HomeMy WebLinkAboutNCC231542_ESC Approval Submitted_20230522 ROY COOPER d.,,.' ,
Governor
ELIZABETH S. BISER4, -_...)
Secretary
DOUGLAS R.ANSEL ;--
Interim Director NORTH CAROLINA
Environmental Quality
May 12, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Fairview Fire and Rescue
Attention: Jody Mills, President of Board
7402 Concord Highway
Monroe,North Carolina 28110
RE: Project Name: Fairview Fire and Rescue
Acres Approved: 3.868
Project ID: UNION-2023-050
County: Union, City: Monroe
Address: US Hwy 601
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Nicholas Buysse, PE, CESI
Date Received by LQS: April 27, 2023
Plan Type: Revised
Dear Sir and/or Madame:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications.The Modifications Required for
Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) foiiu requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions
for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC
prior to commencement of any land disturbing activity. The eNOI fouu may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible
party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Mooresville Regional Office i 610 East Center Avenue,Suite 301(Mooresville,North Carolina 28115
704-663-1699
;emu
Letter of Approval with Modifications
Fairview Fire and Rescue
May 12,2023
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCGO1 peiiuit require that the following documentation be kept on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of existing
natural resources and adjoining properties. If,following the commencement of this project, it is determined that
the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution
Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to
the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Foim, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notified this office of the proposed
starting date for this project.
Your cooperation is appreciated.
Sincerely,
0,-4,4;,) i
Shannon Leonard
Assistant Regional Engineer
Land Quality Section ti
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Inspection Department
ec: Nicholas Buysse, PE
Letter of Approval with Modifications
Fairview Fire and Rescue
May 12,2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Fairview Fire and Rescue
Project ID: UNION-2023-050
County: Union
1. The Financial Responsibility/Ownership Faun (FRO) that was submitted does not appear to contain the
correct information in Part B, Item 2(a) and the Notary did not fill out the required information on Page 3.
Note: The NC Secretary of State Business Registry shows a different Registered Agent from the individual
listed on the FRO under Part B, Item 2(a). It should be noted that the Registered Agent mailing address on
the NC Secretary of State Business Registry website appears to be outdated (e.g. Route 7). The Financial
Responsible Entity needs to ensure the NC Secretary of State Business Registry has the correct information
for the Registered Agent and mailing address. Once the Registered Agent information has been verified
and/or corrected, revise the FRO as necessary. A revised and completed FRO shall be submitted prior to
the start of land disturbance activities.
2. The proposed silt fence located below DA-C shall be installed upstream of the existing drainage channel
(e.g. drainage from SE to NW), such that disturbance within the channel does not occur. A sufficient
number of stone outlets in the silt fence shall be installed in the low-lying areas along the northern side of
DA-C.
3. The plans appear to show off-site drainage, South of the proposed soil stockpile, flowing onto the site. The
plans do not show the existing storm drainage inlets and/or pipe systems on the adjacent property to the
South. Aerial imagery appears to show this area possibly being conveyed in an existing ditch line, flowing
to the southwest towards US Hwy 601. The off-site flow path cannot be verified. The skimmer basin was
not sized for the off-site runoff. A field inspection must be conducted prior to the start of land disturbance
activities to verify flow to the proposed skimmer basin. If the off-site area drains to the basin, a revised
plan shall be submitted to properly size the skimmer basin for the total drainage area. Any resizing of the
basin shall be conducted prior to the start of land disturbance activities.
0
04
0 ,....„ =+
CI 4f)
w) N N
t
ig 10 �, Y . 1
3 z
. m c - Cf:,, - ,,-,_-:_l i
i ���a���
v
g
0110 U
a)
® 6 0 0 ® to