May 19, 2023
Duke Energy Progress, LLC
ATTN: Tom Copolo
10660 Boston Road
Roxboro, NC 27573
Subject: COMPLIANCE EVALUATION INSPECTION
Duke Energy Progress, L.L.C.
Mayo Facility, Certificate of Coverage-NCS000580
Person County
Mr. Copolo;
On April 26, 2023 a site inspection was conducted for the Mayo Steam Electric facility located at 10660
Boston Road, Person County, North Carolina. A copy of the Compliance Inspection Report is enclosed for
your review. The site visit and file review revealed that the subject facility is covered by NPDES Individual
Stormwater Permit-NCS000580. Permit coverage authorizes the discharge of stormwater from the facility
to receiving waters designated as Mayo Reservoir a Class WS-W waterbody in the Roanoke River Basin.
As a result of the inspection, the facility was found to be in compliance with the conditions of the
NCS000580 Individaul permit. Please refer to the enclosed Compliance Inspection Report for additional
comments and observations made during the inspection.
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil
penalty assessment of up to $25,000 per day for each violation. If you or your staff has any
questions, comments, or needs assistance with understanding any aspect of your permit, please contact
me at (919) 791-4200 or by e-mail at Thad.valentine@ncdenr.gov.
Sincerely,
Thad Valentine
Environmental Senior Specialist
�
g North Carolina Depar trnent of Environmenta �l Quality Division of Energy. Mineral and Land Resources
Q �/ Raleigh Regional Office 1628 Mail Service Center 13800 Barrelt Drive I Raleigh, North Carolina 27609
o�wesennw fmra�am aw� /�'� 919,7914200
Compliance Inspection Report
Permit: NCS000580 Effective: 03/21/19 Expiration: 12/31/21 Owner: Duke Energy Progress LLC
SOC: Effective: Expiration: Facility: Mayo Steam Electric Power Plant
County: Person 10660 Boston Rd
Region: Raleigh
Roxboro NC 27573
Contact Person: Tom Copolo Title: Plant Manager Phone: 336-597-7307
Directions to Facility:
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 04/26/2023 Entry Time I O:OOAM
Primary Inspector: Thaddeus W Valentine
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Certification:
Phone:
Exit Time: 12 15PM
Phone:
Inspection Type: Compliance Evaluation
Page 1 of 4
Permit: NCS000580 Owner - facility: Duke Energy Progress LLC
Inspection Date: 04/26/2023 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
I meet with Leanne Wilson,Lori Tollie and others at the Mayo facility for Duke Energy to perform a stormwater complaince
inspection. During this inspection I found that the permittee keeps very extensive and detailed records and documentation to
meet the stormwater permit requirements. There were just a couple areas that I would request that specific attention be
paid, to better capture and prevent any stormwater pollution issues. The site map was included with much of the information
required, there were areas that should have been identified, such as the chlorine building, that were not shown on the map.
Any areas with the potential for pollution to stormwater, along with any other areas required by the permit,should be shown
on the map.
Site inspections are done regularly, but there are some site specific areas with the potential to pollute stormwater that
should be added to the checklist such as the chlorine building. Example: There are poly totes without secondary
containment under the shed side of the building that have the potential to leak, spill or to crack and cause a spill that would
be exposed to stormwater. There were chemicals stored next to the rollup door that could be a potential stormwater
pollutant that should be stored in a safe location that would have been identified as an issue if that area was part of a
checklist. Please provide checklist for all site specific areas with the potential to be a stormwater pollutant source.
The request to combine the two stormwater permits for the monilift NCG120101 and the individual stormwater permit
NCS000580 has been approved. The number system has been altered to reflect the requested removal of alphanumeric
numbering as well as making the requested changes to the numbering for stormwater permit NCS000580. Outfall 002 is now
007 for that permit outfall. These changes will come effective at the renewal of your stormwater permit NCS000580. Also, at
the same time as the renewal stormwater permit NCG120101 will be rescinded.
Page 2 of 4
Permit: NCS000580
Inspection Date: 04/26/2023
Owner - Facility: Duke Energy Progress LLC
Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Does the site have a Stormwater Pollution Prevention Plan?
# Does the Plan include a General Location (USGS) map?
# Does the Plan include a "Narrative Description of Practices"?
# Does the Plan include a detailed site map including outfall locations and drainage areas?
# Does the Plan include a list of significant spills occurring during the past 3 years?
# Has the facility evaluated feasible alternatives to current practices?
# Does the facility provide all necessary secondary containment?
# Does the Plan include a BMP summary?
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
# Does the facility provide and document Employee Training?
# Does the Plan include a list of Responsible Party(s)?
# Is the Plan reviewed and updated annually?
# Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented?
Yes No NA NE
■❑❑❑
❑ ❑ ❑
❑ ❑ ❑
❑ N ❑ ❑
Comment: The plan has a detailed site map but I have asked that additional areas of thesite be added to
the map such as the chlorine shop and any other activity areas such as that along with the
outfall locations.
Stomrwater facility inspections were provided but I recommend that inspection checklist for
specific areas such as the Chlorine building be added to the checklists as a site specific
checklist area along with any other areas that could potentially be a stormwater pollution
discharge area.
A list of significant spills should be added to the SWPPP
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? ❑ ❑ ❑
Comment: Provided
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? N ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? N ❑ ❑ ❑
Comment: Provided
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
# Were all outfalls observed during the inspection? M ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Divis on? ❑ ❑ 0 ❑
# Has the facility evaluated all illicit (non stormwater) discharges? 0000
Comment: The outfalls were observed and alternate numbering was requested