Loading...
HomeMy WebLinkAboutNCC210521_NOT Signed Certification_20230516 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form, complete,scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street,6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] O RAN G-2020-012 General Permit Certificate of Coverage (COC) No.: Name of Project: Jones Ferry Road WTP Finished Water Distribution Resiliency Improvements Per NC General Statute 143-215.68(i), any person who knowingly makes any false statement,representation,or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge and belief,such information is true,complete, and accurate. Legally Responsible Organizational Entity: Orange Water and Sewer Authority *Legally Responsible Person: Todd Taylor(Formerly Ed Kerwin) Title of Legally Responsible Person: Executive Director *Signature: , _ Date: 461202..� � Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person): * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6)of the NCG010000 permit. For more information on signatory requirements,see Part IV, Section B, Item (5)of the NCG010000 permit. Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200 County: Orange Project: Jones Ferry Road WTP Finished Water River basin: Cape Fear Person financially responsible:Orange water and Sewer Authority-Ed Kerwin, Project#: ORANG-2020-012 Executive Director Address: 400 Jones Ferry Rd,Carrboro,NC 27510 1. Project Location: Jones Ferry Road,Carrboro Pictures: No 2. Weather and soil conditions: Dry and sunny Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): John Miller Title: Senior Associate Inspection report: Sent Report Date given/sent: April 11,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Abdulrahman Fayad Others present: Date of inspection: April 11,2023 Time arriving on site: 1:00 PM Time leaving site: 1:30 PM CC: