Loading...
HomeMy WebLinkAbout20221081 Ver 2_More Info Requested_20230519From: Snider, Hollev To: Nick Tudor Cc: Beecher, Gary H CIV USARMY CESAW (USA); John Wall; Jamison Fair; Kate Hefner Subject: RE: [External] RE: 401 Individual Certification required for Southport Meadows project in Brunswick County, NC (SAW-2022-00375) Date: Friday, May 19, 2023 1:23:00 PM Attachments: image004.pnng image005.ong 20221081 Southport Meadows IWQC BrunsCo Oct.22.docx.pdf Good afternoon Nick, Per our phone conversation, please quantify and clarify what impacts were previously covered by the attached DWR 401 Individual Water Quality Certification. Thanks in advance and feel free to call or email me if you have any questions. Sincerely, Holley Snider ,������°>•, .. ..><((((°>.• - Environmental Specialist II Division of Water Resources North Carolina Department of Environmental Quality Phone: (910) 796-7303 *please note my email address has changed holley.sniderPdeq.nc.gov* 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Nick Tudor <Nick.Tudor@timmons.com> Sent: Thursday, May 11, 2023 12:37 PM To: Snider, Holley <holley.snider@ncdenr.gov> Cc: Beecher, Gary H CIV USARMY CESAW (USA)<Gary.H.Beecher@usace.army.mil>; John Wall <John.Wall@timmons.com>; Jamison Fair <Jamison.Fair2@PulteGroup.com>; Kate Hefner <Kate.Hefner@timmons.com> Subject: [External] RE: 401 Individual Certification required for Southport Meadows project in Brunswick County, NC (SAW-2022-00375) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hey Holley — Hope you are having a great week, just wanted to follow up on the status of Southport Meadows. It is my understanding that the 120-day review period expires on July 22, 2023. Please let me know if you need additional information for your review. Thanks, Nick Tudor, PWS Senior Environmental Scientist T DNS GROUP LLi GLNkhR+LiG I OLSIGH I TEGFIMOLOGY TIMMONS GROUP www.timmons.com 430 Eastwood Road Suite 100 1 Wilmington, NC 28403 Office: 984.222.1616 Mobile: 540.589.8249 nick.tudor2timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Nick Tudor <Nick.Tudor(@timmons.com> Sent: Tuesday, April 18, 2023 9:45 AM To: Snider, Holley <holley.sniderPncdenr.gov> Cc: Beecher, Gary H CIV USARMY CESAW (USA)<Gar)z.H.Beecher(@usace.army.mil> Subject: RE: 401 Individual Certification required for Southport Meadows project in Brunswick County, NC (SAW-2022-00375) Hey Holley — Just checking in on the status of Southport Meadows. Please let me know if you need additional information for your review. Thanks, Nick Tudor, PWS Senior Environmental Scientist T]Mt ONS GROUP IRGIREERING. I Cl31GM I TECKNOLOGY TIMMONS GROUP I www.timmons.com 430 Eastwood Road I Suite 100 1 Wilmington, NC 28403 Office: 984.222.1616 Mobile: 540.589.8249 nick.tudorna timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher(@usace.army.mil> Sent: Tuesday, April 11, 2023 9:04 AM To: Nick Tudor <Nick.TudorPtimmons.com> Cc: Snider, Holley <holley.sniderCcDncdenr.gov> Subject: 401 Individual Certification required for Southport Meadows project in Brunswick County, NC (SAW-2022-00375) CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. ALCON, North Carolina Division of Water Resources (NCDWR): After review of the submitted [Southport Meadows, SAW-2022-00375], dated [March 24, 2023], and the enclosed Nationwide Permit [29] Water Quality General Certification (GC) [ex. No. 4256], dated March 15, 2021, it appears that an individual 401 water quality certification (WQC) is required from the NCDWR for the proposed activities. The ePCN received by our office on March 24, 2023, provided the 9 required elements for an individual WQC. This permit application/ePCN, dated March 24, 2023 constitutes the Corps initial receipt of the 401 WQC application. Unless NCDWR is granted a time review extension, a waiver will be deemed to occur if the NCDWR fails to act on this request for certification within 120 days from the date of the complete 401 request. The reasonable period of time (RPOT) for you to act on this WQC request is 120 calendar days. The date upon which the waiver will occur if you fail or refuse to act on the certification is July 22, 2023. If our assumption is incorrect and this proposed activity does not require an Individual WQC, please respond to this notification as soon as possible in order for our office to meet the Corps' Nationwide Permit 45-day review requirement. Applicant/Consultant: Please note, should we finalize our review prior to receiving the 401 WQC, you will receive a provisional general permit verification from the Corps. Once a 401 WQC is issued or waived by the DWR, the Corps will provide you with a final general permit verification. Your proposed work shall not commence until after the 401 WQC has been issued or waived AND until a final general permit verification has been provided to you. Respectfully, Gary M US Army Carp; of Engineers :' iminrgtrIn Digtrir Gary Beecher USACE Wilmington Field Office Regulatory Project Manager Office (910) 251-4694 Cell (910) 473-7045 gary.h.beecher(@usace.army.mil