincerely,
' � 1.�
'� �
,� Richard W. Hancock, P.E. Manager
-� .�
Project Development and Environmental Analysis Unit
Cc: NCDOT Permit Application Standard Distribution List
�7AILING ADDRESS:
NC DEPARTMENT OPTkANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
NATURAL ENVIRONMENT SECTION
1598 MAIL SERVICE CENTER
R.ai,E�cii NC 27699-1598
TELEPHOhE: 919-707-6100
FAX: 919-212-5785
IVER.S/TE: IVli'IY. NCDO'f. ORC
PHYSICAL ADDRESS:
Cenhuy Center - Building B
1020 Birch Ridge Dr
Raleigh, NC 27610-4328
��oF w a r�9Q�
� �
5 �
P Y
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
� 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
❑ Yes � No ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No
2. Project Information
2a. Name of project: Replacement of Bridge No. 110 over Wolf Island Creek on SR 1767
2b. County: Rockingham
2c. Nearest municipality / town: RufFin
2d. Subdivision name: not applicable
2e. NCDOT only, T.I.P. or state g_5341
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. not applicable
3c. Responsible Party (for LLC if not applicable
applicable):
3d. Street address: 1598 Mail Service Center
3e. City, state, zip: Raleigh, NC 27699-1598
3f. Telephone no.: (919) 707-6151
3g. Fax no.: (919) 212-5785
3h. Email address: driffey@ncdot.gov
4. Applicant Information (if different from owner)
4a. Applicant is: ❑ Agent ❑ Other, specify:
4b. Name: not applicable
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: not applicable
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): not applicable
1 b. Site coordinates (in decimal degrees): Latitude: 36.481497 Longitude: - 79.558195
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 0.89 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to �/�/olf Island Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Roanoke
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Land use within the vicinity is predominately residential and agriculture with forestland along stream corridors.
3b. List the total estimated acreage of all existing wetlands on the property:
0 acres
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
70 linear feet
3d. Explain the purpose of the proposed project:
The bridge is considered to be structurally deficient due to superstructure condition and functionally obsolete due to
stru ctu re.
3e. Describe the overall project in detail, including the type of equipment to be used:
The project involves replacing the 175 foot long bridge with a 190 foot long bridge which includes two 11 foot lanes and
two 4 foot 3 inch offsets. Approaches will be widened to include two 11 foot lanes with 6 foot shoulders. The proposed
project is approximately 0.123 miles long. Standard road building equipment, such as trucks, dozers, and cranes will be
used.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained fo�r this property / � Yes � No ❑ Unknown
project (including all prior phases) in the past.
Comments:
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
6b. If yes, explain.
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact
number — Type of impact Type of wetland Forested Type of jurisdiction Area of impact
Permanent (P) or (if known) (acres)
Tem orar T
Site 1❑ P � T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 2❑ P❑ T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 3❑ P � T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 4❑ P � T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 5❑ P � T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
Site 6❑ P � T Choose One ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts �
0
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of Average �mpact length
number - (PER) or jurisdiction stream (linear feet)
Permanent (P) or intermitte (Corps - width
Temporary (T) nt (INT)? 404, 10 (feet)
DWQ—
non-404,
other)
Site 1❑ P� T Dewatering Wolf Island Creek � PER � Corps 30 34
❑ INT ❑ DWQ
Site 1� P � T Bank �/olf Island Creek � PER � Corps 30 42
Stabilization ❑ INT ❑ DWQ
Site 2❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site ❑ P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site ❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
Site ❑ P � T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 42 ft Perm
34 ft Temp
3i. Comments:
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of
impact number— waterbody Type of impact Waterbody Area of impact (acres)
Permanent (P) or (if applicable) type
Tem orar T
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts X Permanent
X Temporary
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction roposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or (acres)
number purpose of pond Flo
Flooded Filled Excavated ode Filled Excavated Flooded
d
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer
impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason for impact Buffer Zone 1 impact Zone 2 impact
Permanent (P) or Stream name mitigation (square feet) (square feet)
Temporar T re uired?
B1 ❑P❑T ❑Yes
❑ No
B2 ❑P❑T ❑Yes
❑ No
B3 ❑P❑T ❑Yes
❑ No
6h. Total buffer impacts
6i. Comments: Buffer impacts for this project are less than 40 linear feet for the road crossings and are exempt.
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The bridge is being built at the same location and will be a longer bridge that provides more hydraulic opening. An offsite
detour will be used for traffic. One stormwater outfall is proposed in conjunction with a riprap pad to dissipate the energy.
