HomeMy WebLinkAboutNCC201416_NOT Closeout Documents_20230516 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200
County: Wake Project: D.E.Benton WTP Dewatering Facilities River basin: Neuse
Person financially responsible:City of Raleigh-Ruffin L Hall,City Manager Project#: WAKE-2018-102
Address: P.O.Box 590,Raleigh,NC 27602
1. Project Location: 2301 Benson Road,Garner
Pictures: No
2. Weather and soil conditions: sunny,dry,workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Travis Warner Title: Crowder
Inspection report: Sent Report Date given/sent: November 21,2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Summers Others present: C.Amaya,M.Frazier
Date of inspection: November 16,2022 Time arriving on site: 1:10 PM Time leaving site: 1:40 PM
CC: