Loading...
HomeMy WebLinkAboutSite Inspection 5.17.23 A-9Wetland Inspection Report Project Num: 20201371 Version: 1 Status: Issued Project Name: TPB NCDOT -Improvements to NC 129 and NC Project Type: New Road/Highway County: Graham43 (A-0009C) Region: Asheville Location: TPB NCDOT - Improvements to NC 129 and NC 143 (A-0009C) Latitude: Longitude: SW Plan Location: Site Owner Name: NC DOT Division 14 - Sylva Inspection Date: 5/17/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Robert K Mitchell Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Phone: page: 1 Site Number: 20201371 Owner: Blazer, Keith Inspection Date: 5/17/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Site inspection was conducted on May 17, 2023 by Kevin Mitchell with the Asheville Regional Office. Mark Davis, Crystal Amschler, Kevin Barnett, Dave McHenry, and Reid Whitehead were present during the mpsection. The following are items that need attention: Section CA - Station 114+00 LT - Triple barrel culvert on Sweetwater Creek is under construction. Work area is being dewatered. Section CB - Station 271+00 LT (Site 12)- Rip rap at outlet needs to be embedded per plan and to meet the conditions of the permit. Section CC - Station 48+00-49+50 RT (Site 11) - Channel change is piping and may need additional substrate to fill voids especially the lower end. Sediment was observed in the JS downstream of SDO. This was resolved and cleaned up on 5.18.23. Photo documentation was received on 5.18.23. - Station 67+00 RT (Site 14) - Box culvert extension is under construction. Continue to meet NPDES cover requirements. page: 2 Site Number: 20201371 Owner: Blazer, Keith Inspection Date: 5/17/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ page: 3