Other than no build the minimal effects on this project is unavoidable.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
NCDOT Best Management Practices for Construction and Maintenance Activities and Best Management Practices for the
Protection of Surface Waters will be employed.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes � No
impacts to Waters of the U.S. or Waters of the State?
If no, ex lain:
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this
project? ❑ Payment to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: not applicable
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes � No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If not, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? � Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
See attached permit drawings.
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
� DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? not applicable
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
apply (check all that apply): ❑ USMP
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No
attached?
4. DWQ Stormwater Program Review
❑ Coastal counties
4a. Which of the following state-implemented stormwater management programs apply ❑ HQW
(check all that apply): ❑ ORW
❑ Session Law 2006-246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ❑ Yes ❑ No n/a
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? � Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met? � Yes ❑ No
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State � Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) � Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes
additional development, which could impact nearby downstream water quality? � No
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Due to the minimal transportation impact resulting from the replacement of this bridge, this project will neither influence
nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
not applicable
10
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or � Yes ❑ No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No
impacts?
� Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
NC Natural Heritage Program data and USFWS website. No Effect/ No habitat present calls were made for James
spinymussel and Roanoke logperch after NCDOT biologist conducted aquatic surveys. No EffecU Habitat present call
was made for smooth coneflower. Last field survey done for smooth coneflower was in May 2015.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation � Yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NEPA Documentation
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No
8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination? FEMA Maps
� Richard W. Hancock, P.E. ��
�-�- , , ----- -=--y _ l2.ZO/S
Applicant/AgenYs Printed Name � �
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization leiter from the applicant
is rovided.)
11
Hi�;hway North Carolina Department of Transportation �
Stormw�ter M
,,,,,.,,�,,, Highway Stormwater Program �_�
STORMWATER MANAGEMENT PLAN
(Version 2.01; Released December 2014) FOR NCDOT PROJECTS
WBS Element: 46055.1.1 TIP No.: B-5341 County(ies): Rockingham Page 1 of 1
General Project Information
WBS Element: 46055.1.1 TIP Number: B-5341 Project Type: Brid e Replacement Date: 3/25/2015
NCDOT Contact: Bill Zerman Contractor / Designer: Frank Fleming, PE - Ecological Engineering
Address: 1020 Birch Ridge Drive Address: 1151 SE Cary Parkway
Raleigh, NC 27610 Suite 101
Car , NC 27518
Phone: 919-707-6755 Phone: 919-557-0929
Email: bzerman@ncdot, ov Email: fflemin @ecolo icalen .com
Cit /Town: Ruffin Count (ies): Rockin ham
River Basin(s): Roanoke CAMA Count ? No
Wetlands within Project Limits? No
Pro'ect Descri tion
Pro'ect Len th lin. miles or feet): 0.12 Miles Surroundin Land Use: Rural area with forest and agricultural landuses
Pro osed Pro'ect Existin Site
Pro'ect Built-U on Area ac. 0.4 ac. 0.3 ac.
Typical Cross Section Description: 2@ 11 ft lane, 4.3 ft shoulders, with total bridge width of 33.0 ft and total bridge length of 2@ 11 ft lane with total bridge witdh of 22 ft and total bridge length of 175 ft.
190 ft.
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 800 Year: 2040 Existin : 720 Year: 2016
General Project Narrative: State Project 46055.1.1 involves the replacement of the existing NCDOT Bridge #110 on SR 1767 over Wolf Island Creek. Bridge #1110 consists of 5@ 35'-0" concrete deck
(Description of Minimization of Water on timber piles with concrete caps. The proposed bridge at #110 will be 1@90', 1@100' 39" Box Beam with 4' caps and sloping abutments. The proposed bridge is located in
Quality Impacts) zone AE of FIRM map number 3710892800J and was studied by "Limited Detailed" methods. The proposed bridge will provide more hydraulic opening than the existing bridge.
Deck drains are proposed on both sides of the bridge to meet spread design criteria. One stormwater outfall is proposed along with a Rip Rap pad to dissipate the energy.
Waterbod Information
Surface Water Body (1): Wolf Island Creek NCDWR Stream Index No.: 22-48
NCDWR Surface Water Classification for Water Body Primary Classification: Class C
Sup iemental Classification:
Other Stream Ciassification: None
Impairments: None
Threatened/Endangered Species? No Comments:
NRTR Stream ID: Wolf Island Creek Buffer Rules in Effect: N/A
Project Includes Brid e S anning Water Bod ? Yes Deck Drains Dischar e Over Buffer? No Dissi ator Pads Provided in Buffer? No
Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
�
�
�
�
�
�
�
�
`��
�
�
z
�"
�°
��
��
��
w �,.
��
��
��
��
��
v� �
��
��
��
��
�
v J
I
�
.,
�
V
W
�
�
�
�
�
� �
�
V
�
�
O
V
See Sheet fA Fo� Index of Sheets
See Sheet 1 B For Conventional Plan Si�eet Symbols
See S/aeet iC-1 For Survey Control Sheet
�� ��� �� �����i� ������ \' �
.C.�
R tROL]FLL
055.1.1
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
GRAPHIC SCALES
50 25 0 50 100
PLANS
50 25 0 50 100
PROFILE (HORIZONTAL)
ILE
DESIGN DATA
ADT 2016 = 720
ADT 2040 = 800
K = �2 %
D = 60 %
T = b % *
V = 55 MPH
* TTST = 3% DUAL = 3%
FUNC CLASS =
MINOR COLLECTOR
"SUB-REGIONAL TIER"
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT B-5341 = 0.087 MI.
LENGTH STRUCTURE TIP PROJECT B-5341 = 0.036 MI.
TOTAL LENGTH OF TIP PROJECT B-5341 = 0.123 MI.
Prapared /n ihe Offloe dr
DIVISI011I OF HIGHWAYS
1000 Birch Ridge Or., Raleigh NC, 27610
2012 ST9NDARD SPECIFICATIONS
RIGHT OF WAY DATE: I JAMES A. SPEER, PE
JANUARY 23. 2015 �RO�scr sxcrxsse
LETTING DATE: I DANIEL W. GARDNER, JR, PE
JANUARY 19, ?O�6 �'ROJECT DES/GN ENG7NEER
�.�..�� .�,a �
B-5341
s.wwm.nn
n
BRSTP-17671:
-L
mom�oe�
P.E.
'--� _
NAD 83/
NSRS 2007
PERMIT DRAWING
SHEET 1 OF 6
HYDRAULICS ENGIIYEER
ROADWAY DESIGN
ElYGI1VEER
r.s.
SR 2023
GUERRANT SPRINGS ROAD
TO NC
PRELIMINARY PLANS
DO NOT USF. FOR CONSTRUCTiOv
e f NO d �
�
S
.
. ,
4f
T11AM
�
�
�
_
�
W
H
�
�
�
�
�
�
�
U
W
a�
W�
v, � N
z g
0
� �
� �
�p
d���
��
W�
�~
�
��
W�
� �Q
� +
Z �
W�
i �
�
�
��
Nd
��
��
«�
�
�
�
�
�
�
�
�
�
�,
�
{-
PROJECT REFERENCE NO. SHEET NO.
8-539/ 4
ics
ER
1S
tq p,
SEE SHEET 5 FOR -L- PROFILE
SEE SHEETS S-? THRU S-? FOR STRUCTURE PLANS
5
�
x
�
W
H
�
�
�
�
�
�
�
U
W
a�
W�
v, �2 N
O o
� ��
� � �
h �
d���
� �
W�
a ~
�
� �
W�
ti�Q
� +
Z �
W�
��
�
�
��
Nd
��
��
�
�
�
�
�
�
�
�
,��� : � —
��� -- - ��
1
ELEV
SEE S
�`
�i
{%'/ �.
� ��
�Lr /
/ � /.
� - / '
i /�F�
�� �
j __
����'
� � ��
�� � �
. ��._... ..
\ \�\`
�\ � ��
�, , ; \ \��
V �, � \
_ �:�� �,
� I � i'
�/// /�/ j�� ;'
' � j i/ii .;
� �%%�i%. 3�
'!/, //'�i;/�i�
�.� _
_ __ _
_�
���� �� �,
I � �
� \
✓� /
��� �
I
�����/... ..�
ilODS� \
� \ � /% � `,
1 — .
