Loading...
HomeMy WebLinkAboutNCC201288_NOT Closeout Documents_20230516 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 Legacy at Traemoor Phase 2-Lots 65, County: Cumberland Project: 79&80 River basin: Cape Fear Person financially responsible:Floyd Properties and Development,Inc.-Steve Project#: CUMBE-2020-141 Floyd,President COC#:NCC201288 Address: 901 Arsenal Avenue,Fayetteville,NC 28305 1. Project Location: Candlehurst Place,Rockfish Pictures: No 2. Weather and soil conditions: dry,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one Title: Inspection report: Sent Report Date given/sent: October 15,2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: October 13,2021 Time arriving on site: 11:10 AM Time leaving site: 11:20 AM cc: