HomeMy WebLinkAboutSite Inspection 5.16.23 Br 26 on NC 106Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210555
TPB NCDOT - Replace Bridge 26 on NC 106
(B-0029)Macon
TPB NCDOT - Replace Bridge 26 on NC 106 (B-0029)
NC DOT Division 14 - Sylva
5/16/2023
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-83° 19' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
- Station 15+75 LT - Extend silt fence below fill slope. Stabilize slope.
- Ensure that the project is meeting the NPDES cover requirements.
NPDES records were up to date.
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted on May 16, 2023 by Kevin Mitchell with the Asheville Regional Office. Jordan Talley
was present during the inspection.
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210555
5/16/2023
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2