Loading...
HomeMy WebLinkAbout20110615 Ver 3_Application_20150601Ms. Karen Higgins Division of Water Quality 512 N. Salisbury Street Mail Stop 942G1 Raleigh, NC 27604 RE: Desert Wind Project 401 Water Quality Certificate Modification DWQ #20110615, Ver. 2 Dear Ms. Higgins: �d� � c�InISV 3 May 15, 2015 uuJUN o 1 2015 In an effort to optimize and refine the Project Design for the Desert Wind Project, Atlantic Wind, LLC has identified an opportunity to improve construction access to the Project site. Atlantic Wind respectfully requests modification of the Water Quality Certificate (see attached) for changes to the overall Project Design, as described in detail below and within the attached documents. Under the current Certificate for the Desert Wind Project, construction vehicles would access the Site from Turnpike Road (SR 1001) via North Carolina (NC) State Highway 158 (See attached Ditch Impact Overview Map). It was assumed for the Certificate that Turnpike Road (SR 1001) would be temporarily widened to accommodate turn radii at the intersection of Turnpike Road (SR 1001) and NC 158, as well as at Turnpike Road where entering the Site. No upgrades or replacements were proposed by Atlantic Wind for any bridge crossings. All proposed roadway improvements would occur within existing North Carolina Department of Transportation (NCDOT) rights -of -way. In an effort to minimize overall disturbance and impact to roads, residences, and communities along these roads, Atlantic Wind, LLC proposes an alternate primary construction access off of US Hwy 17. This alternate route would follow an existing farm access road directly into the Project site (See attached Ditch Impact Overview Map). Improvements would be required at the intersection of this access road and US Hwy 17 as well as the intersection at SR 1469 and the entire length of the access road (approximately 16,650 feet) would be temporarily widened. Construction access via the US Hwy 17 route will alleviate potential indirect impacts and disturbances to area residences and communities resulting from using the Turnpike Road as primary access for construction (construction traffic, noise, dust, etc.). All impacts to waters (ditches) associated with the US Hwy 17 access route are short-term and temporary, and specifically associated with expanded turning radii at the intersections and new culverts /culvert extensions associated with the road widening. The Turnpike Road (SR 1001) access will be utilized as the primary access /entrance to the Site during operations (following project construction). The US Hwy 17 route will be the primary access during construction. Following completion of all construction, the US Hwy 177 corridor will be restored to pre- construction conditions and the permanent project entrance will be the Turnpike Road access point. laerdrola Renewables, LLC Two Radnor Coipc, ate Center, 4uatie 2001 100 Matso ,ford R =,ad Radnor, PA 19087 Telephone (484) 6r)4-1807, Fay t434? 654- 1 009 ���s.iberd� ola�erie�vabl�s ,;� The following permit drawings are included as part of this submittal to document the specific location and acreages associated with the new temporary impacts to jurisdictional waters (ditches): • Ditch 39 (associated with expanded turn radii at US Hwy 17) - 0.0059 acre • Ditch 38 (associated with expanded turn radii at US Hwy 17) — 0.0061 acre • Ditch 37 (associated with culvert extension) — 0.0005 acre • Ditch 36 (associated with new culvert) — 0.0170 acre • Ditch 30 (associated with culvert extension) — 0.0013 acre • Ditch 25 (associated with culvert extension) — 0.0013 acre • Ditch 18 (associated with culvert extension) — 0.0010 acre • Ditch 42 (associated with expanded turn radii at SR 1469) — 0.0518 acre TOTAL NEW TEMPORARY IMPACT: 0.0849 acre To offset the temporary impacts to jurisdictional waters associated with this alternate primary construction access, Atlantic Wind, LLC has modified the Project Design to further avoid and minimize impacts authorized through Permit Action ID SAW- 2010 - 00903. As a result, there will be a decrease in impacts to jurisdictional areas associated with this alternate construction access. The approximately 0.085 acre of temporary impact anticipated from this construction access will be offset through footprint reduction measures that will be implemented during construction. Specifically, the construction easement footprint of wind turbine generator (WTG) R7 has been reduced to further minimize the impacts to adjacent jurisdictional waters (ditches) that were previously authorized for impacts under the existing project permit (See Attached). The following permit drawings are included as part of this submittal to document the specific location and acreages associated with these reduced impacts to jurisdictional waters (ditches): Ditch D609 (reduced WTG construction footprint) • Authorized permit impact area: 0.3059 • Reduced impact area: 0.0550 • Permit impact balance: 0.2509 Ditch D613 (reduced WTG construction footprint) • Authorized permit impact area: 0.1103 • Reduced impact area: 0.0559 • Permit impact balance: 0.0544 TOTAL IMPACT REDUCTION: 0.1109 acre In summary, the alternative primary construction access road will result in temporary impacts to 0.0849 acre of jurisdictional waters (ditches) and the reduced construction easement footprint for the WTG will reduce the permitted project impacts to jurisdictional waters by 0.1109 acre resulting in a net overall project impact reduction of 0.026 acre. The U.S. Army Corps of Engineers provided their authorization to move forward with these proposed changes on September 9, 2014. Specifically, the U.S. Army Corps of Engineers confirmed that the proposed changes would not require the modification of Permit SAW -2010- 00903, but that a Memorandum for the Record was issued to the existing file with the attached supporting information (see attached). Atlantic Wind, LLC has received a Stormwater Permit and Erosion and Sediment Control approval from the North Carolina Department of Natural Resources for the alternative US Hwy 17 access (see attached). 1berdrola Renewabies. LLC !pGI Rad nor Go, poratt, Gen' ze! Suite 100 MLatsnntofd Foal, R+]itloi, PA 19087 Tolep cone (484) 254-1867; Fax ;4841 664 -1069 vomw 3tieidrolaisnewab1es.us We are coordinating with the North Carolina Division of Coastal Management concurrently to modify and /or update the Coastal Management Certification that was issued for the Project on March 5, 2012 (see attached). This proposed temporary construction access was surveyed for archaeological resources and reported to the North Carolina Department of Cultural Resources, State Historic Preservation Office (SHPO) in November 2011. This supplemental investigation concluded that since no artifacts were recovered during survey efforts, no historic properties would be affected by the proposed alternate construction access, and that no further work is recommended. The SHPO concurred with the conclusions of this supplemental report in a letter dated December 13, 2011. Atlantic Wind, LLC also has been coordinating with the NCDOT regarding the design of this alternate construction access. All entrances onto US Hwy 17 will be designed and constructed in accordance with applicable NCDOT rules and guidelines. Thank you for your continued efforts on the Desert Wind Project. If you have any questions or require any additional information to proceed with this request for modification, please do not hesitate to contact me. We look forward to hearing from you soon. Sincerely, Michael Clayton Permit Manager Iberdrola Renewables, LLC Cc: Craig Poff /Iberdrola Renewables Walter Meisner /Iberdrola Renewables Iberdrola Rene aWes;L LC a Ywn Ra dnc .'