Loading...
HomeMy WebLinkAboutWQCS00011_NOV-2023-DV-0206_20230522 ROCKY MOUNT WATER RESOURCES THE CENTER OF IT ALL -May 16, 2023 Brenton Bent Director of Water Resources City of Rocky Mount 331 South Franklin Street Rocky Mount,NC 27804 Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office 3800 Barrett Drive, Raleigh, NC 27609 Subject: Notice of Violation & Intent to Issue Civil Penalty Tracking No.-NOV 2023-DV-0206 Collection System Permit No. WQCS00011 Dear Mr. Vinson, I received the Notice of Violation from the DWR dated May 8. 2023, as identified by the subject tracking number regarding the sanitary sewer overflow(SSO) events that occurred on 4/8/2023. The city of Rocky Mount takes these incidents very seriously and continues to take steps to minimize the potential for such overflows within our sewer collection system. Consistent with previous responses, the city continues to investigate, evaluate, and invest in the sewer collection system to mitigate these incidents. As you are aware, these overflows occurred primarily when Rocky Mount received heavy sustained rainfall causing flash flooding of streets, drainage ditches, and streams. As a result, the collection system can become hydraulically overloaded from inflow and infiltration. In addition, the city has wholesale wastewater purchase agreements with neighboring systems such as the town of Nashville, the town of Whitakers, the town of Sharpsburg, Nash County, and Edgecombe County. These systems also contribute to increased flows during rain events. The city currently maintains more than 435 miles of sanitary sewer collection lines. Over the past year, the Water and Sewer Division has engaged in many projects to alleviate inflows and (252)972-1121 / 331 S Franklin St.,PO Box 1180,Rocky Mount,NC 27802 1180 / www.rockymountnc gov a infiltration and improve flow capabilities to the treatment plant. The city completed two significant projects to assist in these efforts. These are the relining of approximately 1.7 miles of a 27" sewer outfall line and the replacement of two old screw pumps.The latter will increase conveyance capabilities by twenty million gallons per day. The city has also continued the annual appropriation of funds to our sewer rehab program, which targets the resurfacing of manholes of older masonry construction or found to have leaking joints. The other scope of our rehab program is relining sewer mains identified to have breaks, cracks, or root intrusions. The city recently secured $400,000 in grant funding to conduct a comprehensive sewer model for the collection system. The project will commence in June 2023. We hope that this project will assist the city in identifying areas of vulnerability within the system. The city continued to smoke-test the collection system and conduct repairs as soon as intrusion points were identified. In addition, we continued our diligent daily maintenance, repair, video inspection, and cleaning of our system to prevent further SSOs or system interruptions. Please be assured that the city of Rocky Mount is working with great care and perseverance to reduce the number of sanitary sewer overflows in the collection system. This effort will remain a top priority in the foreseeable future. As you can see, we are taking the necessary steps to address the integrity of our entire collection system, and we hope that the Division of Water Resources will favorably consider these efforts as you deliberate on any further actions regarding these incidents. If you have any questions or require additional information, please do not hesitate to contact me at 252-972-1299 or at Brenton.bent@rockmountnc.gov. Sincerely, e r� I Brenton Bent, Director of Water Resources (252)972-1325 / 331 S.Franklin St.,PO Box 1180,Rocky Mount,NC 27802-1180 / www.rockymountnc.gwa