€,
f
�;
�;
\,
I
D
{-
Pl S�luy l�1+�8�/D/6��/� Pl Sllnp/�2/�f9y��2�2/ Pl Slln l3/�1+B�/ApO� p�
��-__� � � s N J7 {/4/ ��� � s G M W�V ��� 0 s �� W'IW �/7/ �
D� 6?1' 5�3' D� l'QB'' �53' D� T Q9' S5.8'
-m- � �- m� �= ns� �-�.oe�
-�
, : ,
� ., R � �.00' � 5� �S � � � LIWS
—�� �
�
� , I
� `'y �I I I', I ' �'1
I I lil il ��Ilil�'llll���11111` IIIII
� � il ��,��I� � �,i,� � I
" y I�� � I'� I � I� �� I �, II ��II I I li �I 111
�� _� ���' I � �' II Ij �' '' II ���' '� \
�� �� I i'l,� il I�I IIII I
\� I�/ //l� II� /III II �I � II IIII �\a \
`,�� �'� ' ` � ` �I � ;///� v�'��/� ll l� � o ' \ \\ \�. \
s I � �.
�.. \ \-"'`
��
15" w'�
ELBOWS
E�
�F/
\—'° -- — �
�'x �\ PD f �� F—� /
STANDpRD V DITCH . /�
W/CLASS B RIP RAP
SLOF� _ +/- 6.0%�� �
ESF DDE = 7 C fi ��
� ES7 22 TONS .. - �� �
ES7 65 5 7EXTILE �
SEE 1
�� � -
_ � � C�)
'---�
� ��
�,
\
� '�
,
�.�. �,;�
��
CLA55 B RIP RAP ' '� �
E5T 1 TON /
EST 5 SY � �`5�� �
GEOTEXTILE
II RIP RAP
PDE�
� � � CLA55 II RIP RAPJ
1 �. BANK STABILIZATION
EST 120 TONS
E5T 160 SY GEOTEXT
� SEE DETAIL 5
1 '
�
i�
��
�t
I E
��
�
�y l S�j, �
�/
/�
/ /S� I
� � ��� �
� J ��,i
. �,,
I
�/ ',
�
, �� /
� � �� \��\�
���� �
SITE 1
�
�
�
NAD 831/ SRS 2007
PERMIT DRAWING
SHEET 3 OF 6
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
�DENOTES IMPACTS IN
SURFACE WATER
PROJECT REFERENCE NO. SHEET NO.
8-539/ 4
WJJ SHEET NO.
ROADWAY DESIGN HYDR4ULIC5
ENGINEER ENGINEER
PRELIMIN Y PLANS
DO NOT USE PO CON9TRUCTION
I Nm,o s�oie�
�- _ . . 5.0'min.
� 1.0'mi 2.0'
NWS
�\\\� - - GEOTE%TILE
.�� \ 1\\\ �� � ��
\� \ � �,i \ �
� � � , � �,�
� s� �,
� �
'� STANDARD 3.0' BASE DITCH
� W/CLA55 II RIP RAP
\ SLOPE _ +/- 12A%
� �5T 80 SY� GEOTEXTILE
� � � SFE�„DETAIL 3
� .��� �
�\ 1.
� � \ V
� "1�_ \\\\� � �� . SPECIAL�IT DITCH .
"�� �SEE DETAIL�2
t�
�� �_ EF�,� � � E�� \ 'F\ QQ�
� �w
�� ' Q\
�k �
� F� F— �� � F�F �� ,��% S�% A
--- Type MLiner= CLASS II RIP RAP
FROM STA.161-38 TO STA.16+65 L CL
_� \
�—_
_`
�,. `
��
�f� ;
� �
�`
STANDARD V
W/PRSM
EST 9 SY
SEE DETAIL 4
\s
�.
� j ���_
_%/�
��
�/
�/� �
�,�= r
/ J / � ,
'C� i �
' \ � � i�.
, /
� '����� � � /
� ��1� � �����
SEE SHEET 5 FOR -L- PROFILE
SEE SHEETS S-? THRU S-? FOR STRUCTURE PLANS
'T� PROJECT REFERENCE NO. SHEET NO.
0
� ✓��/�a 8-534/ 4
� W V RM/ SHEET NO.
ROADWAY DESIGN HYORAULICS
ENGINEER ENGINEER
� PERMIT DRAWING
� SHEET 4 OF b
� PRELIMIN RY PLANS
� � � DENOTES IMPACTS IN uo Nor use Fo co�sTaocTioN
� SURFACE WATER
� � DENOTES TEMPORARY
�i � IMPACTS IN SURFACE WATER
I � 1
/
JS v,
,_
� � \'�
�
, m �
, �
, ,,iJ,
C
PDE E � E PDE
,�, E ,
,
, �_
— - �-�-- �---��_
a ,'; �� . i
I ''�_
� � � --�
� � � � � m �� � , ,�".
