HomeMy WebLinkAboutNCC231329_ESC Approval Submitted_20230523 DEPARTMENT OF PUBLIC UTILITIES
Post Office Box 2263
SMITHFIELD,NC 27577
(919) 989-5075
April 27, 2023
LETTER OF APPROVAL
Rex Vick
RBV Mill LLC
2046 Energy Drive
Apex,NC 27502
RE: Project Name: Browning Mill Stage 2 infrastructure only
Project ID: JC#22-081 -P
Disturbed Acres Approved: 8 acres
Stream Classification: Buffalo Creek(C,NSW)
Submitted By: WithersRavenel
To Whom It May Concern:
Johnston County has reviewed the subject erosion and sedimentation control plan for Stage 2 of this
development. We find the plan to be acceptable and hereby issue this Letter of Approval. The attached
Certificate of Approval must be posted at the job site. This plan shall expire three (3)years following
the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A
NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000
Construction Stormwater General Permit. After the form is reviewed and found to be complete,you
will receive a link with payment instructions for the$100 annual permit fee. After the fee is processed,
you will receive the COC via email. As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
Letter of Approval
Browning Mill Stage 2
April 27, 2023
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form,which you provided. You are requested to file an amended form if there
is any change in the information included on the form.
Please contact Shannon Stanley with this office to schedule the pre-construction meeting prior to
beginning construction.
Your cooperation is appreciated.
Sincerely,
Pyb,_/Ctti,(
Beth McLaughlin
McLaughlin Consulting
Contractor for Johnston County Public Utilities
cc: Jessica Batten,Johnston County
Charles Pender,Johnston County
Shannon Stanley,Johnston County