Loading...
HomeMy WebLinkAboutNCC231329_ESC Approval Submitted_20230523 DEPARTMENT OF PUBLIC UTILITIES Post Office Box 2263 SMITHFIELD,NC 27577 (919) 989-5075 April 27, 2023 LETTER OF APPROVAL Rex Vick RBV Mill LLC 2046 Energy Drive Apex,NC 27502 RE: Project Name: Browning Mill Stage 2 infrastructure only Project ID: JC#22-081 -P Disturbed Acres Approved: 8 acres Stream Classification: Buffalo Creek(C,NSW) Submitted By: WithersRavenel To Whom It May Concern: Johnston County has reviewed the subject erosion and sedimentation control plan for Stage 2 of this development. We find the plan to be acceptable and hereby issue this Letter of Approval. The attached Certificate of Approval must be posted at the job site. This plan shall expire three (3)years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC)under the NCG010000 Construction Stormwater General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the$100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Letter of Approval Browning Mill Stage 2 April 27, 2023 North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided. You are requested to file an amended form if there is any change in the information included on the form. Please contact Shannon Stanley with this office to schedule the pre-construction meeting prior to beginning construction. Your cooperation is appreciated. Sincerely, Pyb,_/Ctti,( Beth McLaughlin McLaughlin Consulting Contractor for Johnston County Public Utilities cc: Jessica Batten,Johnston County Charles Pender,Johnston County Shannon Stanley,Johnston County