o ��` ` "
' Y� ���� ,� � � i, f-1 �� i ��
�
� � I � i� _ (
la'XX � � ��_ ; ��
� ���� �r��-� -
I
� , � _ �_ , -
� � � � ��r
,�u�� � ��a i i 1 y� � a� ��
+ � f�1 ���, I,` � �;�i
s'I 1 l l ,Y
L � a �l _ � � �'
� .� �, -
,
,
� -� ,
,
_
�, �� � =� �� � _
�— � � ;� '�
--, – ': � � �
_ , � � �
� � / � –,
_ ��
I
� - -
��� � �� ���— -- ---------
_�
� PDE E � �,� F F F F
F � � � PDE E -
, , -� �
�
�� � � � � ,
, a
� � � y � � �,
, I , �
� Q WOODS /
__ J /
_ _ c.� ,
� � /
, ,
' �'
� � I
�
� . / O �
� �
� � , �1�� _. � . �
� �
� �
� � �. S ITE 1 � � �
�
� ,
z ,�
�o
��
�� ;
��
�� �
w�
��
��
��
V14ALL . ' F— ` L� e
��� � � r
�� y
�� � �
<� �
�
�� �� �� �� �� ��I� �� �� ��
-- �- -- -� -- �oY -- -� --
--��-���--�m---�--
SHEET NO.
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 16+65 -L- BANK STABILIZATION < 0.01 42
1 16+93 -L- " COFFER DAM < 0.01 34
TOTALS`: < 0.01 < 0.01 42 34 0
'Rounded totals are sum of actual impacts
NOTES:
" Temporary impacts are for a coffer dam needed to remove existing piers.
�
��
�
�
�
�
�
�
�
�.
�
�
m�
���
�o�
���
o�w
��
� ,,a
� oz
N ��
� o `�
a o�
���
�
���,
OQ'W
V
' •
I
�
� �
�
V
W
O
QC
�
�
�
� •
�
V
�
�
O
V
See Sheet 1A For Index of Sheets
See Sheet iB For Conventional Plan Sheet Symbols
See Sheet 1C- 1 For Survey Control Sheet
��.�-���, �� ����� �� f����,�� ��.
Tfn Tf Ti 9 lf ,!� Tf /ItiC A Y //R. Tr� Tf lS lT' TV 1T lT l8l[9 A 4 Y�
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
�AD
NC 700 I
PRELIMINARY PLANS
DO NOT USE FOA CONSTRUCTION
Prepo�ed ln the Offlce of: H1'DRAULICS ENGINEER
GRAPHIC SCALES DESIG11l DATA PROJECT LENGTH
ADT 2016 = 720 DIVISI0111 OF HIGHWAYS
5L0 �2I$ � $0 100 ADT 2040 = 800 1000 Birch Ridge Dr., Raleigh NC, 27610 ���p kORipc+
■ I■���� � 0 2012 STANDARD SPECIF7CATIONS a�' 'a�
PLANS K— 12 �° LENGTH ROADWAY TIP PROJECT B-5341 = 0.087 ML ° �
D = 60 °/a r.E. q ,
S/GNATURE: s
5o z5 o so �oo T— 6��a * LENGTH STRUCTURE TIP PROJECT B-5341 = 0.036 MI. RIGx7' oF WAY nATE: 1,e,MES A. SPEER, PE 9w a
V= 55 MPH TOTAL LENGTH OF TIP PROJECT B-5341 = 0.123 MI. JANUARY 23, 2015 rxo�ECZ ExcrNEEn ROADWAY DESIGN �°F�.r ea�,4r
PROFILE (HORIZONTAL) *�ST =3% DUAL =3% ENGINEER oF Twwy�e
70 5 0 70 2p FUNC CLASS = LETTING DATE: DANIEL W. GARDNER, JR, PE
MINOR COLLECTOR JANUARY 19, 2016 PRO�FCZ nFSrcN FNC�xFFn
PROFILE (VERTICAL) "SUB—REGIONAL TIER" PE
SlGNATURE:
�
�
N
Note: Not to Scale
*S. U.E. = Subsurface Utility Engineering
BOUNDARIES AND PROPERTY.•
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Corner
Property Monument
Parcel/Sequence Number
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
0
EiP
�
0
i23
—x x x-
e
e
�
— — — — w L B — — — —
wLB
EeB
Known $oil Contamination: Area or $ite �
Potential Soil Contamination: Area or Site — �
BUILDINGS AND OTHER CULTURE.•
�
,�r
.�.
