Loading...
HomeMy WebLinkAbout20230094 Ver 1_More Info Received_20230515 (3)Revised Proposed Impacts Inventory Wetland Impacts 2a. Site # 2a1. Reason 2b. Impact type 2c. Type of W. 2d. W. name 2e. Forested 2f. Type of Jurisdiction 2g. Impact area WA Pipe crossing 1 T PFO W1 Yes Both 0.28 WB Maintenance corridor P PFO W1 Yes Both 0.53 WC Pipe crossing 2 T PEM W2 No Both 0.08 WD Pipe crossing 3 T PEM W3 No Both 0.07 WE Pipe crossing 4 T PEM W4 No Both 0.33 WF I Limits of disturbance 1 IT 1PEM JW5 INo lBoth 0.005 Stream Impacts 3a. Reason for impact 3b. Impact type 3c. Type of impact 3d. S. name 3e. Stream type 3f. Type of jurisdiction 3g. S. width 3h. Impact length S1 Pipe crossing 1 T Excavation SA Perennial Both 7 82 S2 Intake impact 1 T Dewatering Cape Fear River Perennial Both 247 133 S3 Intake impact 2 P Fill Cape Fear River Perennial Both 5 52 S4 Pipe crossing 2 T Excavation SB Intermittent Both 4 69