HomeMy WebLinkAboutNCS000581_Insp Letter (Signed) with Report_20230519.docxROY COOPER
ELIZABETH S. BISER
y_-�rrerar)
DOUGLAS R. ANSEL
fhkf,m t)fWOW
Duke Energy Progress, LLC
ATTN. Torn Copolo
1700 Dunnaway Road
Semora, NC 27343
NORTH CAROLINA
Environmental Quality
May 19, 2023
Subject: COMPLIANCE EVALUATION INSPECTION
Duke Energy Progress, LLC.
Roxboro Facility, Certificate of Cove rage-NCS000581
Person County
Mr. Copolo:
On April 26, 2023 a site inspection was conducted for the Roxboro Steam Electric facility located at 1700
Dunnaway Road, Person County, North Carolina. A copy of the Compliance Inspection Report is
enclosed for your review_ The sate visit and file review revealed that the subject facility is covered by
NPDES Individual Stormwater Permit-NCS000581. Permit coverage authorizes the discharge of
stormwater from the facility to receiving waters designated as Hyco Lake a Class WS-V,B waterbody in
the Roanoke River Basin_
As a result of the inspection, the facility was found to be in compliance with the conditions of the
NCS000581 Indlvidaul permit Please refer to the enclosed Compliance Inspection Report for additional
comments and observations made during the inspection_
Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil
penalty assessment of up to $25,000 per day for each violation. If you or your staff has any
questions, comments, or needs assistance with understanding any aspect of your permit, please contact
me at (919) 791-4200 or by e-mail at Thad.valentine@ncdenr.gov.
Sincerely,
�t", _
Thad Valentine
Environmental Senior Specialist
Q� t`orth Carolina pcRal €went of Lnvirolancnt.d Qualify Division of t.neryv F�iiner�ll alit Lars! Rcsosrrce5
_ Raleigh Reginnal Office 1028 Mail Scrvire Centel 13800 Bartvn rett Drive I Raleigh. rfhCarolina 27b09
uawrtmmrer arn.mivney qw\ �� c1191914200
Compliance Inspection Report
Permit: NCS000581 Effective: 06123117 Expiration: 12l3V21 Owner: Duke Energy Carolinas LLC
SOC: Effective: Expiration: Facility: Roxboro Steam Electric Plant
County: Person 1700 Dunnaway Rd
Region: Rale,gh
Semora NC 27343
Contact Person: Jason Haynes Title: Phone:
Directions to Facility:
System Classifications: SWNC,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
Inspection Date: 04/2612023 Entry Time 01:20PM
Primary Inspector: Thaddeus W Valentine
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: 0 Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Certification:
Phone:
Exit Time: 03-20PM
Phone:
Inspection Type: Compliance Evaluation
Page 1 of 3
Permit: NCS000581 Owner - facility: Duke Energy Carolinas LLC
Inspection Date: 04/26/2023 Inspection Type: Compliance Evaluat-on Reason for Visit: Routine
Inspection Summary:
I meet with Robert Howard, Lori Tollie and others to inspect the site and evaluate the effectiveness of their stormwater permit
program. We reviewed the required documents for the permit before walking the site and I found that everything was detailed
and complete.
The stormwater permit is issued for a flat staging and laydown area of 3.5 to 5 acreas with the plant and associated
materials located to the South and Hyco Lake to the East, North and West. The area has a railroad track which carries
gypsum, limestone and coal in rail cars that circles the entire laydown area. This laydown area consist of large pipe
sections that looked clean with no visible residue, staged in small areas around the site . There are Conex Boxes and
miscellaneous materials located in different areas of the yard. The sample outlet can be found at the one discharge point on
the East side of the permit area. Site BMP's consist of grass and ditches.
The stormwater pollution prevention plan (SP3)appeared to be in order and all the requirements of the plan are being
followed. The one exception being the spill log. We recommend that the (SP3) contain a list of spills or leaks for the last
threee years. If there were no spills or leaks during any year, please provide on the spill/leak document that there were no
spills for that year. We recommend that all spills or leaks that occurr be listed on this document, regardless of the quantaty
and whether its reportable. We also ask that the manner of recovered and the mode of disoposal of any spilledtleaked
materials be listed on that document. That is the only recommendation for this facilities stormwater permit and all other
requirements of the permit are being addressed as required
Page 2 of 3
Permit: NCS000581 Owner - Facility: Duke Energy Carolinas LLC
Inspection Date: 04126;2023 Inspection Type: Comp iance Evaluation
Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
M
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
M
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
M
❑ ❑ ❑
# Does the Plan include a detailed site map includ ng outfall locations and drainage areas?
M
❑ ❑ ❑
# Does the Plan include a I st of significant spills occurring during the past 3 years?
❑
M ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
M
❑ ❑ ❑
# Does the facility provide all necessary secondary containment?
M
❑ ❑ ❑
# Does the Plan include a BMP summary?
■
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0
❑ ❑ ❑
# Does the facility provide and document Employee Training?
M
❑ ❑ ❑
# Does the Plan include a I:st of Responsible Party(s)?
M
❑ ❑ ❑
# Is the Plan reviewed and updated annually?
0
❑ ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
0
❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑ ❑ ❑
Comment: All information was provided other than teh spill loci
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? M ❑ ❑ ❑
Comment: Provided
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? M ❑ ❑ ❑
# Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ MCI
Comment: Provided
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? M ❑ ❑ ❑
# Were all outfalls observed during the inspection? M ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? 0000
# Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑
Comment: The facility has a copy of the latest COC and have evaluated for ellicit discharges
Page 3 of 3