Gas Pump Vent or U�G Tank Cap O
Sign �
WB�� �w
Small Mine 'SZ�
Foundation �
Area Outline 0
Cemetery 0
Building �
School �
Church �
Dam
HYDROLOGY.•
Stream or Body of Water
Hydro, Pool or Reservoir
Jurisdictional Stream
Buffer Zone 1
BufFer Zone 2
Flow Arrow
Disappearing Stream
Spring
Wetland
Proposed Lateral, Tail, Head Ditch
False Sump
�----J
�s
— BZ 1
BZ 2
5�'�°]�]C �iF�° 1�C��°]�i�[ �C��$�]Ie�1��
�����1[�� �]F �[��iE�I����
CONVENTIONAL PLAN SHEET SYMBOLS
RAILROADS.•
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
RIGHT OF Wf1Y.•
Baseline Control Point
Existing Right of Way Marker
Existing Right of Way Line
Proposed Right of Way Line
Proposed Right of Way Line with
Iron Pin and Cap Marker
Proposed Right of Way Line with
Concrete or Granite WW Marker
Proposed Control of Access Line with
Concrete C1A Marker
Existing Control of Access
Proposed Control of Access
Existing Easement Line
Proposed Temporary Construction Easement -
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Drainage / Utility Easement
Proposed Permanent Utility Easement
Proposed Temporary Utility Easement
Proposed Aerial Utility Easement
�
CSX TRANSPoRTATION
MILEPo T 35
�0
a�
ia
v✓
ia
L�✓
��a
��./
/A\ ��
�J
��
_..
TDE
PDE
DUE
PUE
TUE
AUE
Proposed Permanent Easement with O
Iron Pin and Cap Marker �
ROADS AND RELATED FEATURES.•
Existing Edge of Pavement
Existing Curb -----
Proposed Slope Stakes Cut --- �---
Proposed $lope Stakes Fill - - - F - - -
Proposed Curb Ramp CR
Existing Metal Guardrail
Proposed Guardrail T T T r
Existing Cable Guiderail n n �
P d C bl G'd 'I n n n n
ropose a e ui erai
E Equality $ymbol
� Pavement Removal
°� �" ^ i�EGET�ITION.•
� Single Tree
�� Single Shrub
� Hedge '�"
���������
�#
Woods Line �""'-'
Orchard
Vineyard
EXISTING STRUCTURES.•
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
$torm $ewer
UTILITIES.•
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
WG Power Cable Hand Hole
H-Frame Pole
Recorded WG Power Line
Designated U/G Power Line (S.U.E.*)
TELEPHONE:
WATER:
Water Manhole OO
Water Meter o
Water Valve �
�? Q f? Q
Water Hydrant �
vtnerora
Recorded l!/G Water Line •
Designated WG Water Line (S.U.E.*� - - - -•- - - -
Above Ground Water Line A�c wa,a�
CONC
- J CONC WW I
�
CONC HW
>---------�
�CB
OO
s
•
•
O
/1
r
��
�
Existing Telephone Pole �
Proposed Telephone Pole �
Telephone Manhole OO
Telephone Booth ❑'
Telephone Pedestal ❑T
Telephone Cell Tower �
U/G Telephone Cable Hand Hole HH
Recorded U/G Telephone Cable �
Designated U/G Telephone Cable (S.U.E.*) - - - - -'- - - -
Recorded WG Telephone Conduit '�
Designated U/G Telephone Conduit (S.U.E.*� - - - -T�- - - -
Recorded U/G Fiber Optics Cable T��
Designated U/G Fiber Optics Cable (S.U.E.*� - - - -T °°- - -
rv:
N Satellite Dish CC
TV Pedestal ❑O
TV Tower �
WG N Cable Hand Hole HH
Recorded U/G N Cable �°
Designated U/G N Cable (S.U.E.*) - - - -*�- - - -
Recorded U/G Fiber Optic Cable �° F�
Designated U/G Fiber Optic Cable (S.U.E.*� ----T� F�- --
GAS:
Gas Valve �
Gas Meter �
Recorded U/G Gas Line �
Designated U/G Gas Line (S.U.E.*) - - - -°- - - -
Above Ground Gas Line A�c co�
SANITARY SEWER:
Sanitary Sewer Manhole OO
Sanitary Sewer Cleanout 0+
U/G Sanitary Sewer Line s�
Above Ground Sanitary Sewer A�c sa�,+o�Y Sewer
Recorded SS Forced Main Line Fss
Designated SS Forced Main Line (S.U.E.*) — - - - -F�s- - - -
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility Traffic $ignal Box
Utility Unknown U/G Line
U/G Tank; Water, Gas, Oil
Underground Storage Tank, Approx. Loc. —
A/G Tank; Water, Gas, Oil
Geoenvironmental Boring
U�G Test Hole (S.U.E.*)
Abandoned According to Utility Records
End of Information
•
O
O
❑s
��.�
�
0
�
AATUR
E.O.I.
��
r
J
�
B-5341 S UR VEY C01�TROL SHEET
z
n
0
a
wz
� ��
z
UA I UM ��SCI-� 1 N I 1 UN
THE LOCALIZED COORDINATE SYSTEM DEVELOPGD FOR TH[S PROJGCT
IS BASED ON THE STATE PLANE COORDINATES ESTABLISHE� BY
NCGS FOR MONUMENT "B5341-2"'
W1TH NAD 83/NSRS 2007 STATE PLANE GRID COORDINATES OF
NORTIi1NG: 995.598.128(ft) EASTWG: 1�835�998.698(ffl
ELEVAT�OM 546.46'Iftl
5HE AVERAGE COMBINED GRID FACTOR 11SE� ON THIS PROJ-Ci
(GROUND T�J GR[DI [S: 0.9999169995
THE N.C. LAMBERT GRID BEARING AND
LOCALIZED FIORIZONTAL GROUND DISTANCE �ROM
"B5341-2" TO -L- STATION 13+50 1S
S 4°38'06" W L 29A.79'
ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL D[STANCES
VERTICAL DATUM USED IS NAVD 88
NOTES
1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTZNG
PROJECI' CON'l'ROL llA7'A AT:
HTTPSI/CONNECTNL'DOT.GOU/RE90URL'ES/LOCATION/PAGES/DEFAULT.ASPX
THE FILES TO BE FOUND ARE AS FOLLOWS:
B6341_LS_CONTROL.TXT
S%1'I' CAL[BSATION !N/�'OHMATION HAS NOT BGEN PHOVIDGU FOR THIS Y[20JEC7'. !R FURTH/s'R
INFORMATION IS NEEDED.PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.
�INDZCATES CEODETIC CON'/'HO/. MONUMENTS USED OR SET FOR FZORIZONTAL PROJECT
CONTROL BY THE NCDOT LOCATION AND SURVEYS (7NZT.
PROJLCT CONTftOL ESTABLZSHED USING CLOBAL YOSITIONlNG SYSTEM.
NETWORK ESTAI3LISFIED FROM NGS ONL/NF. POSITIONING SERVlCE (OPU3)
BASELINE DATA
BL.
PDINT DCSC. NO�Th�i GAST LEVATION L STATION OFFSGT
------------ ---------------- ---------------- ---------------- ---------------- ---------------- ----------------
3 BL-3 9939m7.4272 1835936.2704 537.36 OUTSIDE PROJECT LIMITS
4 BL-4 994499.2354 18359ID2.8417 516.65 15�41.36 14.81 RT
_ 8L-5 995152.5895 1835886.4974 540.13 21�92 J2 26.36 LT
B5341�2 995598.128� 18359q8.6988 546.46 OUTSIDE PROJECT LIMITS
I B5341-I q9g871.155� t835932.131P� 532.37 OUTSIDE PROJECT LIMiTS
BENCHMARK DATA
........................................
13M1 ELEVATION - 534.84
N 993919 E 18359ID8
BL STATION 5�13.m1� 28 LEFT
RR SPIKE IN 2B" POPLAR
........................................
........................................
BM2 ELEVATION = 512.64
N 994636 E 1835786
DL STATiON 12^35e�B 193 LEFT
RR SPII<E SN 74" PnPL9R
................<.,.....>............,..
_L
ALIGN
L
L
L
L
L
L
L
-L-
ALIGN
L
L
L
L
PROJECT REFERENCE NO. SHEET NO.