- ruoralp £vp Eie4 Suke 200 Telephone (W^ &'-7354-18667- Fax 654-1069 wwvv -�� N� North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chuck Wakild, P.E. Governor Director January 19, 2012 Mr. David Shadle Atlantic Wind, LLC 201 King of Prussia Road, Suite 500 Radnor, PA 19087 Re: Desert Wind Power Project, Perquimans and Pasquotank Counties DWQ #20110615, Ver. 2; USACE Action ID. No. SAW - 2010 -00903 Perquimans River [030152, 30- 6- 5 -(2), SC] APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Shadle: Dee Freeman Secretary Attached hereto is a copy of Certification No. 3878 issued to Mr. David Shadle and Atlantic Wind, LLC, dated January 19, 2012. This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0259. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non - discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. a I harles Wakild, P.E. C W/kah/ijm Attachments: Certificate of Completion cc: Becky Fox, EPA, 1307 Firefly Road, Whittier, NC 28789 USACE Washington Regulatory Field Office Roberto Scheller, DWQ Washington Regional Office Michael Clayton, Atlantic Wind, LLC, 201 King of Prussia Road, Suite 500, Radnor, PA 19087 Beth Reed, KHA, Inc., 3001 Weston Parkway, Cary, NC 27513 File Copy Filename: 110615 Ver2DesertW indPowerProject (PerquimansAndPasquotank)401 _IC Wetlands, Buffers, Stormwater Compliance and Permitting Unit (WeBSCaPe) 1650 Mail Service Center, Ralegh, North Carolina 27699 -1650 Phone: 919-807 -63001 FAX 919 807.6494 Internet http , //portal.ncdenr.org!weblwglws An Equal Opportunity 1 Affirmative Action Employer Mr. David Shadle and Atlantic Wind, LLC Page 2 of 5 January 19, 2012 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95 -217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 and approved"authorization for impacts to the protected riparian buffers per 15A NCAC 2B .0259, to Mr. David Shadle and Atlantic Wind, LLC, who have permission to fill or otherwise impact 278.44 acres of 404 /wetlands (29.23 acres of permanent impact and 249.21 acres of temporary impact) and 47.04 acres of jurisdictional waters (ditches) (1.37 acres permanent impact and 45.67 acres temporary impact) to construct a wind energy generation facility on the, property, which is located on a 2,513 acre portion of a 24,242 acre project area 7.5 miles west of Elizabeth City and 2.5 miles north of the Town of Windfall in Perquimans and Pasquotank Counties, North Carolina, pursuant to an application dated August 19, 2011, and received by the DWQ on September 16, 2011, and by Public Notice issued by the USACE on September 2, 2011, and received by the DWQ on September 2, 2011, and by additional information received on November 15, 2011, November 16, 2011, and December 19, 2011. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92 -500 and PL 95 -217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts to wetlands, streams, and/or buffers, are approved including incidental impacts: of Wetland Amount Approved Units Plan Location or Reference -Type 404 /Wetlands — non -riparian 278.44 [(acres) 29.23 acres of Application and Public Notice permanent impact and 249.21 acres of temporary impact] Open Water (ditches) 47.08 [(acres) 1.37 acres permanent Application and Public Notice impact and 45.67 acres temporary impact] Mr. David Shadle and Atlantic Wind, LLC Page 3 of 5 January 19, 2012 Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. TheJesign, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal; or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. - The devices shall be maintained omall construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 3. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the 404/401 Permit Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 4. Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project; 5. Protective Fencing - The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; Continuing Compliance: 6. Mr. David Shadle and Atlantic Wind, LLC shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or-achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the Certification, the Division shall notify Mr. David Shadle and Atlantic Wind, LLC, and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 21-1.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. David Shadle and Atlantic Wind, LLC in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued Mr. David Shadle and Atlantic Wind, LLC Page 4 of 5 January 19, 2012 pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; Miti ag tion: 7. Compensatory Mitigation Using the Great Dismal Swamp Restoration Bank, LLC Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Great Dismal Swamp Restoration Bank, LLC to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the Great Dismal Swamp Restoration Bank, LLC receives and clears your check, no impacts specified in this Authorization Certificate shall occur. The Great Dismal Swamp Restoration Bank, LLC should be contacted at (757) 487 -3441 if you have any questions concerning payment into a restoration fund. 404/Wetlands — non - riparian 1 29.23 (acres) I Pas4uotank/03010205 I 8. Construction Stormwater Permit NCGO 10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self - monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at: http: / /portal.ncdenr.org /c /document library /get fik?uuid=d15e7ee8-cb50-443f- 9dcf- 049b001337ac &oroald =38364 ; Re- opener Clause 9. Mr. David Shadle and Atlantic Wind, LLC, and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. Mr. David Shadle and Atlantic Wind, LLC, shall require its contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and/or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 02H.0507(d). Before modifying the certification, DWQ shall notify Mr. David Shadle and Atlantic Wind, LLC, and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H.0504. Any new or revised conditions shall be provided to Mr. David Shadle and Atlantic Wind, LLC, in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. i� M 0 Mr. David Shadle and Atlantic Wind, LLC Page 5 of 5 January 19, 2012 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe), North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699 -6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. 3878 CW/kah/#m This the 19'h day of J nuary Alt O WA Q ITY ikild, P.E. A� NCDETIR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director DWQ Project No.: W- O l.c 1 S V z Applicant: Project Name: • A i •.r Date of Issuance of 401 Water Quality Certification: 1 - i R - 12. Certificate of Completion Dee Freeman Secretary Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 /Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification hereby state that, to the best of my abilities, due care and diligence was used in.the °observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans' and specifications, and other supporting materials. Signature: Date: If this project was designed by a Cerdj7ed Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date 1630 Mail Service Center, Ra 3i h, North Carolina 276991650 Location:: 12 N Salisbury St Floor 9 Paleigh North Carolii.a 2760; -1170 ne Phone 9: 3. 807 -63011 FAX: 919.807 3494 NL06fth Caro1 in Internet a ^uw acw- °rqua6ty.org �y p /f An EquRI C. po- tumty' iffirmaUve klton ? ip oyer bb . �d 9e s� .�y APA HCDEE R North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Eaves Perdue Braxton C. Davis Governor Director March 5, 2012 Michael Clayton Iberdrola Renewables, Inc. 201 King of Prussia Road, Suite 500 Radnor, PA 19087 Dee Freeman Secretary SUBJECT: CD12 -013 - Consistency Certification Proposed Wetland Impacts to Facilitate the Installation of Wind Powered Turbine Generators, Pasquotank and Perquimans Counties, North Carolina (DCM #20110148) Dear Mr. Clayton: We received the consistency certification of Iberdrola Renewables, Inc., on behalf of Atlantic Wind, LLC ( "Applicant'), on September 6, 2011 for proposed temporary and permanent impacts to Section 404 wetlands to facilitate the installation of approximately 150 wind powered electric turbines on an approximate 24,242 project site west of Elizabeth City in Pasquotank and Perquimans Counties, North Carolina. Atlantic Wind, LLC is a subsidiary of lberdrola Renewables, Inc. The proposed project has informally been identified as the "Desert Wind Power Project". The location of the proposed project is approximately 7.5 miles west of Elizabeth City and approximately 2.5 miles north of the. Town of Winfall. The proposed project area will be situated on 24,242 acres of privately -owned land within Pasquotank and Perquimans counties in an area known locally as the "Desert'. The project area is located between Highway 158 to the north, Highway 17 to the east and south and County Road 1002 to the west. The proposed project will consist of up to 150 wind powered electric turbines, each with a projected capacity of approximately 2.0 MW, for a total installed capacity of 300 MW. The construction- related facilities will consist of the following: 150/ 2.0 MW Gamesa G97 (or similar) wind turbine generators; Permanent and temporary access roads to each turbine; Temporary crane paths; 400 Commerce Ave., Morehead City, NC 28557 -3421 tia Phone: 252 -808 -28081 FAX: 252 - 247 -3330 Intemet: www.nocoastalmanaaement.net /C�ya� r/o/l /ina An Equal Opportunity 1 Affirmative Action Empbyer K` 2 • Underground and overhead 34.5 kilovolt ( "kV') electrical collector lines connecting the turbines to the Collection Substation; • A 34.5 kV to 115 kV Collection Substation facility; • A 115 to 230 kV Transmission Voltage Step -up Substation facility (the "Step -up • Substation'); • An approximately 5.5 mile long, 115 kV overhead Sub - Transmission Line connecting the Collection Substation to the Step -up Substation; • A 230 kV Interconnection Switching Station facility (the "Switching Station'); • An Operations and Maintenance ( "O &M") facility; • One permanent meteorological tower; • A temporary batch plant; and • A temporary lay down and contractor staging area. The proposed project is anticipated to impact approximately 278.44 acres of Section 404 wetlands (29.23 acres of permanent impact and 249.21 acres of temporary impact) and 47.04 acres of jurisdictional waters (ditches), including 1.37 acres of permanent impact and 45.67 acres of temporary impact. Construction is anticipated to occur over a one year period. The acquisition of approvals for Erosion and Sedimentation Control Management Plans and Stormwater Management permits will be phased. Compensatory mitigation for permanent impacts will be provided through the purchase of wetland mitigation credits from the Great Dismal Swamp Restoration Bank, LLC. Additionally, the applicant proposes to implement a post - construction avian and bat fatality monitoring program to assess the effect of the completed project on birds and bats. To solicit public comments, the North Carolina Division of Coastal Management (DCM) circulated a description of the proposed project to State agencies that would have a regulatory interest in the proposed development. Additionally, a public notice was printed in the "Daily Advance" on September 13, 2011. No comments were received asserting that the proposed project would be inconsistent with the State's coastal program. However, concerns were expressed by several State agencies and one member of the public related to minimizing adverse effects of the proposed project to the environment. The one member of the public who responded believed that the proposed project would have significant adverse environmental effects. In a letter dated November 7, 2011 the Applicant provided a response to nearly all of these comments. Furthermore, the Applicant proposes to implement a "Post Construction Fatality Monitoring" program to examine the post construction effects of the planned project on avian and bat mortality. Additionally, DCM has conditioned the proposed project as expressed below to minimize its adverse impacts on the environment. The DCM has reviewed the consistency submission pursuant to the management objectives and relevant enforceable policies of Subchapters 7H and 7M of Chapter 7 of Title 15A of the North Carolina Administrative Code which are a part of the State's certified coastal management program. Based on this review, DCM concurs, as conditioned below, that the proposed project is consistent with North Carolina's coastal management program. The Applicant shall comply with the following conditions of concurrence. Page: 2 K • The Applicant shall comply with the 401 Water Quality Certification (DWQ#20110615, Ver.2) issued by the NC Division of Water Quality for this project on January 19, 2012. • The Applicant, prior to initiating any land disturbing activities, shall obtain the approval of the NC Division of Land Resources of an erosion and sedimentation control plan applicable to that phase of development. The Applicant shall comply with the requirements of the approved erosion and sedimentation control plan. A copy of the plan approval for each phase shall be forwarded to DCM. • The Applicant, prior to initiating any land disturbing activities, shall obtain a stormwater permit from the NC Division of Water Quality applicable to that phase of development. The Applicant shall comply with the requirements of the stormwater permit. A copy of the permit for that phase shall be forwarded to DCM. • The Applicant shall adhere to their mitigation commitment to purchase up to 30 acres of wetland mitigation from the Great Dismal Swamp Restoration Bank, LLC. • The Applicant shall avoid any impacts to the 123.48 acre U.S. Department of Agriculture Wetland Reserve Program easement identified by the NC Natural Heritage Program in their response dated September 21, 2011. • The Applicant shall revise the "Post Construction Fatality Monitoring" program to incorporate the standards identified below to the satisfaction of the North Carolina Wildlife Resources Commission ( NCWRC) in consultation with DCM. o The Applicant shall provide the NCWRC a copy of any reports submitted to the US Fish and Wildlife Service (USFWS). o The Applicant shall coordinate with the NCWRC the implementation of a tundra swan survey and report to assess the effect, if any, of the proposed project on tundra swans. The surveys of tundra swans will be conducted from mid - November through early March for a minimum of three years. Upon the conclusion of the survey the Applicant shall provide the NCWRC with a report summarizing the results of that survey. o The Applicant shall coordinate the selection of the five turbines that will used for avian and bat mortality studies with the NCWRC. • The Applicant, prior to initiating any land disturbing activity or any other activity that could directly or indirectly affect historic properties (including physical, visual, atmospheric, or audible effects), shall determine, in consultation with the North Carolina State Historic Preservation Officer (SHPO), whether any of the properties shown below are eligible for listing in the National Register of Historic Places (NRHP). If any of these properties are determined eligible for listing in the NRHP, the Applicant and lead federal agency shall take into account the effect of the undertaking on the eligible properties in accordance with 36 C.F.R. §800, and provide written documentation to the Division of Coastal Management that the Applicant, SHPO, and any other consulting parties have satisfactorily resolved any historic preservation concerns for the eligible properties. o Cumberland School (PQ 0051) o Joel Hollowell House (PQ 0094) o Burwell S. Riddick House (PQ 0202) o Robert Riddick House (PQ 0205) o Riddick's Store and Nicanor Post Office (PQ 0209) o Speight -Morgan House (PQ 023 1) o James Stallings House (PQ 0234) Page: 3 o Up River Friends Meeting House (PQ 0257) o Thomas D. White House (PQ 0295) o Samuel Winslow House (PQ 0315) o House (115 Hickory Cross Road) (PQ 0730) o Up River Cemetery (PQ 0736) o Gas Station and Feed Store (PQ 0741) o Whiteson Community Building (PQ 0747) o House (351 Up River Road) (PQ 0754) o House (550 Sandy Cross Road) (PQ 0770) o House (Lake Road) (PQ 0814) o House (107 Lowes Lane) (PQ 0839) • The Applicant, prior to initiating any land disturbing activity, shall adhere to the SHPO's request in its letter of December 13, 2011, to avoid impacts to Site 31PQ223 and to install fencing no closer than eight (8) feet from Site 31PQ223. An archaeologist shall monitor the clearing and installation of the fence. If the archaeologist determines that any of these activities will affect Site 31 PQ223, archaeological testing shall be undertaken to establish the site's National Register eligibility. If 31 PQ223 is determined eligible for listing, the Applicant, after consulting with the SHPO, shall develop and implement appropriate mitigation measures. Should the project be modified, a revised consistency certification could be necessary. This might take the form of either a supplemental consistency certification pursuant to 15 CFR 930.66, or a new consistency certification pursuant to 15 CFR 930.57. Likewise, if further project assessments reveal environmental impacts not previously considered by the proposed development, a supplemental consistency certification might be required. If you have any questions, please contact Stephen Rynas at 252- 808 -2808 x209. Thank you for your consideration of the North Carolina Coastal Management Program. Sincerely, o� P O Doug Huggett Manager, Major Permits and Consistency Unit cc: Braxton C. Davis, Division of Coastal Management Frank Jennings, Division of Coastal Management Maria Dunn, NC Wildlife Resources Commission Ramona M. Bartos, NC State Historic Preservation Office Harry LeGrand, NC Natural Heritage Program Ian McMillan, NC Division of Water Quality Kelly Williams, NC Ecosystem Enhancement Program Tracy Wheeler, U.S. Army Corps of Engineers Page: 4 Clayton, Michael From: Barnes, Kyle W SAW < Kyle.W.Barnes@usace.army.mil > Sent: Tuesday, September 09, 2014 1:26 PM To: Clayton, Michael Cc: Beth.Reed @kimley- horn.com; Chad.Evenhouse @kimley - horn.com Subject: Ibedrola Renewables Permit Mod (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Michael, Thank you for your patients while I have reviewed the information that you submitted for the project modification to the Desert Wind Project in Perquimans and Pasquotank Counties. The US Corps of Engineers received your modification request to create a new construction access point to the Desert Wind Project, SAW- 2010 - 00903. The new construction access point would originate at an existing forestry and agriculture road adjacent to US Hwy 17 near the intersection with NC 158 in Morgan's Corner in Pasquotank County, North Carolina. The proposed utilization of the existing road would require 0.0849 acres of temporary impacts to Waters of the US resulting from the improvements required for the ingress and egress of large construction equipment. By utilizing the new construction access point the need for roadway improvements to the original approved construction access will reduce the overall project impacts to jurisdictional Waters and Wetlands by 0.1109 acres. The reduction of impacts to Waters and Wetlands of the US as proposed in your request will not require the modification of permit SAW -2010- 00903. The projects reduction of impacts to jurisdictional areas satisfies the review of Avoidance and Minimization within the existing permitted area. I have issued a Memorandum for the Record (MFR) to the existing file with the supporting information that you submitted. In addition I have added this correspondence as well. This allows you to move forward with the requested changes to your project as indicated in your letter issued to this office on July 1, 2014. Please feel free to contact me if you have additional questions regarding your modification or this correspondence. Thank you, Kyle Kyle Barnes US Army Corps of Engineers Wilmington District Washington Field Office 910 -251 -4584 \ �wuo� ♦ ♦ Df1 39 NOTE: WETLAND LOCATED USING MAPPING GRAD CULVERT LOCATION SAS ED ON SURVEYED DITCH \ ` LOCATION LEGEND JURISDICTIONAL WATER (DITCH) DITCH 39 ,l Proposed Tine DISTURBANCE DATA: Culvert Proposed C PROJECT: _ — • Ditch Centerline — Road Centerine Impact: DITCH 39 DESERT WIND PASQUOTANK COUNTY County L Type: Temporary NORTH CAROLINA ° Wetlands I Area (ac): 0.0059 USACE AID #: u O Cunent Ditch Impact DATE: 6/19/2014 s Ddch Impact PREPARED BY: y FISHER ASSOCIATES PE, LS, PC N Access Roatl 3 = Q Temporary Limit. o /Distubance inch = 200 feet n . Removed Disturbance Area 135 CALKINS ROAD A IBERDROLA ROCHESTER, NY 14623 r I HE.R.`, RENEWABLES I�AIC'f: �� ♦♦ DfTCN U a♦ ♦ � ♦ ,�tP NOTE WETLAND LOCATED USING MAPPING GRADE GPS CULVERT LOCATION BASED ON SURVEYED DITCH \ LOCATION LEGEND Proposed Turbine Proposed Culvert Ditch Centedine Road Centedine Parcels L1 County Boundary Wetlands Current Ditch Impact Ditch Impact Access Road Temporary Limits of Disturbance - Removed Disturbance Area JURISDICTIONAL WATER (DITCH) DISTURBANCE DATA: Impact: DITCH 38 Type: Temporary Area (ac): 0.0061 PREPARED BY: FISHER ASSOCIATES PE, LS, PC 135 CALKINS ROAD ROCHESTER, NY 14623 DITCH 38 PROJECT: DESERT WIND PASQUOTANK COUNTY NORTH CAROLINA USACE AID #: DATE: 6/19/2014 N ALI SHE f7.--.!:!. "ii - 1 inch = 200 feet IBERIDROLA REIN EWABL WA[3LE5 NOTE WETLAND LOCATED USING MAPPING GRADE GPS. CULVERT LOCATION BASED ON SURVEYED DITCH LOCATION LEGEND Proposed Turbine Proposed Culvert • Ditch Centerline Road Centerline Parcels L1 County Boundary Wetlands Current Ditch Impact Ditch Impact Access Road Temporary Limits of Disturbance - Removed Disturbance Area T, Dnr.H V JURISDICTIONAL WATER (DITCH) DISTURBANCE DATA: Impact: DITCH 37 Type: Temporary Area (ac): 0.0005 PREPARED BY: 3 FISHER ASSOCIATES PE, LS, PC 135 CALKINS ROAD ROCHESTER, NY 14623 rISHE� ♦ ilk ♦ 3a DITCH 37 PROJECT: DESERT WIND PASQUOTANK COUNTY NORTH CAROLINA USACE AID * DATE: 6/19/2014 N A 1 inch = 200 feet IBERDROLA RENEWABLES IMPACT' DITCH 36 LEGEND JURISDICTIONAL WATER (DITCH) DITCH 36 Proposed Turbine DISTURBANCE DATA: Proposed CuNett PROJECT: .. Ditch Cemedine Parcels Impact: DITCH 36 p DESERT WIND L j County Boundary PASQUOTANK COUNTY Wetlands Type: Temporary NORTH CAROLINA Cunent Ditch Impact Area (ac): 0.0170 USACE AID #: Ditch Impact Access Road DATE: 6/19/2014 PREPARED BY: .: N Temporary Limits of Disturbance - Removed Disturbance Area FISHER ASSOCIATES PE, LS, PC n 1 inch = 200 feet IOTE WETLAND LO C ATED USING MAPPING GRADE GPS BASED ON SURVEYED DITCH 135 CALKINS ROAD A IBERDROLA RENEWABLES WLVERT LOCATION OCATION ROCHESTER, NY 14623 IMPACT: DITCH 30 LEGEND JURISDICTIONAL WATER (DITCH) DITCH 30 Proposed Turbine DISTURBANCE DATA: Proposed Culvert PROJECT: — Ditch Centedine P.r.el, Impact: DITCH 30 p DESERT WIND L County Boundary PASQUOTANK COUNTY j Wetlands Type: Temporary NORTH CAROLINA Current Area (ac): 0.0013 USACE AID #: Ditch Impact DATE: 6/19/2014 Access Road Temporary Limits of Disturbance PREPARED BY: A I V IFISHER - - Removed Disturbance Area ASSOCIATES PE, LS, PC 1 inch = 200 feet I NOTE'. - TLAN DLOCATEDUSINOMAPPINGORADEGPS 135 CALKINS ROAD A IBERDROLA CULVERT LOCATION BASED ON SURVEYED DITCH I nr ATION ROCHESTER, . NY 14623 RENEWABLES IMPACT: DITCH 25 O LEGEND JURISDICTIONAL WATER (DITCH) DITCH 25 Proposed Turbine DISTURBANCE DATA: — Propased Culvert PROJECT: — - Ditch Centerline i � Parcels Impact: DITCH 25 DESERT WIND j County Boundary PASQUOTANK COUNTY j Wetlands Type: Temporary NORTH CAROLINA Current Ditch Impact Area (ac): 0.0013 USACE AID #: FDitch Impact DATE: 6/19/2014 Q Access Road Temporary Limits of Disturbance PREPARED BY: A I IV - Removed Disturbance Area FISHER ASSOCIATES PE, LS, PC 1 inch = 200 feet WETLANDLOCATED USING MAPPING GRADE GPS. 1355 CALKINS ROAD A IBERDROLA INOTE CULVERT LOCATION BASED ON SURVEYED DITCH LOCATION ROCHESTER, NY 14623 r' "'- rr'1.- RENEWABLES IMPACT DITCH 18 LEGEND JURISDICTIONAL WATER (DITCH) DITCH 18 Proposed Turbine DISTURBANCE DATA: Proposed Culvert PROJECT: — Ditch Centerline IFD Parcels Impact: DITCH 18 DESERT WIND L 1 County Boundary PASQUOTANK COUNTY Weaan ds Type: Temporary NORTH CAROLINA Current Ditch Impact Area (ac): 0.0010 USACE AID #: ^O Ditch Impact DATE: 6/19/2014 Access Road PREPARED BY: N Temporary Limits of Disturbance . Removed Disturbance Area FISHER ASSOCIATES PE, LS, PC n 1 inch = 200 feet DOTE: WETLAND LOCATED USING MAPPING GRADE GPS :ULVER,T LOCATION BASED ON SURVEYED DITCH C AT ON 135 CALKINS ROAD ROCHESTER, NY 14623 . N IBERDROLA RENEWABLES NOTE WETLAND LOCATED USING MAPPING GRADE GPS CULVERT LOCATION BASED ON SURVEYED DITCH LOCATION LEGEND Proposed Turbine Proposed Culvert Ditch Centerine Road Centerline g� Parcels L1 County Boundary Wetlands QCunent Ditch Impact Ditch Impact Access Road Temporary Limits of Disturbance - Removed Disturbance Area 1 ti 1 SUN'S ACRES LLC PARCEL ID: 1 7976 - 136823 1 I ' I I I I I I 1 42 DI ANNE H. FEREBEE & WINNIE W. HUMPHRIES PARCEL ID: 7976 - 532875 JURISDICTIONAL WATER (DITCH) DISTURBANCE DATA: Impact: DITCH 42 Type: Temporary Area (ac): 0.0518 PREPARED BY: FISHER ASSOCIATES PE, LS, PC 135 CALKINS ROAD ROCHESTER, NY 14623 DITCH 42 PROJECT: DESERT WIND PASQUOTANK COUNTY NORTH CAROLINA USACE AID #: DATE: 6/19/2014 a N 1 inch = 200 feet tDROLA l 1.. Ilk .�,;�.��r- .i.�ir -. A RENEWABLE5 ` WrII3 R! \ / r IMPACT D609 r / Gcy / r IMPACT: D609 r � IMPACT: D609 ' r IMPACT: D609 IMPACT: D609 / f r WEYERHAEUSER COMPANY PARCEL ID: 7966- 755721 IMPACT: D609 WTG:.R7 �WTO !\ ORM ' 9 r REMOVED r DITCH D609 DISTURBANCE AR EA Area (ac): NOTE WETLAND LOCATED USING MAPPING GRADE GPS CULVERT LOCATION BASED ON SURVEYED DITCH LOCATION LEGEND Proposed Turbne r_ Proposed Culvert -- Ditch Centedine Parcels L1 County Boundary Wetlands OCurrent Ditch Impact Ditch Impact i Access Road OTemporary Limits of - . --ance . Removed Disturbance Area Ditch Disturbance Area Removed � 0.0550 JURISDICTIONAL WATER (DITCH) DISTURBANCE DATA: Impact: D609 Type: Temporary Area (ac): 0.2509 Permitted Area (ac): 0.3059 PREPARED BY: FISHER ASSOCIATES PE, LS, PC 135 CALKINS ROAD ROCHESTER, NY 14623 tirrt " DITCH: D609 PROJECT: DESERT WIND PASQUOTANK COUNTY NORTH CAROLINA USACE AID #: DATE 6/19/2014 N 1 inch = 400 feet A IBERDROLA RENEWABLES \ \ ' \c ` l / \ 9 rai R7,, \. /' ♦,� �NPA'. J��/ PLATFOWNI \ \ \ J \ \ \ \ C / REMOVED \ �� DITCH D613 \ \ DISTURBANCE AREA Area (ac): 0.0559 \ WEYERHAEUSER COMPANY PARCEL ID: IMPACT: 7966- 766721 D613 \MAPACT D613 \ \ \ \ NOTE. WETLAND LOCATED USING MAPPING GRADE GPS`\ \ CULVERT LOCATION BASED ON SURVEYED DITCH \ LOCATION LEGEND JURISDICTIONAL WATER (DITCH) DITCH: D613 '- ,l Proposed Turbine DISTURBANCE DATA: Proposed Culvert PROJECT: - Ditch Centerline s ,L� Parcels Impact: D613 DESERT WIND L 1 County Boundary PASQUOTANK COUNTY Wetlands Type: Temporary NORTH CAROLINA a Current Ditch Impact Area (ac): 0.0544 USACE AID #. Ditch Impact Permitted Area (ac): 0.1103 DATE: 6/19/2014 Access Road Fj Temporary Limits of Disturbance PREPARED BY: j\1 - Removed Disturbance Area FISHER ASSOCIATES PE, LS, PC 1 inch = 200 feet Ditch Disturbance Area Removed 135 CALKINS ROAD IBERDROLA ROCHESTER, NY 14623 r ISHERA'- — '. . °. - - RENEWABLES AFT-WAA NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Tracy E. Davis, PE, CPM Director Land Quality Section February 24, 2014 Atlantic Wind, LLC Attn' Mr. Erik Lallum, VP, Engineering & Construction 2 Radnor Corp. Ctr Suite 200, 100 Matsonford Rd. Radnor, PA 19087 Pat McCrory, Govemor John E. Skvada, III, Secretary Subject: Permit No. SW7111202 Modification Desert Wind Low Density Stormwater Project Pasquotank & Perquimans County Dear Mr. Lallum: The Washington Regional Office received a complete Stormwater Management Permit Application for the modification of the low density areas of Desert Wind (Route 17 Access Road addition). Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008 -211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7111202MOD dated February 24, 2014, for the continued construction of the subject project. The permit issued for this project on July 23, 2013 is hereby rescinded and replaced by this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611 -7447, Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 946 -6481. S1, cerelyr Scott Vinson Environmental Engineer G- \L R \SW P \SAV\G- Stormwater\ P E R M IT\SW7111202 M O D -3 cc: Steven Wilkinson, Fisher Associates, Rochester, NY Pasquotank County Planning Perquimans County Planning Washington Regional Office Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 - Phone: 252 -946 -6481 / FAX: 252- 975 -3716 Internet: http: / /www.pogal.ncdenr,org /web /Ir /land- quality An Equal Opportunity / Affirmative Action Employer - 501ARecycled/lIN6 Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION'OF ENERGY, MINERAL, AND LAND RESOURCES STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Atlantic Wind, LLC - Desert Wind (Access Roads 7-9, 18, 20, 22 -33 & 36, Roads to WTGs, Plan Sheets 1 -18 & 19 -31 & Route 17 Access) Pasquotank & Perquimans County FOR THE construction, operation and maintenance of a low density development in compliance with the provisions of Session Law 2008 -211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources and considered a part of this permit. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS 1. This permit covers the construction of the previously permitted 400,704 square feet (9.2ac) of built -upon area over the 43.6 acre project area for the Access Roads 7, 8, & 9 and the roads to WTGs as well as the previously proposed 12.9 acres of built upon area which includes the road improvements to 16.2 miles of existing farm path roads, 3.5 miles of new roads and 34 of the 150 total turbine locations. The previous proposal for development approved under this Stormwater permit included the improvements to an additional 12.5 miles of existing access roads (18, 20, 22 -33 &36) as well as 4.3 miles of new access roads and an additional 27 turbine locations. The current modification includes the addition of an access road into the development off Highway 17/158 and includes an additional improvement to 3.2 miles of existing road and the total impervious area within this part of the project area, which drains to the Pasquotank River, will increase from 6.7 acres to 7.6 acres of impervious area. The total impervious area approved increases from 31.1 acres to 32.0 acres proposed. 2. The overall tract built -upon area percentage for the project must be maintained at 24 %, as required by Session Law 2008 -211 and Section 2H .1005 of the stormwater rules. 3. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit and shall be kept on file by the permittee at all times. Page 2 of 5 4. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 5. No piping is allowed except that minimum amount necessary to direct runoff beneath an impervious surface such as a road or to provide access. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent streams or other surface waters. 7. Roof drains must terminate at least 50 foot from the Mean High Water line. IL SCHEDULE OF COMPLIANCE 1. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 2. The Director may notify the permittee when the permitted site does not meet one or more ' of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 3. This project may not be sold or subdivided in whole or in part without first receiving a permit modification from the Division. 4. Prior to the subdivision and /or sale of this project, in whole or in part, the following deed restrictions must be recorded with the Office of the Register of Deeds: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7111202, as issued by the Division of Energy, Mineral, and Land Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral, and Land Resources. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Energy, Mineral, and Land Resources. f. This project is permitted for a maximum of 32.0 acres of built -upon area. Construction of additional built -upon area in excess of this amount will require a permit modification. g. This project may not be sold or subdivided, in whole or in part, without first receiving a permit modification from the Division. h. Construction of additional impervious areas such that low- density requirements are no longer met will require a permit modification prior to construction. An engineered system will be required to collect and treat the runoff from all built - upon area associated with the project, including that area permitted under the low density option. i. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with this development, except for average driveway crossings, is strictly prohibited by any persons. j. The built -upon areas shall be located a minimum of 50 feet landward of all perennial and intermittent surface waters. Page 3 of 5 5 1 6 I 7 i 8 i I A copy of the recorded restrictions must be received in this Office within 30 days of the date of sale. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the permitted development, except for average driveway crossings, is strictly prohibited by any persons. Projects within DCM's Area of Environmental Concern (AEC) are subject to a reduction of the permitted amount of built -upon area due to CAMA jurisdiction within the AEC. The most restrictive of the two numbers shall be considered the maximum BUA. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. b. C. d. e. f Any revision to the approved plans, regardless of size. Project name change. Transfer of ownership. Redesign or addition to the approved amount of built -upon area. Further subdivision, acquisition, or sale of the project area in whole or in part. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. Filling in, altering or piping any vegetative conveyance shown on the approved plan. 9 Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built - upon surface. 10 During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 11 The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b Sediment removal. C. Mowing, and re- vegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 12. Within 30 days of completion of the project, the permittee shall certify in writing that the project has been constructed in accordance with the approved plans. 13. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. The Director may require modification or revocation and re- issuance of the permit to change the name and incorporate such other requirements as may be necessary. In the event of a name or ownership change, a completed Name /Ownership Change form, signed by both parties, must be submitted to the Division of Energy, Mineral, and Land Resources accompanied by the supporting documentation. The approval of this request will be considered on its merits, and may or may not be approved. Page 4 of 5 2. The permittee is responsible for compliance with all permit conditions until the Director approves a transfer of ownership. Neither the sale of the project nor the transfer of common areas to a third party, such as a homeowner's association, constitutes an approved transfer of the stormwater permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Energy, Mineral, and Land Resources, in accordance with North Carolina General Statutes 143- 215.6A to 143 - 215.6C. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Session Law 2008 -211 and Title 15A NCAC 21-1.1000 of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143 -215.1 et. al. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants permission to DENR Staff to enter the property during normal business hours, for the purpose of inspecting all components of the stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re- issuance, or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the swales must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state and federal), which have jurisdiction. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. Permit issued this the 24th day of February, 2014. 1AENT COMMISSION - '-- l-�7 "�'e----- - --5�� t!!r�- — =- - - - - -- for Tracy E. Davis, PE, CPM Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Permit No. SW7111202 Modification Page 5 of 5 NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E Davis, PE, GPM Pat McCrory, Governor Director John E Skvada, III, Secretary February 4, 2014 LETTER OF APPROVAL WITH MODIFICATIONS Atlantic Wind, LLC ATTN: Mr. Eric Lallum, Authorized Representative 2 Radnor Corp. Center Suite 200 100 Matsonford Road Radnor, Pennsylvania 19087 RE: Erosion and Sedimentation Control Plan No. Pasqu -2014 -005 Project Name: Desert Wind — Route 17 Access Location: US Highway 17 County: Pasquotank River Basin: Pasquotank Date Received by LQS: January 10, 2014 Acres Approved: 9.7 Project Type: New Project Description: Grading associated with the improvement of 3.2 miles of roadway, as shown on plan received by this office on January 10, 2014 and the additional information received on January 29, 2014. Dear Sir: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The modifications required for approval are listed on the attached pages. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as required by 15A NCAC 4B.0129, unless modified by other legislation. Please be advised that 15A NCAC 4B.01 18(a) requires that a copy of the approved erosion and sedimentation control plan be on file at the job site. Also, you should consider this letter as giving the Notice required by G.S. 113A- 61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (G.S. 113A -51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations and rules. In addition, local city or county ordinances or Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 - Phone 252 - 946 -6481 / FAX 252- 975 -3116 Internet http / /www portal ncdenr org /web /Ir /land-qualily An Equal opportunity / Affirmafive Action Employer - 50% Recycled /10% Post 0onsumer Paper Atlantic Wind, LLC ATTN: Mr. Eric Lallum. Authorized Representative February 4, 2014 Page 2 rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility /Ownership Form, which you have submitted. You are required to file an amended form if there is any change in the information included on the form. NOTE: Neither this approval nor the financial responsibility /liability cited in it automatically transfer with a change in project ownership. In addition, 15A NCAC 413.0127(c) requires that you notify this office of the proposed starting date for this project (using the enclosed Project Information Sheet). Please notify us if you plan to have a preconstruction conference. Please be aware that your project will be covered by the enclosed NPDES General Storinwater Permit NCG010000 (Construction Activities). You should first become familiar with all of the requirements for compliance with the enclosed permit. Sincerely, Richard Peed, CPESC Assistant Regional Engineer Enclosures cc w/o enc: %�teven D. Wilkinson, Fisher Associates WaRO Surface Water Operation Section Supervisor, Division of Water Resources I-, (J C,' Erosion and Sedimentation Control Plan No. Pasqu- 2014 -005 Project Name: Desert Wind — Route 17 Access February 4, 2014 Modifications Page 1 AS THE DECLARED RESPONSIBLE PARTY, YOUR LEGAL RESPONSIBILITY is to understand the Act and comply with the following rninimurn requirements of the Act: A. In the event of a conflict between the requirements of the Sedimentation Pollution Control Act, the submitted plan and /or the contract specifications, the more restrictive requirement shall prevail; B. The land - disturbing activity shall be conducted in accordance with the approved erosion and sedimentation control plan; C. The LATEST APPROVED erosion and sediment control plan will be used during periodic unannounced inspections to determine compliance and a copy of the plan must be on file at the job site. If it is determined that the implemented plan is inadequate, this office may require the installation of additional measures and /or that the plan be revised to comply with state law; D. All revisions, including those required by other local, state or federal agencies, which affect site layout, drainage patterns, limits of disturbance and /or disturbed acreage must be submitted to this office for approval a minimum of 15 days prior to the start of construction; E. Revisions exceeding the approved scope of this project without prior approval of the plan showing the changes can be considered a violation. Failure to comply with any part of the approved plan or with any requirements of this program could result in appropriate legal action (civil or criminal) against the financially responsible party. Legal actions include Stop Work Orders and the assessing of a civil penalty of up to $5000 for the initial violation plus an additional penalty of up to $5000 per day for each day the site is out of compliance; F. The CERTIFICATE OF PLAN APPROVAL must be posted at the primary entrance to the job site and remain until the site is permanently stabilized; G. In cases of natural disaster related changes to the proposed land disturbing activity, all appropriate actions and adequate measure installations may be performed to prevent sediment damage, prior to submitting and receiving approval of the revised plan. A revised plan inust be submitted for approval as soon as possible, but no later than 15 days after all emergency actions have been performed; Erosion and Sedimentation Control flan No. Pasqu- 2014 -005 Project Name: Desert Wind — Route 17 Access February 4, 2014 Modifications Page 2 H. Erosion and sediment control measures or devices are to be constructed and /or installed to safely withstand the runoff resulting from a 10 year storm event (25 year storm event in High Quality Zones). The 10 year storm event is generally equivalent to a storm producing 6.5 - 7 inches of rain in 24 hours or at the rate of 6.5 - 7 inches of rain in 1 hour, depending on the location