HomeMy WebLinkAboutNCC201288_NOT Signed Certification_20230516 NCGO1 Notice of Termination (NOT) Certification Form
Directions:
Print this form, complete,scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 6th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.221
General Permit Certificate of Coverage (COC) No.: N CC a2 012$(
Name of Project: Leos.c.uJ ak '(rz,emno<- Ph2se_ - Lots (os-j ?qr ao
Per NC General Statute 143-215.68(i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report,plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).'
Under penalty of law, I certify that:
I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge
and belief, such information is true, complete, and accurate.
Legally Responsible Organizational Entity: 'Floyd pro peAres arch Z-eve.109vyv£414 —
*Legally Responsible Person: H..S. F[pl A. -Sr.
Title of Legally Responsible Person: Q ceg;6'ervk
*Signature: '/ /� Date: 54/0s,3
Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person):
* IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV,Section B, Item (6)of the NCG010000 permit.
For more information on signatory requirements,see Part IV, Section B, Item(6)of the NCG010000 permit.