B-5341 1C-1
Location and Survevs
SR 2023
GUERRANT SPRINGS ROAD
II
II
II
I �
I ---_-
� --
�� �
�QI NCDOT BASELINE
��I STATION "85341-I"
� `�I N = 996071.1550
/ I E = 1835932.1310
/ �
-___ -----�/ �� TO NC 700 �--
NCDOT BASELINE � �'
STATION °B5341-2" � �
N = 995598.1280 � /
E = 1835998.6980 � �
1
I�
I
�I
1
1
l�
TYPE STATION
POT I��BIDeBB
PC 10�34.74
PCC 12��5.96
PT 13�82e45
PC 18�B4e91
PT 21•55e99
FOT 23��1.96
L
NORTH ERST
9939E1e2�78 1835936e3654
993994.8435 1835927.6936
994163.7049 18359pG7.9288
99434BeBB74 1835893e�924
994762e313� 1835881e7843
995111e98?9 18359�6e3763
995255.9215 183593�.66`�4
PRELIMINRRY NEW PERMRNENT DRRINRGE
STRTION OFFSET NORTH
2ID�35.B� -3IDeBB 994995.1823
2ID-5�.�� -64.BB 995813.9542
2m�75.�� 3�.4m 995m35.5124
2ID-8�.8� -54eBID 995B43e5537
2ID-2�a�� 3�a�� 994974e4�81
2ID�16.�� 41.�� 994969e5�36
28�42.�� 3�.00 994995.9392
2��35.�0 48.�0 994987e2879
PRELIMIN�IRY NEW PERMANENT UTILITY
STATION OFFSET NORTH
13�84.�0 3�.m0 994344.7551
13-84.BB -55eBe 99434Be�859
14-ID4.�� -55vIDID 99436IDe�787
14^84.�� -3IDeIDB 99436Be7479
ERSEMENTS
ERST
1835H6Be3931
1835828.1841
1835864.9137
1835841e7294
1835918e6742
1835929e2725
183592�.7°42
1835938.��C�7
ERSEMENTS
EAST
18358630�616
1835838e�7ID6
1835837e5352
1835H62e52E3
NOTE: DRAWING NOT TO SCALE
J
Wm
¢
J
2
�
�
Q
ti
�
_
�
�
W
�
�
W
�
O2
¢
U
J
J
�
�
�
�
_
�
�
Z
U
r
J
W
m
O�
� Wp
�a
�
a �
Z 23
� O J
� ti
W RJ �
� Y �
� �
� Q
� J
dv
��
i a
�o
Q O
Oa
ti W
�
ti
J �
W�
��
_ �
~ O
OyN,
ti O
N
2�
��
Wp
i
��
OQ�
�p�
i *
�N
Nd
_�
o �n
� �
W J
�
` �
��
�
�
Q
�
�
�
m
�
e
o_
-o
—L —
S nu.,_.. �i ca� iiin/fLi GI f�.. 17iaA77 OI ff.. iOJ.OIM
PROIECT REFERENCE NO. � SHEET NO.
� . � o� �NFFr ti�
EXACAVATE EXISTING ROAD FILL I�) NOTE: SBG - SHOULDER BERM GUTTER
TO NATURAL GROUND = 180 CY -L- STA. 15+10.00 TO BEGIN APPROACH SLAB LT. & RT.
(STRUCTURE PAY ITEM)
DETAIL 1 DETAIL 2 DETAIL 3
STANDARD 'V' DITCH SPECIAL CUT DITCH STANDARD BASE DITCH
(Nof�o Scole) INO��o Smla� INO��o Scale)
NaNrol
NoNrol Nofural � Dfch G�ound 1� Ground
Gro�n 3 � Groun � p� � Slopv �� D �',
d p 3� �d ? o ��e� d
Min. D=1.0 Ft. Geo�e.11e B Min. D= 2.0 Ft.
Geoee.�Ae Max. d= 2A Ft.
Min. D=1.0 Ft. WWnen B I: < 6.0' B= 3.0 Ft.
Type of Liner=CLASS B RIP RAP Mox. d=1.0 Ft. FROM STA. 19+00 L TO STA. 20+00 L LT
FROM STA. 73+50 L TO STA. 13+93 L RT T pe of Liner= CL455 II RIP RP.P
STA. 20+53 L lT
1 �
\ \ �
DETAIL 4 DETAIL 5
STANDARD 'V' DITCH BANK STABILIZATION
�Na�o s<aiel 1� �ro s�oie�
5.0'm'in.
NoNrol No�u�ol
Gra�nd 2.� ♦ Gro�nd 1.0'min. ���'
p ti NWS
d �
Min. D= 1.0 Ft. GEOTEXTILE
Type ofLi�er== PSRM Mox.d= 1.0 Ft.
Type olLiner= CLA55 II RIP RAP
FROM STA. 20+55 TO STA. 20+66 L LT FROM STA.16+38 TO STA. 76+65 L CL
J$
is� -
iR /76J
�
i
/ i
SEE SHEET 5 FOR -L- PROFILE
SEE SHEETS S-? THRU S-? FOR STRUCTURE PLANS