HomeMy WebLinkAbout20221081 Ver 2_More Info Requested_20230519From: Snider, Hollev
To: Nick Tudor
Cc: Beecher, Gary H CIV USARMY CESAW (USA); John Wall; Jamison Fair; Kate Hefner
Subject: RE: [External] RE: 401 Individual Certification required for Southport Meadows project in Brunswick County, NC
(SAW-2022-00375)
Date: Friday, May 19, 2023 1:23:00 PM
Attachments: image004.pnng
image005.ong
20221081 Southport Meadows IWQC BrunsCo Oct.22.docx.pdf
Good afternoon Nick,
Per our phone conversation, please quantify and clarify what impacts were previously covered by
the attached DWR 401 Individual Water Quality Certification. Thanks in advance and feel free to call
or email me if you have any questions.
Sincerely,
Holley Snider ,������°>•, .. ..><((((°>.• -
Environmental Specialist II
Division of Water Resources
North Carolina Department of Environmental Quality
Phone: (910) 796-7303
*please note my email address has changed holley.sniderPdeq.nc.gov*
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Nick Tudor <Nick.Tudor@timmons.com>
Sent: Thursday, May 11, 2023 12:37 PM
To: Snider, Holley <holley.snider@ncdenr.gov>
Cc: Beecher, Gary H CIV USARMY CESAW (USA)<Gary.H.Beecher@usace.army.mil>; John Wall
<John.Wall@timmons.com>; Jamison Fair <Jamison.Fair2@PulteGroup.com>; Kate Hefner
<Kate.Hefner@timmons.com>
Subject: [External] RE: 401 Individual Certification required for Southport Meadows project in
Brunswick County, NC (SAW-2022-00375)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Hey Holley —
Hope you are having a great week, just wanted to follow up on the status of Southport Meadows.
It is my understanding that the 120-day review period expires on July 22, 2023.
Please let me know if you need additional information for your review.
Thanks,
Nick Tudor, PWS
Senior Environmental Scientist
T DNS GROUP
LLi GLNkhR+LiG I OLSIGH I TEGFIMOLOGY
TIMMONS GROUP www.timmons.com
430 Eastwood Road Suite 100 1 Wilmington, NC 28403
Office: 984.222.1616
Mobile: 540.589.8249
nick.tudor2timmons.com
Your Vision Achieved Through Ours
To send me files greater than 20MB click here.
From: Nick Tudor <Nick.Tudor(@timmons.com>
Sent: Tuesday, April 18, 2023 9:45 AM
To: Snider, Holley <holley.sniderPncdenr.gov>
Cc: Beecher, Gary H CIV USARMY CESAW (USA)<Gar)z.H.Beecher(@usace.army.mil>
Subject: RE: 401 Individual Certification required for Southport Meadows project in Brunswick
County, NC (SAW-2022-00375)
Hey Holley —
Just checking in on the status of Southport Meadows. Please let me know if you need additional
information for your review.
Thanks,
Nick Tudor, PWS
Senior Environmental Scientist
T]Mt ONS GROUP
IRGIREERING. I Cl31GM I TECKNOLOGY
TIMMONS GROUP I www.timmons.com
430 Eastwood Road I Suite 100 1 Wilmington, NC 28403
Office: 984.222.1616
Mobile: 540.589.8249
nick.tudorna timmons.com
Your Vision Achieved Through Ours
To send me files greater than 20MB click here.
From: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher(@usace.army.mil>
Sent: Tuesday, April 11, 2023 9:04 AM
To: Nick Tudor <Nick.TudorPtimmons.com>
Cc: Snider, Holley <holley.sniderCcDncdenr.gov>
Subject: 401 Individual Certification required for Southport Meadows project in Brunswick County,
NC (SAW-2022-00375)
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
ALCON,
North Carolina Division of Water Resources (NCDWR): After review of the submitted [Southport
Meadows, SAW-2022-00375], dated [March 24, 2023], and the enclosed Nationwide Permit
[29] Water Quality General Certification (GC) [ex. No. 4256], dated March 15, 2021, it appears
that an individual 401 water quality certification (WQC) is required from the NCDWR for the
proposed activities.
The ePCN received by our office on March 24, 2023, provided the 9 required elements for an
individual WQC. This permit application/ePCN, dated March 24, 2023 constitutes the Corps
initial receipt of the 401 WQC application. Unless NCDWR is granted a time review extension,
a waiver will be deemed to occur if the NCDWR fails to act on this request for certification
within 120 days from the date of the complete 401 request. The reasonable period of time
(RPOT) for you to act on this WQC request is 120 calendar days. The date upon which the
waiver will occur if you fail or refuse to act on the certification is July 22, 2023.
If our assumption is incorrect and this proposed activity does not require an Individual WQC,
please respond to this notification as soon as possible in order for our office to meet the
Corps' Nationwide Permit 45-day review requirement.
Applicant/Consultant: Please note, should we finalize our review prior to receiving the 401
WQC, you will receive a provisional general permit verification from the Corps. Once a 401
WQC is issued or waived by the DWR, the Corps will provide you with a final general permit
verification. Your proposed work shall not commence until after the 401 WQC has been
issued or waived AND until a final general permit verification has been provided to you.
Respectfully,
Gary
M
US Army Carp;
of Engineers
:' iminrgtrIn Digtrir
Gary Beecher
USACE Wilmington Field Office
Regulatory Project Manager
Office (910) 251-4694
Cell (910) 473-7045
gary.h.beecher(@usace.army.mil