of the project within the region; No earthen material is to be brought on or removed from the project site, until the off -site borrow and /or disposal sites are identified as part of the erosion control plan. If an off -site borrow and /or disposal site is to be utilized, prior to the start of construction submit the name and identification number (E &SCP # or Mine Permit #) using the enclosed Project Information Sheet; J. Buffer zone, sufficient to restrain visible sedimentation within the 25% of the width closest to the land disturbance, must be provided and maintained between the land - disturbing activity and any adjacent property or watercourse; K. In order to comply with the intent of the Act, the scheduling of the land - disturbing activities is to be such that both the area of exposure and the time between the land disturbance and the providing of a ground cover is minimized; L. Unless a temporary, manufactured, lining material has been specified, a clean straw mulch must be applied, at the minimum rate of 2 tons /acre, to all seeded areas. The mulch must cover at least 75% of the seeded area after it is either tacked, with an acceptable tacking material, or crimped in place; M. New or affected cut or filled slopes must be at an angle that can be retained by vegetative cover, AND must be provided with a ground cover sufficient to restrain erosion within 21 calendar days of completion of any phase (rough or final) of grading (ANNUAL RYE GRASS IS NOT in the APPROVED seeding specifications NOR is it an ACCEPTABLE substitute for the providing of a temporary ground cover); N. A permanent ground cover, sufficient restrain erosion, must be provided within the shorter of 15 working or 90 calendar days (if in a High Quality Zone, the shorter of 15 working or 60 calendar days) after completion of construction or development on any portion of the tract (ANNUAL RYE GRASS IS NOT in the APPROVED seeding specifications NOR is it an ACCEPTABLE substitute for the providing of a nurse cover for the permanent grass cover); Erosion and Sedimentation Control Plan No. Pasqu -2014 -005 Project Name: Desert Wind — Route 17 Access February 4, 2014 Modifications Page 3 O. All sediment and erosion control details for this project must conform to the standards as shown in the current Erosion & Sediment Control Planning and Design Manual, these details must be utilized for construction and incorporated in the plan. The manual can be found online at http: / /poilal.ncdenr.org /web /lr /publications 2. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on -site natural watercourse or adjoining property. 3. In the absence of adequate and appropriate seeding specifications being provided by the adjoining farmers, as stated in your plan. This office recommends you reference the applicable sections of the Erosion & Sediment Control Planning and Design Manual (Sections 6.10 & 6.11) to obtain the appropriate seeding specifications. These specifications must be utilized for construction and incorporated in the plan. 4. Additional adequate and appropriate measures are suggested to be installed at the downstream end /work area during the installation of any new or modified culvert to prevent sediment from leaving the work area. 5. In the event of a conflict between the requirements of the Sedimentation Pollution Control Act, the NCDOT encroachment agreement and the contract specifications, the more restrictive requirement shall prevail. 6. Silt fences, including outlet sections, are not appropriate for areas of concentrated flow such as swales or ditches. Provide adequate and appropriate measures for all construction within areas of concentrated flow. 7. All slopes affected during the installation/cleanup process must be provided with an angle that can be retained by vegetative or other appropriate cover. PROJECT INFORMATION SHEET APPROVAL DATE: RESPONSIBLE PARTY PROJECT NAME: COUNTY: OFF -SITE BORROW AND /OR DISPOSAL SITE: START -UP DATE: CONTRACTOR: ON -SITE CONTACT: ON -SITE PHONE NO.: OFFICE PHONE NO.: Febmary 4. 2014 Atlantic Wind, LLC Desert Wind — Route 17 Access Pasquotank NO.: Pasqu- 2014 -005 NO.: COMPLETE & RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.N.R. LAND QUALITY SECTION ATTN: Chris Pullinger 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 7 U O 4-j cd• cd U 'd ,�? cld W d- U CJ •-� `n 4J d U $::., M •� U CTS ® � N ct Ln ct3 GARO((N� 4 � N � r. Ilk , U aft U ct ct V 44 ~ f- cn U u ..- C'd b p b a ° ° �' h 0i >��w �-4--Jv U y 0 'd ct .b Q, C ' r b n "d ct3 C� 4--+ 0 p IT:$ U cn S e Q North Carolina Department of Cultural Resources State Historic Preservation Office Ramona M. Banos, Administrator Beverly Eaves Perdue, Governor Office of Archives and History Linda A Carlisle, Secretary Division of Historical Resources Jeffrey J Crow, Deputy Secretary David Brook, Director December 13, 2011 Michael B. Homum, Ph.D. R. Christopher Goodwin & Associates, Inc. 241 East Fourth Street Suite 100 Frederick, MD 21701 Re: Phase I Archaeological Survey for the Proposed Desert Wind Energy Project, Supplemental Investigations, Pasquotank and Perquimans Counties, ER 11 -0157 Dear Dr. Hornum: Thank you for your letter of November 16, 2011, transmitting the archaeological survey supplemental report for the proposed Desert Wind Energy Project. We have reviewed this report and offer the following comments. Archaeological survey was conducted within 97.52 additional acres of the project area using acceptable field methods. No additional archaeological sites were recorded as a result of this effort. The report concludes that no significant historic properties will be impacted within the supplemental area by the proposed undertaking. No further work is recommended. We concur with this recommendation. Site 31PQ223 was noted within the initial survey report to be outside of any areas of impact. The recommended buffer zone around this site has been changed in the interim from "no closer than 8 feet from the 25 feet wide buffer zone" to "no closer than 8 feet from the site." The report recommends no further work so long as the site is fenced off from the construction. We concur with this recommendation and suggest that the fencing be placed no closer than eight (8) feet to the site prior to commencement of any other construction activities. We still support continued avoidance of this site. If avoidance can be maintained by fencing, then no further work is recommended. If avoidance is not possible, then Phase II testing is recommended. The report meets our office's guidelines and those of the Secretary of the Interior. Please forward two copies of the final report to our office. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Location: 109 East Jones street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699 -4617 Telephone /Fax: (919) 807 - 6570/807 -6599 Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill- Earley, environmental review coordinator, at 919- 807 -6579. In all future communication concerning this project, please cite the above - referenced tracking number. Sincerely, (L..' u� -tc Ramona A Bartos