HomeMy WebLinkAbout20230704 Ver 1_Site Plan_20230520 State of North Carolina
Department of Environment and Natural Resources
Division of Water Resources
Water Resources 15A NCAC 02H.0500—Water Quality Certification,Shoreline Stabilization
ENVIRONMENTAL.QUALITY FORM: SSGP 02-2017
Shoreline Stabilization Application Form
Three copies of the application (including attachments) and the application fee should be sent to:
If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.)
Paul Wojoski Paul Wojoski
DWR-401 & Buffer Permitting Branch DWR-401& Buffer Permitting Branch
1617 Mail Service Center 512 N. Salisbury Street
Raleigh, NC 27699-1617 Raleigh, NC 27604
A. Applicant Information [15A NCAC 02H .0502(a)]
1. Owner Information
Name: William Biggers and Kate Kovats
Mailing Address: r24v-�rurci
Charlotte, NC 2828W-- 2�2U?i
Telephone Number: (919)265-4978 Fax Number: N/A
E-mail Address: william.p.biggers@gmail.com
2. Agent/Contact Person Information
A signed and dated copy of the Agent Authorization letter must be attached if the Agent has
signed this application form. (A form can be downloaded here:
http•//www saw usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ
ATION FORM.pdf)
Name: Charlie Washburn
Company Affiliation: Marine Construction LLC
Mailing Address: PO Box 6400
Hickory NC 28603
Telephone Number: 828-495-3040 Fax Number: N/A
E-mail Address: office@marineconstructionilc.com
B. Project Information [15A NCAC 02H .0502(a) & (b)]
1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with
respect to local landmarks such as towns, rivers, and roads.
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation
or dredging below Full Pond/Normal Water Level elevations, and construction access
corridors. You may use the diagram provided at the end of this application form.
FORM:SSGP 02-2017 Page 1 of 3
3. Attach a photograph of the shoreline/buffer proposed to be stabilized. (Include a scale of
some sort-a yard stick,shovel handle, etc.)
4. Location of the property(where work is to be conducted)
County: Burke Nearest Town: Connelly Springs
Lake/river/ocean adjacent to property: Lake Rhodhiss
Property size (acres): 1.55
Subdivision name or site address (include phase/lot number):
Lot 215 Paradise Harbor East Extension Phase 2
Directions to site-please include road names and numbers, landmarks, etc.:
Included in packet
Latitude (in decimal degrees) 35.781 Longitude (decimal degrees) -81.470
S. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc.): ResidentialUndeveloped
6. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary):
We plan to stabilize the shoreline with riprap to prevent further erosion and construct
a floating dock.
7. Will work be conducted from land? x From water?
8. Total amount of impacts below the normal pool lake level/ Normal Water Level
Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet:
304 sgft
Temporary impacts in square feet:
0 sgft
9. Total amount of impacts above the normal pool lake level /Normal Water Level and 50 feet
land-ward
Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet:
304 sgft
Temporary impacts(temporary clearing, construction corridor) in square feet:
(Construction corridor= 1,520 sqft)
10. Please describe the vegetation above the normal pool lake level/Normal Water Level and 50
feet landward to be impacted (number of trees,for instance): The lot is wooded.
We plan to remove 14 trees but will replant 1 for 1 with native hardwood trees.
11. Signature -'
�! qrr1I
I2VZ
Owner/Agent's Signature* [15A NCAC 02H .0502(f)] 'Ate
#Agent's signature is valid only if an authorization letter from the owner is provided.
FORM:SSGP 02-2017 Page 2 of 4
12. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks,etc.
e. Location of any excavation or dredging below the Full Pond/Normal Water Level elevation
La ke
�At Full Pond/Normal water Level)
UlmFull Pond/ Normal Water Level
� w�.Pond IN W
Shoreline aR, ISar+'Alwe,
Ib
Fk. x Sac �ocGho� cacr 01 Pad/N wL
tAb G`ean�� N� G1�an�ao
Plan View
Lake
(At full Pond/Normal Water Level)
Existing Dock
- 3ftx lSOk
Below full pond/NWL
Full Pond/Normal Water Lev6"3D
ore
line "r•� ft 150 tAbove full pond/NWL
2(t.z 150 ft.
additional clearing
if necessary
l ._:� AMPLE
1 I
Plan View
FORM:SSGP 02-2017 Page 3 of 4
—A1(�rAkari 0I
a�t X 15af� We �a�n � r�Ove I�t Ire�s.
�W� P�11 his c�lan�ed w��1� a.5"
n d►0pa er of reaw- Pt1\fic ee s w 11
Lake be (�or�n I�CDo. �camrn�d�d
(At Full Pond/Normal Water Its . ��� c2plU�keC�l �t'@.2b ln►�11 ��
� UA ad.�.a�,u m6l am Q►gnted �n t'he
d\o(mo n� Seasv\ko �X)w rnA,c�mum
0 S 0 cuss.
Nw� p V
0
Side View
LL-
additional clearing
Ii 3 ft.below full pond waterer level 4 ft.above full pond water level 2 ft.*if necessary
Existing bank
10 ft.bank Zj
height
Q
Side View - '
FORM:SSGP 02-2017 Page 4 of 4