Loading...
HomeMy WebLinkAboutNCG140514_Email RE Batch Plant Relocation_20230421 Cook, Brittany From: Cook, Brittany Sent: Friday, April 21, 2023 2:43 PM To: Miller, Vickie M. (Raleigh) Cc: Turley, Wes Subject: RE: [External] TBMNC - Concrete Batch Plant NCG14 - COC No. NCG140514 I believe we can keep the application how it is, I'll drag this email into the file for historical purposes. Can you send me the coordinates of the new "entrance"to the site? Thanks, Mrs.Brittany Cook General Industrial Stormwater Permit Coordinator Stormwater Program, Division of Energy, Mineral,and Land Resources N.C. Department of Environmental Quality Phone: (919) 707-3648 From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com> Sent: Friday, April 21, 2023 1:10 PM To: Cook, Brittany<Brittany.Cook@ncdenr.gov> Cc:Turley, Wes<Wes.Turley@hdrinc.com> Subject: RE: [External]TBMNC-Concrete Batch Plant NCG14-COC No. NCG140514 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Brittany, The batch plant is being moved about 1,200 feet from its current location (image below). Street address, receiving water, and industrial activity all remain the same. i Pule, t, L'ne Path Polygon Grde X p th 30 polygon Measure Me dstance beMeen Mo pdht on the ground I Map L ngth, 1,—10 Ground Length, I'm 15 Heading, 84,14 degrees 46 -glib, Thank you, Vickie From: Cook, Brittany<Brittany.Cook@ncdenr.gov> Sent: Friday, April 21, 2023 7:12 AM To: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com> Cc:Turley, Wes<Wes.Turlev@hdrinc.com> Subject: RE: [External]TBMNC-Concrete Batch Plant NCG14- COC No. NCG140514 CAUTION: [EXTERNAL] This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good morning, You possibly may need a new NOI. How far is it being moved?Will the street address change?Will the receiving water change?Also, will the industrial activity differ from what was originally in the application? Mrs. Brittany Cook General Industrial Stormwater Permit Coordinator Stormwater Program, Division of Energy, Mineral,and Land Resources N.C. Department of Environmental Quality Phone: (919) 707-3648 From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com> Sent:Thursday, April 20, 2023 4:10 PM To: Cook, Brittany<Brittany.Cook@ncdenr.gov> Cc:Turley, Wes<Wes.Turlev@hdrinc.com> Subject: [External]TBMNC-Concrete Batch Plant NCG14- COC No. NCG140514 2 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Brittany, We are needing to relocate the Chandler concrete batch plant at the Toyota Battery Manufacturing Site in Randolph County. Do I need to submit another NOI Application or is there a process to revise it for the new location? I thought I would check before resubmitting another package. The new location is illustrated on the attached pdf. Thank you, Vickie 3