Type of Visit: Q Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: O Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: �'�j 2�nn Arrival Time: Departure Time: 1 i County:
Farm Name: Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: yy�� t y Title:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Latitude:
Pheue:
Integrator:
Certification Number:
Certification Number:
Longitude:
Region:
`� 1 `� 153c' S-?6' 1
u
E
E Tlesign
Desi n Current,€,
Current Ues�gn C remt
Sw►ne Capaeriy'op Weoultry Capacity . PgpiYapac�ty T.Pop
E .
o ..
Wean to Finish
€' ;,
Layer
Dairy Cow
Wean to Feeder
Non Layer
Dairy Calf
_
Feeder to Finish
'4'Dairy Heifer
Farrow to Wean'
Designs
gent Dry Cow
Farrow to Feeder
I)ry i'oultry Caac
" , Non -Dairy -`
Farrow to Finish
3=
Layers
Beef Stocker
Gilts
Non -Layers
Beef Feeder
Boars
➢ :
PulletsI
jBeef Brood Cow
,
-7 M ME,
Turkeys
Y
"0� _
Qher
_
Turkey Poults�,
Other
Elm.,
Discharl4es and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
No
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑Other:
a. Was the conveyance man-made?
❑ Yes
❑ No
NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No •
/ NA
❑ NE
c. What�is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑Yes
❑ No
NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
F2<S
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
No
❑ NA
❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: jDate of Inspection: j 11 2
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard? ❑ Yes
Structure 1 Structure 2 Structure 3 Structure 4
Identifier: I
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 1
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
Structure 5
No❑ NA ❑ NE
❑ No I �� A ❑ NE
Structure 6
❑ Yes No ❑ NA ❑ NE
❑ Yes El<o ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmentthreat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
❑ No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
�io
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
Q o
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
5eNo
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge
into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
6 No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
P p Y P g PP q
❑ Yes
To
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes;
-/No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes L. "" ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ZNo ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: 6 7 - Date of Inspection: f
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ®No ❑ N ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [—]Yes [o A ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o ❑ N ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No L lit' ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes o ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
Yes 2No ❑ NA ❑ NE
[:]Yes No ❑ NA ❑ NE
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes
34. Does the facility require a follow-up visit by the same agency? ❑ Yes
❑ No
U4
❑ NE
No
❑ NA
❑ NE
L�f 1V
❑ NA
❑ NE
No
❑ NA
❑ NE
Comments (refer fo que 'taon '. Explain any YES answers and/or any, addittonk recommendattgps ox any 0,t comments ,
tJsixalpacYbxn,necledra iatptacesssairy}
J
Reviewer/Inspector Name:
Phone:
Reviewer/Inspector Signature:
Date:
Page 3 of 3 511212020