Loading...
HomeMy WebLinkAbout310789_Compliance Evaluation Inspection_20230523 ivision of Water Resources Facility Number 3 - F7g O Division of Soil and Water Conservation O Other Agency Type of Visit: Q'Compliance Inspection 0 Operation Review p Structure Evaluation O Technical Assistance Reason for Visit: O-Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: 5 23 t3 Arrival Time: F ; 3 Departure'rime: i County: Dvl!l;h Region: (.)+(20 Farm Name: 1q. LeLyfn±: r& F<<Yhq Owner Email: Owner Name: rcv�n g C av"rz avq�, Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: ,y c� Certified Operator: �ai S 1 l Q l/$YLQ � Certification Number: l 5 7 I Back-up Operator: Certification Number: 7252 37 a Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow . Wean to Feeder Non-La er I Dairy Calf ✓ Feeder to Finish A 5 0 r 00 Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dair Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharses and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes []No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? [] Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) ❑ Yes ❑ No [] NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [jNo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ETNo ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Coirtiuued Facilit Number: '5 - 7-6 Date of Inspection: 5 23 Z 23 Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes [�No ❑ NA ❑ NE a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): 2 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes L;� No ❑ NA ❑ NE (i.e., large trees, severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Q No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 2 No ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes Q No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes [ZNo ❑ NA ❑NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes ErNo ❑ NA ❑NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. [:] Yes [�No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn, etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [7fNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes allo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [allo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [l No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment'? ❑ Yes ZNo ❑ NA ❑ NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes [nNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ff No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes �o ❑ NA ❑NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis [:]Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and I" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ErNo ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facilit Number: 31 7 Date of Inspection: 5 Z3 23 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [ o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [i]'No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes [r!rNo ❑ NA ONE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No ,/ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [/]'No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [ o ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes []'No ❑ NA ❑ NE permit?(i.e., discharge, freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [D No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [✓]—No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [ l-No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ErNo ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). vc�c 5`A"`/ dA,-f— c�1l��Zoz3 �1zq 1 202s • � sv►^� to ►'�;�( Y��N � !•C) Reviewer/Inspector Name: &Y,7_&0 Phone: 91 G•17y?.$G$j� Reviewer/Inspector Signature: ✓T• Date: Page 3 of 3 511212020