Loading...
HomeMy WebLinkAboutNCC231461_Site Plan or Location Map_20230522 .Asraem...clerve,Aat Awasoydr -40 PROTECT 44!f DUKE �� LOCATION E N E A 1)0 'rot* PROGRESS NORTH & SOUTH CAROLINA STATE MAP CASTLE HAYN E-FOLKSTON E 230KV LINE - CONNECT FCEMC HAMPSTEAD POD TAP PROJECT EROSION & SEDIMENT CONTROL & ACCESS PLAN PROJECT NARRATIVE PENDER COUNTY, NC THE PROPOSED CASTLE HAYNE-FOLKSTONE 230KV LINE-CONNECT FCEMC HAMPSTEAD POD TAP PROJECT IS LOCATED IN PENDER COUNTY,NORTH CAROLINA.THE PROJECT INCLUDES INSTALLING A NEW SWITCH AND CONSTRUCTION OF OTHER TRANSMISSION LINE IMPROVEMENTS LATITUDE: 34.369 43 80 ON THE EXISTING CASTLE HAYNE-FOLKSTONE 230KV TRANSMISSION LINE TO SUPPORT FOUR COUNTY EMC'S PLANS TO CONSTRUCT A NEW 230KV POD.THE PROJECT IS LOCATED WITHIN LONGITUDE: -77.7 8567 0° DUKE ENERGY'S MOWED AND MAINTAINED RIGHT OF WAY.THE DISTURBED AREA IS 3.8 ACRES. THE PRIOR USE OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE.PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION - CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS.PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA NORTH WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION.AN AVOIDANCE AND = MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF CAROLINA THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED SHEET LIST: RIGHT-OF-WAY ACCESS ROUTES,WHENEVER POSSIBLE.EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ.THE INITIAL PROJECT DURATION IS COVER SHEET SHT 1 OF 10 ANTICIPATED TO START IN MAY OF 2023. OVERALL PROJECT LAYOUT SHT 2 OF 10 EROSION CONTROL MEASURE QUANTITIES SHT 3 OF 10 PROJECT AREA - EROSION&SEDIMENT CONTROL PLAN SHT 4 OF 10 GENERAL NOTES EROSION&SEDIMENT CONTROL PLAN ACCESS SHT 5 OF 10 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED TO DUKE ENERGY LINE ENGINEER AND ARE - SWITCH 48-1 PAD AND ACCESS SHT 6 OF 10 FOR REFERENCE ONLY. THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. EROSION AND SEDIMENT CONTROL DETAILS 1 SHT 7 OF 10 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES.AERIAL EROSION AND SEDIMENT CONTROL DETAILS 2 SHT 8 OF 10 PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. NCGO1 DETAIL 1 SHT 9 OF 10 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE R10p21 NCGO1 DETAIL 2 SHT 10 OF 10 CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, _ RO�S EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY NC - ORE`�� 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO U REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. W 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR 3 SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE MIGRATORY BIRD HOTLINE d ENERGY. STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY 0- 5. PROJECT IS LOCATED IN THE CAPE FEAR RIVER BASIN. THE PROJECT IS NOT SUBJECT TO SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, STATE-REGULATED BUFFER REQUIREMENTS. SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO 6. SEE SHEET 7 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND o 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY.APPROPRIATE BRIDGING AND MATTING OF THESE CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. a_ FEATURESIS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF THE RIGHT-OF-WAY. CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 W 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY PERMITTING PRIOR TO USE. o_ 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU SPILL REPORTING HOTLINE OF ROCK CONSTRUCTION ENTRANCES IF DEEMED SUFFICIENT BY A DUKE ENERGY REPRESENTATIVE. IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER 10. WETLAND MATTING SHALL BE COMPOSITE MATS AND/OR HEAVY DUTY TIMBER/"CRANE"MATS. NO REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION.IMMEDIATELY NOTIFY YOUR 0 LATTICE OR TWO-PLY MATTING SHALL BE USED IN JURISDICTIONAL WETLANDS AND/OR STREAMS. SUPERVISOR AND THE FIELD ENVIRONMENTAUEHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS W 11. NO OIUFUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAUEHS PROFESSIONAL,CONTACT ONE OF 0 SURFACE WATER WITHOUT CONTAINMENT. THE DUKE ENERGY SPILL REPORTING HOTLINES AT: F 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. CAROLINAS&MIDWEST:800.527.3853 0 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE FLORIDA:866.769.1266 UJ Z DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. Z 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND 0 COVER SHALL BE USED FOR STABILIZATION. CONTACTS W VICINITY MAP OWNER:UK ENGINEER: Z DUKE ENERGY PROGRESS,LLC DEWBERRY ENGINEERS INC. JOSH WITHERSPOON ZACHARY EULO,PE Y SCALE:1:20,000 410 S.WILMINGTON ST. 2610 WYCLIFF ROAD 0 RALEIGH,NC 27601 SUITE 410 co PH:(919)546-2177 RALEIGH,NC 27607 UJ JOSH.WITHERSPOON%DUKE-ENERGY.COM PH:919.425.7610 Z CONTRACTOR SHALL NOTIFY"NORTH CAROLINA ONE CALL"(811)OR ZEULO@DEWBERRY.COM FO co (1-800-632-4949)AT LEAST 48 HOURS PRIOR TO BEGINNING p1101110gi CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. ����N OAR��i J CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED �oQ�'FEss`/d •I 2b y.ro 8$1 THEIR OWN LOCATOR SERVICES INDEPENDENT OR"NORTH CAROLINA = cam SEAL - Z ONE CALL".REPORT ANY DISCREPANCIES TO THE ENGINEER * 7 • ® DUKE RE CASTLE HAYNE-FOLKSTONE 230KVIMMEDIATELY. Dewberry f w LINE-CONNECT FCEMC HAMPSTEAD x ie Y/� POD TAP PROJECTA!l . 1I055132 Z ❑��"` Dewberry Engineers Inc. ENERGY ~ 31 y 2$ 2610 WYCLIFF ROAD ® C E21019301 03/15/2023 100%FOR PERMITTING ZAE FDR ZAE SUITE 410 100/o FOR PERMITTING NE: NC 27607 PROGRESS COVER SHEET0 B E21019301 02/28/2023 90%FOR DEP REVIEW ZAE FDR ZAE 0 RALEIGH,FAX:A 919 6t9929 A E21019301 11/16/2022 60%FOR DEP REVIEW DM EBS EBS 919.881.9923 411 FAYETTEVILLERALEIGHN.C. STREET6 Nww.de b F-0929 N. .27601 SIZE DRAM. SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED DO NOT USE FOR CONSTRUCTION Dewberry Project No.50130788 www.dewberry.coro TELEPHONE NO.(919)546-2090 D E21019301 1 OF 10