Loading...
HomeMy WebLinkAboutNCG030293_2022 DMR_20221128 elSHIELD ENGINEERING November 21,2022 Shaun Lee CIRCOR Pumps North America LLC 1710 Airport Road Monroe, North Carolina 28110 Subject: Stormwater Sampling—October 2022 Certificate of Coverage No. NCG030293 CIRCOR Pumping Technologies—Monroe,NC Shield Project No. 1150109-19 Dear Mr. Lee: There were no qualifying rainfall events for the month of October 2022 as defined by General Permit No. NCG030000.As a result,no monthly stormwater samples were collected for Stormwater Discharge Outfall (SDO)#004 at the CIRCOR Pumps North America LLC—Monroe facility this month. According to rainfall data' collected for the month, three rain events or group events occurred on October 1st,October 126, and October 30th,producing 0.09 inches,0.05 inches,and 1.06 inches of rain, respectively. However,each of these events took place after normal business hours, within 72 hours of the last rain event, or did not produce enough rainfall to collect a sample. Shield will continue to monitor daily weather conditions and attempt coordination of appropriate staff and resources to facilitate adequate sample collection. A partially completed Discharge Monitoring Report form is attached to this cover letter for signature of the appropriate authorized permittee and submittal to the State. CIRCOR remains in Tier Three for Copper at SDO #004. Shield greatly appreciates the opportunity to provide environmental services to CIRCOR. If you have any questions in reference to this document or require further information, please feel free to contact the undersigned at(704)394-6913. Respectfully, SHIELD ENGINEERING,INC. Magdaline Tzannis Robert L. Griffin, PE Senior Project Manager VP NC Operations Melind . Greene Senior Engineer Attachments: DMR, QMR,Analytical Report—October 2022 'Rainfall data collected by a USGS rain gauge,>1 mile from the facility. 4301 Taggart Creek Road www.shieldeneineering.com Telephone 704.394.6913 Charlotte, NC 28208 License No. F-0856 NCDEQ Division of Energy,Mineral and Land Resources Stormwater Discharge Monitoring Report (DMR) Form for NCG030000 Metal Fabrication Click here for instructions Complete,sign,scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report(DMR)Upload form within 30 days of receiving sampling results. Mall the original,signed hard copy of the DMR to the appropriate DEMLR Regional Office. Certificate of Coverage No. NCGO3 0293 Person Collecting Samples: NA Facility Name:Circor Pumping Technologies Laboratory Name: NA Facility County: Union Laboratory Cert. No.:NA Discharge during this period:❑Yes D No (if no,skip to signature and date) Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances?D Yes No If so,which Tier(I, II,or III)? A copy of this DMR has been uploaded electronically via https://edocs.deq.nc.gov/Forms/SW-DMR a Yes No Date Uploaded: Analytical Monitoring Requirements for Outfalls with Industrial Activities—Benchmarks in(Red) Parameter Parameter Outfall 004 Outfall 005 Outfall Outfall Outfall Code N/A Receiving Stream Class C C N/A Date Sample Collected MM/DD/YYYY NQE 46529 24-Hour Rainfall in inches C0530 TSS in mg/L(100 or 50*) 00400 pH in standard units(6.0-9.0 FW, 6.8-8.5 SW) 01119 Copper,total recoverable in mg/L (0.010 FW,0.0058 SW) 01051 Lead,total recoverable in mg/L (0.075 FW,0.22 SW) 01094 Zinc,total recoverable in mg/L(0.126 FW,0.095 SW) 00340 Chemical Oxygen Demand(COD)in mg/L(120) 00552 Non-Polar Oil&Grease in mg/L(15) *Outfalls to Outstanding Resource Waters(ORW),High Quality Waters(HOW),Trout Waters(Tr)and Primary Nursery Areas(PNA) have a benchmark TSS limit of 50 mg/L.All other water classifications have a benchmark of 100 mg/L FW(Freshwater)SW(Saltwater) Notes(optional): No Qualifying Event this period(10/2022)for SDO#004.SDO#005 is on a quarterly schedule. "I certify by my signature below,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." 1) Signature of Per ittee o egated Authorized Individual Dat shy. . i--p��C:ram' . 1A 6 a Email Address Phone Number